Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹85,154.90Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹86,557.11+₹1,402.21 (1.65%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹93,694.73+₹8,539.83 (10.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹97,000
EMD Value
₹2,910
Closing Date
14 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTT OF GATE AT GRAVEYARD WARD 01
2026_RDPR_320038_8
NIT NO 90 OF 2026-27 WAVOORA ADF
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹2,910
21 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
8 Aug 2026 - 8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal | 0.6 | Cum | 479.3 | ₹287.58 |
| 2 | Providing/Laying of dry stone soling, tightly hand packed including all carriages | 0.05 | Cum | 1,000 | ₹54 |
| 3 | Centring and shuttring i/c removal of f/work | 10.21 | sqm | 577 | ₹5,888.86 |
| 4 | Providing and Laying of reinforcement cement concrete of specified grade (1:1.5 :3) mix crushed stone agg size 20 mm. Including all carriages /head load complete job | 1.56 | CUM | 9,395.7 | ₹14,612.19 |
| 5 | TOR STEEL REINFORMENT INCULDING BINDING CUTTING COMPLETE JOB | 1.71 | qtl | 11,500 | ₹19,673.28 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel of two or more coats and steel paint primer all complete. | 398.2 | kg | 138.2 | ₹55,031.24 |
| 7 | fine Qty vide , Agg average lead 35 km | 0.7 | cum | 625.59 | ₹437.81 |
| 8 | Course Qty vide , Agg average lead 10 km | 1.4 | Cum | 279.04 | ₹390.57 |
| 9 | Add cost of Photo graphs | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1062206.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .