| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC Lowest and reasonable bidder | |
| 2 | L2₹15.7 L+₹4.8 L (44.1%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹17.7 L+₹6.7 L (61.8%)Rejected-Finance BEHIND POWER HOUSE WARD NO 6 UDASAR BIKANER RAJASTHAN 334022 | BIKANER | RAJASTHAN | 334022 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹17.9 L+₹7.0 L (63.7%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
9 Mar 2020, 6:00 pmClosed
GE (AF) Nal, Bikaner
GE (AF) Nal, AF Stn Nal Bikaner (Raj)-334001
As described in Bill of quantities
2020_MES_315165_2
GE (AF) NAL/T-45/2019-20
Open Tender
Civil Works - Others
Item Rate
730 days
GE (AF) Nal
As per NIT and tender documents
9 documents required · 9 mandatory
₹500
GE (AF) Nal
₹19,400
Yes
5 Jun 2020
15 Feb 2020
11 Mar 2020
15 Feb 2020
9 Mar 2020
19 Feb 2020
Amount
Removal of excavated soil to a distance exc. 500 metre but not exceeding 1000 metre and depositing where directed at a level not exc. 1.50mtr above the starting point complete all as specified and directed.
Uprooting weeds and vegetation by digging the area to a depth of 150mm and removing all weeds and other growth with the roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting the fresh growth after 10 to 15 days of its flooding with water and dressing including disposal of uprooted vegetation with all leads and lifts complete all as directed.
Supplying and stacking at site good quality soil suitable for gardening free from stones, pebbles, vegetation etc. including carriage from outside MoD land complete all as specified and as directed. Note :- (i) Earth shall be measured in stacks and the quantity measured in stacks shall be reduced by 20% for payment purpose. (ii) Unit rate of this item includes the cost of soil and carriage charges with transportation at site of work. (iii) After stack measurement, soil shall be lifted manually and spread at required site. Unit rate of this item shall include the cost of lifting and spreading of soil as directed.
Supply and planting following hedges /shrubs / trees in location as directed including preparing composite pit of required size (0.60m diameter and 0.60m deep) and bottom of pit shall be trenched to a further depth of 30cm in any type of soil and anti termite treatment by providing and spraying Folidon dust/ equivalent @ 100gms/pit over soil and over all the inner exposed surfaces of the pit in addition to Trishul 20% EC (Chloropyriphos) @ 0.50% shall be provided and sprayed over all the inner surfaces of the pit and 05 ltr of this solution is to be sprayed per sqm area, refilling of the pit with well decayed cow dung/farmyard manure in the proportion 3:1 (3 part soil : 1 part vermocompost) to the excavated soil and add 250 gms neem caked and 250 gms straw meal in each pit at the time of filling, breaking clods, ramming and flooding with water filling fine dressing and removal of rubbish, unserviceable material and surplus earth complete all as specified and as directed. Note:- Regular pouring of water to all trees shall be provided by the contractor till completion of Phase-I and rate of this item includes the cost of this element.
Chlorodendrum inerme, Height 1 feet
Golden Duranta, Height 1 feet
Euphorbia, Height 1 feet
Achipha Rosea twisted dwarf, Height 1 feet
Alpinia zerumbet vergated, Height 2 feet
Chlorophytum, Height 6 inch
Adenium, Height 1.5 feet
Supply and planting following trees in location as directed including preparing composite pit of required size (1.20m diameter and 0.90m deep) and bottom of pit shall be trenched to a further depth of 30cm in any type of soil and anti termite treatment by providing and spraying Folidon dust/ equivalent @ 100gms/pit over soil and over all the inner exposed surfaces of the pit in addition to Trishul 20% EC (Chloropyriphos) @ 0.50% shall be provided and sprayed over all the inner surfaces of the pit and 05 ltr of this solution is to be sprayed per sqm area, refilling of the pit with well decayed cow dung / farmyard manure in the proportion 3:1 (3 part soil : 1 part vermocompost) to the excavated soil and add 250 gms neem caked and 250 gms straw meal in each pit at the time of filling, breaking clods, ramming and flooding with water filling fine dressing and removal of rubbish, unserviceable material and surplus earth complete all as specified and as directed. Note:- Regular pouring of water to all trees shall be provided by the contractor till completion of Phase-I and rate of this item includes the cost of this element.
Plumeria Rubra, Height 3 feet
Plumeria Alba, Height 3 feet
Bombaix Ceiba, Height 3 feet
Traveller Palm, Height 3 feet
Fish tail palm, Height 5 feet
Fox tail palm, Height 3 feet
Yucca Palm, Height 3 - 4 feet
Phoenix Dwarf, Height 3 - 4 feet
Royal Palm, Height 3 feet
Raphis Palm, Height 2.5 feet
Washingtonia Palm, Height 3 - 4 feet
Cyacas Revoluta, Height 1.5 - 2.5 feet
Ashoka Tree, Height 3 - 4 feet
M&L PCC 1:4:8 type D-2 using 40 mm graded stone aggregates as filling in foundation of fencing post / mass concrete / filling etc. complete all as specified and directed.
M&L Framed work as in tree guards / grills and similar work conforming to Fe-290 Gde-E-165 including necessary welding and fixing in position complete all as specified and directed.
S & F welded steel wire fabric weight n exc 4 kg per sqm fixed to steel members complete all as specified and directed.
M&L preparation of new steel surfaces of any description not otherwise described over 10 cm width or girth and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed.
Maintenance of complete arboriculture / landscaping works provided against this contract for 1st year (12 months) from completion of Phase-I (Serial Item No. 2 to 6.13) as certified by GE including spreading of cow dung, fertilizer, removal of waste leaves, supplying water and replacement of ungrown / undeveloped trees with fresh ones complete all as specified and directed.
All as per description of item No. 11.00 here-in-before but for 2nd year (12 months) Note for Item No. 11.00 and 12.00 :- Unit rate of these items also include the following:- (i) All T&P and manpower required for maintenance of trees, grass etc (ii) Cow dung, Fertilizer required for grouting the plants / grass as directed by GE / Engineer-in Charge shall be arranged by the contractor at his own (iii) Contractor shall arrange grass cutting machine of required size and capacity. Electric charges for operation of machine shall be recovered from the contractor's dues as per contract provisions. (iv) After completion of maintenance, all trees including grass / park shall be handed over to MES in fully developed condition. After entire satisfaction completion shall be given by GE.
NATIONAL ASSOCIATES
BIDAWAT ENTERPRISES
RAJENDER ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .