Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance 169 PERAMIUM KOLATHUPALAYAM VIA DHARAPURAM 638 656 | TIRUPPUR | TAMIL NADU | 638656 | L1 | Accepted-Finance BELOW THE ESTTMATE | |
| 2 | L2₹4.8 L+₹885 (0.18%)Accepted-Finance | L2 | Accepted-Finance ABOVE THE ESTIMATE |
| Sl No | Description | Qty | Unit | Kanganam Construction H2 | SUNMATHI CONSTRUCTIONS H1 |
|---|---|---|---|---|---|
| 1.00Air Compressor Motor | |||||
| 2.00 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | 1 No (Each) | 8,474 ₹8,474 Lowest | 8,474 ₹8,474 Lowest |
| 3.00 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | 1 No (Each) | 9,491 ₹9,491 Lowest | 9,491 ₹9,491 Lowest |
| 4.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | 1 No (Each) | 2,245 ₹2,245 Lowest | 2,245 ₹2,245 Lowest |
| 5.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | 1 No (Each) | 3,008 ₹3,008 Lowest | 3,008 ₹3,008 Lowest |
| 6.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | 1 No (Each) | 1,483 ₹1,483 Lowest | 1,483 ₹1,483 Lowest |
| 7.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | 1 No (Each) | 1,483 ₹1,483 Lowest | 1,483 ₹1,483 Lowest |
| 8.00 | Labour charges for Cylinder Boring work 5 HP | 1 | 1 No (Each) | 847 ₹847 Lowest | 847 ₹847 Lowest |
| 9.00 | Labour charges for Cylinder Boring work 7.5 HP | 1 | 1 No (Each) | 1,271 ₹1,271 Lowest | 1,271 ₹1,271 Lowest |
| 10.00 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | 1 No (Each) | 1,271 ₹2,542 Lowest | 1,271 ₹2,542 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
7 Sept 2026, 3:00 pmClosed
The Municipal Commissioner
The Municipal Commissioner, Vellakovil Municipality, Uppupalayam Road, Vellakovil.
Motor Maintenance in Vellakovil Municipality
2026_MAWS_696330_1
1640/E1/2026
Open Tender
Civil Works - Water Works
Works
120 days
VELLAKOVIL
Motor Maintenance in Vellakovil Municipality
2 documents required · 2 mandatory
₹0
₹5,000
7 Oct 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
20 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Air Compressor Motor | |||||
| 2 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | 1 No (Each) | - | - |
| 3 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | 1 No (Each) | - | - |
| 4 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | 1 No (Each) | - | - |
| 5 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | 1 No (Each) | - | - |
| 6 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | 1 No (Each) | - | - |
| 7 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | 1 No (Each) | - | - |
| 8 | Labour charges for Cylinder Boring work 5 HP | 1 | 1 No (Each) | - | - |
| 9 | Labour charges for Cylinder Boring work 7.5 HP | 1 | 1 No (Each) | - | - |
| 10 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | 1 No (Each) | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_837133.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_837133.xls
BOQ • 0.44 MB
corrigendum.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .