Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.0 LAdmitted-Finance 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | L1 | Admitted-Finance | |
| 2 | L2₹75.3 L+₹1.3 L (1.69%)Admitted-Finance 105 PALIWAL COMPOUND CHAWANI CHAURAHA KOTA RAJ | KOTA | RAJASTHAN | 324001 | L2 | Admitted-Finance | |
| 3 | L3₹76.8 L+₹2.8 L (3.81%)Admitted-Finance PANCHWATI NAGAR KUNHARI KOTA RAJ | KOTA | KOTA | RAJASTHAN | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NEW INDIA ELECTRIC WORKS L2 | UNIVERSAL ENGINEERS L1 | M/s. RISHAB ENGINEERING WORKS, KOTA L3 |
|---|---|---|---|---|---|---|
| 1.00Oeration and Up-keeping of AC system and passenger elevator | ||||||
| 1.01 | Round the clock operation & Up-keeping of Central Air Conditioning plant,Package AC system,service building passenger elevators (lifts), Boiler#I Elevator (lifts), Boiler#II Elevator (lifts) (Three Shift- 7 Semi-skilled in Each Shift) | 1 | per day | 5,544 ₹28,98,749.7 | 5,544 ₹28,58,278.5 Lowest | 5,544 ₹29,59,456.5 |
| 1.02 | Round the clock operation of Evaporative cooling plant (Three Shift- 01 Semi-skilled in Each Shift) | 1 | per day | 792 ₹3,06,325.8 | 792 ₹3,02,049 Lowest | 792 ₹3,12,741 |
| 1.03 | Operation of Chiller system Admin Building (Two Shift- 01 Semi-skilled in Each Shift) | 1 | per day | 528 ₹2,04,217.2 | 528 ₹2,01,366 Lowest | 528 ₹2,08,494 |
| 1.04 | Operation & Up-keeping of Chimney Elevator(Lift) in general shift (One Semi-skilled) | 1 | per day | 264 ₹1,17,992.16 | 264 ₹1,16,344.8 Lowest | 264 ₹1,20,463.2 |
| 2.00Assistant in Cleaning and Routine maintenance of AC system and passenger Elevatotor | ||||||
| 2.01 | Providing assistance through Highly Skilled workman for routine maintenance work & attending complaints. | 1 | per day | 326 ₹1,47,105 | 326 ₹1,45,051.2 Lowest | 326 ₹1,50,185.7 |
| 2.02 | Supervision & routine maintenance of all the passenger elevators (lifts) ingeneral shift (one skilled) | 1 | per day | 276 ₹1,44,310.05 | 276 ₹1,42,295.25 Lowest | 276 ₹1,47,332.25 |
| 2.03 | Providing assistance through skilled /Un-Skilled workmen for Cleaning and routine maintenance of Central Air Conditioning plant, Evaporative cooling plant,Package Air conditioners,window/ Split Air conditioners, water coolers colony & plant in general Shift (Two Skilled and Two Un-skilled) | 1 | per day | 1,056 ₹4,76,506.8 | 1,056 ₹4,69,854 Lowest | 1,056 ₹4,86,486 |
| 2.04 | Cleaning of Central Air Conditioning AHU rooms,Air washer rooms,Air washer fins,Chiller Rooms,cooling Towers and Package Air conditioning Rooms(Two Un-Skilled) | 1 | per day | 504 ₹2,27,423.7 | 504 ₹2,24,248.5 Lowest | 504 ₹2,32,186.5 |
Tender Value
₹57.1 Cr
EMD Value
₹1.1 L
Closing Date
3 Aug 2022, 11:00 amClosed
Dy. CE(Elect.),KaTPP Jhlawar
Deputy Chief Engineer(Elect.),KaTPP Jhalawar
One year contract for R/B/C Mtc as well as operation of central AC plant, passenger Elevators (lifts), package / chiller units, Evaporative cooling plant, window/split air conditioners water coolers, an refrigerators etc. of 2 600 mw, KaTPP, Jhalawa
2022_RRVUN_288374_1
TN/Elect/486/2022-23
Open Tender
Electrical Works
Item Wise
365 days
KaTPP
As per Section G of Tender Documents
3 documents required · 3 mandatory
₹1,180
Assistant Acount Officer,KaTPP Jhalawar
₹1.1 L
1 Oct 2022
25 Jul 2022
4 Aug 2022
25 Jul 2022
3 Aug 2022
25 Jul 2022
Oeration and Up-keeping of AC system and passenger elevator
Round the clock operation & Up-keeping of Central Air Conditioning plant,Package AC system,service building passenger elevators (lifts), Boiler#I Elevator (lifts), Boiler#II Elevator (lifts) (Three Shift- 7 Semi-skilled in Each Shift)
Round the clock operation of Evaporative cooling plant (Three Shift- 01 Semi-skilled in Each Shift)
Operation of Chiller system Admin Building (Two Shift- 01 Semi-skilled in Each Shift)
Operation & Up-keeping of Chimney Elevator(Lift) in general shift (One Semi-skilled)
Assistant in Cleaning and Routine maintenance of AC system and passenger Elevatotor
Providing assistance through Highly Skilled workman for routine maintenance work & attending complaints.
Supervision & routine maintenance of all the passenger elevators (lifts) ingeneral shift (one skilled)
Providing assistance through skilled /Un-Skilled workmen for Cleaning and routine maintenance of Central Air Conditioning plant, Evaporative cooling plant,Package Air conditioners,window/ Split Air conditioners, water coolers colony & plant in general Shift (Two Skilled and Two Un-skilled)
Cleaning of Central Air Conditioning AHU rooms,Air washer rooms,Air washer fins,Chiller Rooms,cooling Towers and Package Air conditioning Rooms(Two Un-Skilled)
Bidder Name
Amount
NEW INDIA ELECTRIC WORKS(GSTN-08AADFN5985C1Z4)
UNIVERSAL ENGINEERS(GSTN-08AGYPG1844L1ZS)
M/s. RISHAB ENGINEERING WORKS, KOTA(GSTN-NA)
NEW INDIA ELECTRIC WORKS
M/s. RISHAB ENGINEERING WORKS, KOTA
NEW INDIA ELECTRIC WORKS
M/s. RISHAB ENGINEERING WORKS, KOTA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BIDDOC486.pdf
Tender Documents • 5.69 MB
BOQ_512053.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .