Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹73.9 L
EMD Value
₹1.5 L
Closing Date
10 Jul 2024, 10:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
Ravikiran
Proposed Construction of Compound wall to SWM Site at TP Chadchan
DMA/2024-25/OW/WORK_INDENT19379
DMA/2024-25/OW/WORK_INDENT19379
Open
Other Works
Two Tender Document System(Two Cover)
DMA Town Panchayat Chadchan
6 documents required · 6 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
List of Financial Resources with Certificates
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. 59.10Lakhs (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - 64.0cum, Earthwork - 344 cum,BBM-172cum SSM/UCR-330.0cum Plastering-2201.6Sqm (80% of peak rate of construction)
Valid KPWD Registration certificate.
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. 147.76 Lakhs)
Liquid assets and /or availability of credit facilities of no less than Rs. 22.16 Lakhs (estimated cash flow for 3 months of peak construction period)
₹1,850
₹1.5 L
25 Jun 2024
25 Jun 2024
11 Jul 2024
9 Jul 2024
Proposed Construction of Compound wall to SWM Site at TP Chadchan
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing Random rubble masonry with hard stone in foundation and
plinth including levelling up with cement concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing Brick work with common burnt clay modular bricks of class
designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement
: 6 coarse sand) including cost of all materials, labour, sc...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to
brick/stone masonry including rounding off corners wherever required
smooth rendering, providing and removing scaffolding, includi...
Finishing walls with water proofing cement paint of required shade :New
work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after
thoroughly brooming the surface to remove all dirt, dust, ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Foundation form works consider 5%
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For RCC Columns form works consider 70%
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For RCC Beams form works consider 70%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning,traightening,
cutting, bending, hooking, laping/welding joints, tying ...
Providing and fixing Structural Steel work in single section, fixed
with or without connecting plate, including cutting, hoisting, fixing in
position and applying a priming coat of approved steel prim...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw3-19379.docx
Tender Document • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .