| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAdmitted-Finance | ₹26.9 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| Sl No | Description | Qty | Unit | JOGENDRA CHODHARY L1 |
|---|---|---|---|---|
| 1.00Cleaning & upkeepment of RoW including jungle clearance & dressing of roadsides at various Industrial Areas | ||||
| 1.01 | Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance &dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include :a) Cleaning/sweeping of road carriageway by mechanical/manual meansb) Clearing of jungle/vegetation from roadsides & lifting, removal and disposal of waste/dust/earth collected bycleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site.c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuringthat proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there isno accumulation of water in RoW.d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in allrespect as per the scope of work mentioned in Annexure-1 of RFP document and directions of EIC.Note: RoW to be cleaned on weekly basis. | 960 | Per km Per Month | 2,800 ₹26,88,000 Lowest |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
19 Aug 2025, 5:00 pmClosed
Senior Regional Manager
RIICO OFFICE ABU ROAD
Regular Upkeepment and Operation and Maintenance of Industrial Area and Housing Colony of Ambaji, Arbuda, Growth Centre Phase-I and Phase-II, Abu Road
2025_RIICO_488807_1
2025-26/Abu Road/08
Open Tender
Civil Works
Item Rate
730 days
RIICO Abu Road
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RIICO
₹8.5 L
Yes
RIICO OFFICE ABU ROAD
1 Sept 2025
21 Jul 2025
20 Aug 2025
21 Jul 2025
19 Aug 2025
25 Jul 2025
24 Jul 2025
Amount
Cleaning & upkeepment of RoW including jungle clearance & dressing of roadsides at various Industrial Areas
Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance &dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include :a) Cleaning/sweeping of road carriageway by mechanical/manual meansb) Clearing of jungle/vegetation from roadsides & lifting, removal and disposal of waste/dust/earth collected bycleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site.c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuringthat proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there isno accumulation of water in RoW.d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in allrespect as per the scope of work mentioned in Annexure-1 of RFP document and directions of EIC.Note: RoW to be cleaned on weekly basis.
Description of Work / Item(s)
Amount
Cleaning of the storm water drains at Various Industrial areas of Unit Abu Road
Regular desilting cleaning of existing effluent storm water carrying drainage system all types of section of small(open/covered/box type) drains of Industrial areas The scope of work includes regular cleaning of drains, approachesand cross drainage works (slab/box/hume pipe) upto bed level of the drain, culvert, CD work complete in all respect toensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includesproper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimatedisposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoiningsides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scopeof work mentioned in Annexure-1 of RFP document and directions of EIC.Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 monthsfrom the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow indrains shall be maintained throughout the year.
Description of Work / Item(s)
Amount
Door to door Collection and Disposal of solid waste at various Industrial Areas of Unit Abu Road
Collection of domestic waste garbage and non-industrial solid waste generated from all allottees of entire industrialarea on daily basis from door to door of allottees by suitable commercial vehicle with hopper arrangement. The real timemonitoring shall be done through using Geo-Fencing & RFID Based Monitoring System. Installation cost of RFID Cardshall be borne by the Firm. Firm shall install different colored RFID Card for Residential, Commercial and Industrialestablishments. The waste collected will be transported and disposed of in proper manner by the agency at its own leveland cost, to the designated place of local bodies or as per directions of engineer in-charge Terms and conditionsenclosed. as per the scope of work mentioned in Annexure-1 to RFP document and directions of EIC.
Description of Work / Item(s)
Amount
Operation & Maintenance work of Street lights and High Mast lights at various Industrial areas of Unit Abu Road
Regular Operation & Maintenance including watch & ward of IP-65/66 protected 40 - 70 watt LED streetlights luminaireand fixtures on existing tubular/PCC poles with bracket including all required material, wiring, underground cables andpanels etc. complete in all respect at Industrial Area as per enclosed terms & conditions and direction of Engineer-In-Charge. as per the scope of work mentioned in Annexure-1 to RFP document and directions of EIC.
Regular Operation & Maintenance of following street lights luminaire on existing high masts poles with bracket includingall required material, wiring, underground cables, panels, watch & ward etc. complete in all respect at all Industrial Areaunder Unit office Abu Road as per directions of Engineer-In-Charge and enclosed terms & conditions: High MastLights 50-120 watt x 12-24 Lights on each Pole as per the scope of work mentioned in Annexure-1 to RFP document anddirections of EIC.
Erection of octagonal poles re construction of concrete pedestal in Cement Concrete (1:1.5:3) 1 Cement 1.5 Sand 3Aggregate including earth work fixing of anchor bolts 16 mm dia and 750 mm length as per design erection of poles andfixing of light fixtures and connections etc complete in all respect as per directions of Engineer In Charge as per thescope of work mentioned in Annexure-1 to RFP document and directions of EIC.
Description of Work / Item(s)
Amount
Maintenance of road side plantation work at various industrial Areas
Maintenance of plantation in roadsides/medians/existing parks/ open area including replacement of damaged plant,maintenance of parks, with watering as per desired frequency (including cost of water), giving required dose ofpesticides/fertilizer/manure/anti termite treatment as per requirement, removal of dead leaves, pruning, trimming, etc.with all labour, brooms, tools, etc. including lifting, removal and disposal of waste/dust/earth collected by sweepingfrom parks by engaging wheel barrow / trolly as per requirement of site and as direct by engineer-in-charge complete inall respect. As per the scope of work mentioned in Annexure-1 to RFP document and directions of EIC.
Description of Work / Item(s)
Amount
Operation & Maintenance work of water supply scheme of various Industrial areas Abu Road.
Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including completerepair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and unloweringetc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electricconnections service cable and submersible cables inclusive of cost of material and labour required for uninterruptedfunctioning of tube well slt is also inclusive of complete repair and maintenance of pipes connected with pump andmotor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender documentscope of work complete in all respect and as directed by engineer in charge
Regular operation and maintenance of pump houses located at WSS Complex The work includes operation ofdistribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporationRegular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clockmonitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing materialpanel main switches kit Kates Electric connections service cable including cost of material and labour required forrepairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets withregular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campuscomplete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus completein all respect as directed by Engineer in charge
Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVCUPVC HDPE CI DJ Lines for maintaining smooth water supply in area covered under the scope of work The scope of workincludes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable sizeof pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site ofwork at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repairleak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractorwill do dewatering at his own level by making necessary arrangements if required Contractor will use their own T and Phowever the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractorshall have to deposit the damaged material in RIICO store But no additional payment shall be made on account oftransportation
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 3.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .