Loading…
Loading…
Tender Value
₹38.2 L
EMD Value
₹47,800
Closing Date
6 Aug 2026, 11:00 am
AREA ENGINEER ENM Jhanjra Area
Office of the General Manager, Jhanjra area, ECL
Supply, Installation, and Dismantling of Hydraulic Power Pack Brake System for Man Winder Installed at MIC A-Shaft of Jhanjra Project Colliery
2026_ECL_362212_1
ECL/GM/JNR/EnM/A2/26-27/23 dated 17.07.2026
Open Tender
Miscellaneous Works
Item Rate
60 days
JHANJRA
Please refer Tender documents.
4 documents required · 4 mandatory
₹47,800
21 Jul 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
6 Aug 2026
22 Jul 2026
21 Jul 2026 - 29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Design, manufacture, and supply of hydraulic power brake unit for service/main braking of the double drum winder. | - | WORK | 1 | - |
| 1.02 | Dismantling of existing system and erection of new hydraulic brake system with PLC based controls and interface with the existing LT power supply and incorporation of HMI for brake operation and feedback | - | WORK | 1 | - |
| 1.03 | Supply of Spares - Single Axis Controller (Joystick 0-10V) | - | NO | 1 | - |
| 1.04 | Supply of Spares – Proportionate Valve with Aspirator Card | - | NO | 1 | - |
| 1.05 | Packing and Forwarding Charges | - | WORK | 1 | - |
| 2Total impact of GST for the purpose of CTC | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_375109.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].