Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹9.9 L+₹18,659.50 (1.92%)Accepted-AOC 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | L2 | Accepted-AOC Accepted on 17 Dec 2020 | |
| 2 | L1₹9.7 LRejected-Finance WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L1 | Rejected-Finance Rejected | |
| 3 | L2₹9.9 L+₹18,659.50 (1.92%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 4 | L3₹11.1 L+₹1.4 L (14.3%)Rejected-Finance MCB Z 5 04939 GURU GOBIND NAGAR BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹20,660
Closing Date
26 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Faridkot
Garrison Engineer, Faridkot-151203 Punjab 01639-264982
Manning and Operation of other E/M installation and allied installation services at Faridkot Mil Stn
2020_MES_378922_3
GE FRD-57/2020-21
Open Tender
Miscellaneous Works
Item Rate
335 days
Faridkot Mil Stn
Class E Category d v
9 documents required · 9 mandatory
₹500
Yes
GE Faridkot
₹20,660
Yes
3 Feb 2021
9 Nov 2020
28 Nov 2020
9 Nov 2020
26 Nov 2020
14 Nov 2020
60 days
Amount
Outsourcing of attending day to day complaints for internal electric supply checking and locating faults/power circuits and defective electrical light/fan/bell/socket out in internal electrical supply in Md , OTM accn and E/M inatallation in the premises of cantonment and out side station ie Raw Water, ASCON Node Nathewala & Muktsar for duration as mentioned here-in-after. Note for Item No 1:- The Electrician and Mate Electricians shall report in Internal Electrical I/C at MT Yard at 0900 hrs. (i) Repair/ Replacement of Tube light 36/20/18 Watt LED tube lights. (ii) Repair/ Replacement of switch socket combination 5 and 15 Amps. (iii) Repair/ Replacement of switch 5A, Fan regulators, ceiling rose, call bell, Angle holders etc. (iv) Repair/ Replacement of MCB SP, DP, TPN of any capacity. (v) Rectifing/Repairing of current leakage, short circuit, earth fault complaints etc. (vi) Re- fixing of ceiling/exhaust fan/wall fan etc at there position. (vii) Repair/ Replacement of Tube light 36/20/18 Watt LED tube lights.
Rate required to be quoted for executing the work as described in Srl No. 1 here-in-before, 02 Numbers Electrician (Skilled) in 1 shifts (08 Hrs each shift) i.e. from 0900 hrs to 1700 hrs including sundays & holidays.
Worker's wages (Basic) Rate Each person as per latest Ministry of Labour & Employment notification prevailing as on bid submission end date
Employee State Insurance as per existing rules @ 3.25% on Basic rate quoted in Srl No. 1.2 above Note : The actual amount paid by the contractor against ESIC or quoted amount which ever is less shall only paid on submission of paid receipt.
Contribution of Bonus @ 8.33% on minimum wages subject to maximum ceiling of Rs. 7000/- per year i.e. Rs. 19.18/day Note : The actual amount paid by the contractor against Bonus or quoted amount which ever is less shall only paid on submission of paid receipt.
Overhead & Profit on Srl 1.2, 1.3 & 1.4 above
LWC as per existing rules @ 1% on Srl No. 1.2, 1.3, 1.4 & 1.5 above
GST as per existing rules @ 18% on Srl No. 1.2, 1.3, 1.4, 1.5 & 1.6 above
Rate required to be quoted for executing the work as described in Srl No. 1 here-in-before, 02 number Mate Electrician (Semi-Skilled) in 1 shifts (08 Hrs each shift) i.e. from 0900 hrs to 1700 hrs including sundays & holidays.
Worker's wages (Basic) Rate Each person as per latest Ministry of Labour & Employment notification prevailing as on bid submission end date
Employee Provident Fund & EDLIS as per existing rules @ 12.50% (EPF 12% & EDLIS 0.5%) on Basic rate quoted in Srl No. 2.1 above Note : The actual amount paid by the contractor against EPF & EDLIS or quoted amount which ever is less shall only paid on submission of paid receipt.
Employee State Insurance as per existing rules @ 3.25% on Basic rate quoted in Srl No. 2.1 above Note : The actual amount paid by the contractor against ESIC or quoted amount which ever is less shall only paid on submission of paid receipt.
Contribution of Bonus @ 8.33% on minimum wages subject to maximum ceiling of Rs. 7000/- per year i.e. Rs. 19.18/day Note : The actual amount paid by the contractor against Bonus or quoted amount which ever is less shall only paid on submission of paid receipt.
