Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
20 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE 864 EWS
GE 864 EWS C/O 56 APO
REPAIR/MAINTENANCE OF SECURITY LIGHTS, HIGH MAST LIGHT AND PERIMETER LIGHT WITH CONNECTED WORK AT BB CANTT, SRINAGAR.
2026_MES_791705_1
864/WS-90(T)/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE 864 EWS
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE 864 EWS
₹84,000
Yes
29 Sept 2026
29 Sept 2026
27 Oct 2026
29 Sept 2026
20 Oct 2026
13 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for painting of security light steel tubular pole upto 09 mtrs length including clamp, bracket and junction box with two coats of aluminium paint after preparation of old painted surface and providing 03 no. alternate strip of 30 cm wide with black and Yellow super quality enamel paint above embeded level and writing pole no. with 02 inch wide letter, complete all as specified and directed. | 250 | EACH | - | - |
| 2 | Supply, Installation, Testing ,Commissioning and replacment LED Street light Fitting with a nominal system 5300 lumen output of lumens, minimum system efficacy of 115 lm/W and total power consumption not exceeding 45 W (including driver). The luminaire shall have a rated system lifetime of 50,000 burning hours at L70B50. The luminaire should have a color temperature of 5700 - 6500K and CRI>80. The luminaire shall meet IP66/IK07 or IK08 rating with THD<10% and PF > 0.95. The luminaire housing should made of pressure die cast aluminium and the integrated luminaire optics shall have a high efficiency diffuser with more than 85% transmittance. The fitting should have an internal SPD of minimum 4 kV. The driver should have phase to phase protection for 8 hours. The luminaire should have a NABL approved LM79 report. LM80 report from the LED manufacture is a must along with photo biological report. Luminaire and the driver shall be BIS certified separately .Fitting should include nut bolt and SS screws for suitably fixing on the exiting steel tubular pole, complete all as specified and directed. | 335 | EACH | - | - |
| 3 | Description all as per serial item no. 2 here-in-before, but with nominal system output of 8400 lumens, minimum system efficacy of 110 lm/W and total power consumption not exceeding 70 W (including driver), complete all as specified and directed. | 110 | EACH | - | - |
| 4 | Description all as per serial item no. 2 here-in-before, but with nominal system output of 11000 lumens, minimum system efficacy of 120 lm/W and total power consumption not exceeding 90 W (including driver), complete all as specified and directed. | 100 | EACH | - | - |
| 5 | Description all as per serial item no. 2 here-in-before, but with nominal system output of 15000 lumens, minimum system efficacy of 120 lm/W and total power consumption not exceeding 120 W (including driver), complete all as specified and directed. | 90 | EACH | - | - |
| 6 | Supply, Installation, Testing, Commissioning and freplacment LED flood light Fitting with a nominal system 16200 lumen output of lumens, minimum system efficacy of 110 lm/W and the total power consumption should not exceed 120 W (including driver). The luminaire shall have a rated system lifetime of 25,000 burning hours at L70B50. The luminaire should have a color temperature of 5700 - 6500K and CRI>80. The luminaire shall meet IP65/IK07 rating with THD<10% and PF > 0.95. The luminaire housing should made of pressure die cast aluminium and the integrated luminaire optics shall have a high efficiency diffuser with more than 85% transmittance. The fitting should have an internal SPD of minimum 4 kV. The luminaire should have a NABL approved LM79 report. LM80 report from the LED manufacture is a must along with photo biological report. Luminaire and the driver shall be BIS certified separately . Fitting should include nut bolt and SS screws for suitably fixing on the exiting steel tubular pole, complete all as specified and directed. | 65 | EACH | - | - |
| 7 | Description all as per serial item no. 6 here-in-before, but with nominal system output of 21600 lumens, minimum system efficacy of 110 lm/W and total power consumption not exceeding 180 W (including driver), complete all as specified and directed. | 60 | EACH | - | - |
| 8 | Description all as per serial item no. 6 here-in-before, but warm with nominal system output of 16200 lumens, minimum system efficacy of 110 lm/W and total power consumption not exceeding 50 W (including driver), complete all as specified and directed. | 80 | EACH | - | - |
| 9 | Disconnecting and lowering carefully light fittings from high mast, 12-20 mtr high for maintenace / repairs of light fittings and refixing the light fittings after repairs, complete all as specified and directed.
Note:- Spare parts shall be measured and paid separately. | 15 | EACH JOB | - | - |
| 10 | Disconnecting and taking down street / security light fitting of any size / capacity / make from the pole / bldg for repair / replacement of unservisable spare parts etc., testing, cleaning the fitting internally and externally and replacement of unserviceable wiring not more than 0.3 Mtrs with 1.5 sqmm PVC insulate copper wire, checking and repairing of loose connections, replacement of wire connectors, nuts, bolts, screws and fixing the light fitting in original position on wall / pole / santry post / top of building including necessary electrical connection, complete all as specified and directed.
Note:- Driver and SPD shall be measured and paid separately. | 245 | EACH JOB | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_887626.xls
BOQ • 1.35 MB
Tender90_merged.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .