| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-Finance 2 1433 D 6 KAMAL COLONY SAHARANPUR UP PIN 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹2.1 Cr | L1 | Accepted-Finance Found 1st Lowest |
| 2 | L2₹2.1 CrAccepted-Finance | ₹2.1 Cr | L2 | Accepted-Finance Found 2nd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.2 Cr
EMD Value
₹5.2 L
Closing Date
7 May 2026, 5:00 pmClosed
Senior Manager (E) HQ
A-1/4 Lakhanpur, Kanpur
Supply and installation of external development work and street light network system along with 03 years AMC for entire network at IA. Orni Distt. Etah
2026_SIDC_1137972_1
ED_II_33_15042025
Open Tender
Electrical Works
Percentage
1215 days
Orni Distt. Etah
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,031
UPSIDA
₹5.2 L
31 Jul 2026
17 Apr 2026
8 May 2026
17 Apr 2026
7 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and erection of steel tubular pole 410-SP-55, 11 Mtr long, 227 Kg complete with 1/6th of overall length of pole below ground level with 45 cm dia cement concrete with 45cm dia cement plinth around the pole and 45cm above the ground level.The foundation of underground will not be less than 20 cm thick layer of cement concrete in the ration of 1:3:6 ( cement : coarse sand : over burnt brick ballast/stone ballast). The brick ballast / stone ballast will be used of 1.25 cm size with stone pad of 30X30X7.5 cm at the base. The cost includes all men and materials forproper completion of work. (It should be galvanised in first section as per technical specfications of DVVNL) | - | Nos. | - | - |
| 2 | Supply and fixing of 11 KV originating/terminating pole fitting including all T&P,men and material for proper completion of work as per UPSIDC schedule no E03.01; [ (a) MS Channel 100x50mm (7.9 kg/mtr), 1.15 mtr=1 No., (b) Straight MS channel 75X40 mm, 2.24 mtr long=1 No., (c) MS clamp made out of MS flat 50X6 mm including all bolts nuts washers=2 No., (d) Clamp for 11 kV Disc Fitting made out of MS flat 50X6 mm including all bolts nuts washers=1 No., (e) 11 KV Disc and fittings= 3 No. (f) Eye bolt 110X12 mm= 2 No.)] ( With recent specifications of DVVNL) | - | Nos. | - | - |
| 3 | Supply and fixing of 11 KV ordinary pole fitting with guarding Channel 2.24 M long instaed of Z clamps including all T&P,men and material for proper completion of work as per UPSIDC schedule no E03.02 [(a) V shape MS chhanel 75X40 (6.8 kg/mtr)=1 No., (b) Straight MS channel 75X40 mm (7.5 kg/mtr), 2.24 mtr long=1 No., (c) MS clamp made out of MS flat 50X6 mm including all bolts nuts washers=2 No., (d) Top MS cap cum F clamp with 11 kV Pin Insulator = 1 No., (e) 11 kV Pin with Insulator= 2 No. , (f) Eye bolt 110X12 mm= 2 No.)] ( With recent specifications of DVVNL) ] | - | Nos. | - | - |
| 4 | Supply and fixing of 11KV Disc fitting complete UPSIDC schedule no E03.08 | - | Nos. | - | - |
| 5 | Supply and fixing of 11KV pin insulator complete UPSIDC schedule no E03.07 | - | Nos. | - | - |
| 6 | Supply and burying of 40mm dia and 4.5M long GI pipe vertically for earthing having 12mm dia hole spaced 75mm apart drilled upto 2 mtr. From the bottom complete with earthing lead of no. 6 to 8 SWG GI wire in GI pipe upto appron upto switch board 30 CM square box with hinged cover masonary enclosure. Funnel of top, alternate layers of charcoal and salt at least 150 mm thick alround etc. as per direction E/I complete in all respect as per drawing as per UPPWD Sch. No. 701 | - | Nos. | - | - |
| 7 | S/B of 600x600x6mm GI plate vertical for earthing with its top at least 3 M. below ground level complete with 20 mm dia. GI pipe and funnel for watering andone earthing leads of no. 8 to 10 SWG GI wire in 15 mm dia GI pipe upto switch board (from appron to switch board the cost of GI pipe snd GI wire be extra)30 CM square C.I. frame with hinged cover masonary housing alternate layers of charcoal /Coke and salt at least 150 mm thick alround etc. as per direction E/I complete in all respect as per drawing as per UPPWD Sch. No. 702 | - | Nos. | - | - |
| 8 | Supply & erection of overhead line with ACSR conductor on poles / service bracket including binding etc. complete in all respects (UPPWD-2018-627) (For Dog Conductor Specifications as per DVVNL) | - | KG | - | - |
| 9 | Supply,sagging,tensioning,jointing and binding of ACSR weasel conductor including cost of aluminium tape binding wire and jointing sleeves complete in all respects including materiaI,men an T&P for proper completion of work UPSIDC schedule No E10.(a) | - | KG | - | - |
| 10 | Supply,sagging,tensioning,jointing and binding of ACSR Rabbit conductor including cost of aluminium tape binding wire and jointing sleeves complete in all respects including materiaI,men an T&P for proper completion of work as per UPSIDC schedule No E10.10 | - | KG | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
AMCgeneraltermsandcondition.pdf
Tender Documents • 0.06 MB
etenderdocument.pdf
Tender Documents • 0.43 MB
FEEFORMAT.xls
Tender Documents • 0.03 MB
BOQ_2124836.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].