Overhead & Profit on Srl 2.1, 2.2, 2.3 & 2.4 above
LWC as per existing rules @ 1% on Srl No. 2.1, 2.2, 2.3, 2.4 & 2.5 above
GST as per existing rules @ 18% on Srl No. 2.1, 2.2, 2.3, 2.4, 2.5 & 2.6 above
Notes for Srl item No. 1 & 2 (Quoted rates are deemed to be included of following: - (i) Any complaint not complete by any reason the same will be inform to I/C of External Electrification. (ii) Repair and maint of burnt MCCB/MCB/TPN of LT Panel, TPN DB, Junction Box etc. (iii) Fixing and realignment of seperator for aluminium conductor of LT OH Line. (iv) Trimming of tree branches touching to LT/HT overhead lines. (v) Find out in Brigades, Unit area & F/Qtrs loose connection of wire, LT cable, temporary connection of cable etc make proper insulating and hanging complete the work. (vi) Disconnecting the existing cable from panel/pole, preparing the end for jointing including all earth work, fixing end terminal joints as per directed. (vii) Cleaning of all E & M installation premises, uprooting of tiny trees, tree cutting, cleaning, levelling, spreading bushes, beeds, grass and removing poly bags, brick bats, stone pedels debris, cleaning of sub station bldg, two pole / four pole structure area, HT line etc complete as directed. (viii) Cutting LT Cable armoured ends , burn out old lugs any size and preparing ends for connecting cable end aluminium tube terminals/lugs & drassing, crimping of given below size with MS nut bolts and washers etc (ix) Applying petroleum jelly on GRID isolators and all GODs of station after removing carbon, dust, etc (x) All LT Panels, TPN DBs, Meter boxes, Substation gates etc. are properly close after the complete work of repair / maint. (xi) In case of any major fault i.e. storm, heavy rain fall, falling of trees on HT & LT Overhead line, broken LT/LT poles, feeder not stand due to any reason etc, in this situation all Tradesmen person will immediately report to AGE E/M / JE E/M and attend the comaplints / situation at the earliest.
Important Notes : - (i) As this item pertain to only wages of labourers based on the prevailing minimum labour wages. (ii) Contractor is required to quote upto two digits after decimal place or otherwise it will be considered by rounding off to two digits after decimal place. (iii) 'Nil' or 'Zero' quoting against OH & Profit will be treated as 'Non-bonafide'. (iv) In case two or more firms quote the same rates, the preference will be given to the firm based on the past records and factors like Class of Contractor, Financial Soundness, work experience for last two years etc and decided based on formula given on Sch 'A' Notes. (v) The rate quoted for items of outsourcing shall not be less than minimum wages as notified by Government of India / concerned State Government / Local Body, whichever is higher and also not less than applicable rates for contribution of employer towards EPF, EDLIS, contribution to ESIC, contribution of Bonus and LWC under respective heading/ sub-items. In case the rates quoted are less than the prevailing rates/ instructions under any heading (s), the bid will be treated as non-bonafide / invalid, shall be disqualified and such bids will not be considered for acceptance. In such case, the lowest bidder shall be determined from amongest the valid/bonafide bids only. (vi) Contribution towards Bonus shall be calculated @ 8.33% on minimum wages subject to maximum ceiling of Rs. 7000/- per year i.e. Rs. 19.18/day. (vii) EPF & EDLIS shall not be calculated on wages exceeds Rs. 15000/- per month.
Important Notes Contd: - (viii) Any increase in minimum wages of labour as fixed by the Govt of India/ State Gove/Union Territory, whichever is higher shall be paid to the contractor as difference between the wages as on last date of bid submission and the increased minimum wages as mentioned here-in-before. Increased wages including all other benefits in compliance of statutory provisions shall be paid to the workers by the contractor. No other claim whatsoever shall be admissible on this account and the bidders shall note this aspect and quote their rates accordingly. It must be noted that in compliance of the statutory provisions, the increase will be passed over to the workers. (ix) The Firm's claims in bills regarding ESI, EPF, EDLIS, GST should be accompanied by documentary proof pertaining to the previous month's bill. A requisite portion of the bill i.e RAR / final bill amount shall be held up till such proof is furnished, at the discretion of the Accepting Officer. (x) The firm shall submit proof of payment given to workers and endorse a copy to Engineer-in-charge, showing the details of payments, deductions (including all statutory deductions) & net amount with requisite challans in each case/person indicating PF number, ESI card detail etc. (xi) Engineer-in-Charge will maintain the record of attendence in respect of the persons deployed by the Firm on the basis of which wages/ remuneration will be decided in respect of the person at the approved and agreed rates. The firm shall be responsible to keep all records of payment, attendence, leaves etc. duly signed by the Engr- in- Charge and endorse a copy of all the documents with RAR/ Final Bill as applicable. (xii) The bidders are requested to refer the E-IN-C's Policy No 66546/Manual/M&O Tender/64/E8 Dated 20 Aug 2020. Contractor has to submit the valid Labour Licence from Labour Comissioner within 15 days of commencement of work. If the contractor fails to submit the same within the stipulated period, the contract shall be liable to be cancelled and the Performance Security of the firm shall be forfeited accordingly.
General Notes for Contractor: (a) Contractor will arrange biometric attendance machine by its own expenses at installation and payment will only be made on the basis of biometric attendance. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) Electrician hand tools, tester, Meggar, test lamp, safety shoes , Helmet and hand gloves, instulation Tape,Cotton waste and all tools DO rod, spanner set, tool kit, tool bag etc. Hand gloves suitable for working pressure 11000 Volts and tested up to 22000 Volts and pressure guage clamp meter will be provided by the contractor without any extra cost. (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flushing tanks shall be maintained. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling of Govt property, contractor will be held responsible for the same (k) All safety eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor
(l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assets shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contractor (r) Minimum I.T.I or any other Higher Qualification and 05 years Experience certificate for Skilled staff and Minimum 10th and 04 years experience certificate for Semi Skilled staff employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) In case of absence operator, double the rate quoted to be recovered. (v) Contractor has to produce Photo ID of the staff employed. (w) Staff employed will be given 2 sets of uniform by the contractor. (x) It should be ensured by contractor that minimum labour charges are paid as per the minimum fare wages act and wages register duly signed by concerned labour will be produced alongwith RAR by the contractor. (y) The payment to every staff employed on work shall be made in the Aadhaar linked bank account through NEFT/RTGS/account payee cheque only.
V R TRADERS
Skyline Encon
M/s GURFATEH BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .