| 1 | L1₹22.7 LAccepted-AOC VIII NALHATI MISSION PARA WARD 07 P O P S NALHATI DIST BIRBHUM PIN 732143 | 732143 | ₹22.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹22.7 LRejected-Finance NALHATI BIRBHUM | NALHATI | BIRBHUM | WEST BENGAL | ₹22.7 L | L2 | Rejected-Finance Highest quoted rate |
| 3 | L3₹22.7 LRejected-Finance BAZARPARA P O RAMPURHAT DIST BIRBHUM PIN 731224 | RAMPURHAT | BIRBHUM | WEST BENGAL | 731224 | ₹22.7 L | L3 | Rejected-Finance Highest quoted rate |
| 4 | Rejected-Technical SUNDAR PRADHAN | - | - | Rejected-Technical Machineries Invoices as specified not provided. |
Tender Value
₹22.7 L
EMD Value
₹45,420
Closing Date
9 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER-II BIRBHUM DIVISION PWD
SURI
As Per NieT
2026_WBPWD_991038_1
WBPWD/EE/BIR/NIeT-40/2025-26
Open Tender
CIVIL WORKS
90 days
RAMPURHAT
Please refer Tender documents.
4 documents required · 4 mandatory
₹45,420
Yes
30 Mar 2026
19 Jan 2026
11 Feb 2026
19 Jan 2026
9 Feb 2026
19 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick
Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed
Cutting chase upto 125 x 150 mm. and subsequent mending of damages. (a) in brick wall [Cement-3.6 Kg/Mtr]
Cutting holes and subsequent mending good damages. (a) Diameter upto 150 mm. (i) In brick work [Cement-4.0 Kg/Mtr]
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. (f) 25 mm to 30 mm shuttering without staging in foundation
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (B) 20 mm thick plaster
(i) With 1:6 cement mortar (C) 15 mm thick plaster
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)
Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) (A) 300 mm lapping each way (a) With 0.60 mm sheet
Galvanised iron sheets valley gutter with perimeter not less than 750 mm with 225 mm lap each way fitted and fixed with necessary bolts, nuts, screws, etc.complete. Valley gutter made of 0.63 mm. thick sheets. (300mm End lapping)
Galvanised or painted wind-tie made of M.S. flats, fitted and fixed complete including cost of necessary fittings. (a)Made with 40 mm. X 6 mm. flats
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)
Add GST 18% over the Sub-Total upto item No. 21
Labour Welfare CESS 1% over the Sub-Total upto item No. 22
Please Enable Macros to View BoQ information
Compatibility Report for V3_BOQ_Percentage_Template.xls
Run on 5/11/2015 12:49
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II34
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.14 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2422900.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid