| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | ₹1.6 Cr | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹1.8 Cr+₹25.5 L (16.2%)Rejected-AOC 1077 SECTOR 16 AND 17 125001 | HISAR | HISAR | HARYANA | 125001 | ₹1.8 Cr+₹25.5 L (16.2%) | 2 | Rejected-AOC Refunded as not lowest |
| 3 | 3₹2.0 Cr+₹39.4 L (25.0%)Rejected-AOC JHAJJAR | ₹2.0 Cr+₹39.4 L (25.0%) | 3 | Rejected-AOC Refunded as not lowest |
| 4 | 4₹2.1 Cr+₹55.0 L (35.0%)Rejected-AOC | ₹2.1 Cr+₹55.0 L (35.0%) | 4 | Rejected-AOC Refunded as not lowest |
| 5 | Rejected-Technical 415E GALI NO 5 EAST BABARPUR SHAHDARA DELHI 110052 | NORTH | DELHI | 110052 | - | - | Rejected-Technical Technically not quarlified |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
23 Dec 2020, 5:00 pmClosed
Executive Engineer
Provincial Division, PWD B and R Charkhi Dadri
Wdg. and Stg. of Jhojju to Berla road km 0 to 12.00 (Road ID 2372) in Provl. Divn. PWD B and R Br., Charkhi Dadri in Charkhi Dadri Distt..
2020_HRY_152419_1
PWD/Dadri/166.95/Jhojju Berla road
Open Tender
Civil Works - Roads
Works
180 days
Charkhi Dadri
Please refer tender documents
3 documents required · 3 mandatory
₹15,000
₹3.3 L
13 Mar 2021
3 Dec 2020
24 Dec 2020
3 Dec 2020
23 Dec 2020
3 Dec 2020
Amount
Milling of distress bituminous layer upto 90 mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No 17
Dismantling of existing CC block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land and laying old CC blocks over 25 mm Yamuna sand including transportation from road side where stack as per technical specification of broken block/ unusable in pavement by dispose beyond PWD land.
Providing and laying 150 mm thick granular sub base consisting of drainage cum filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No. 503. Specification.
Providing and laying 30 mm compacted thickness of Bituminous Concrete (BC) in one layer with 100 - 120 TPH Batch Type Hot Mix Plant with bituminous binder VG-30 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher having sufficient screed width so that the BC in full width of the carriage way is laid in single opration without any longititutinal joint with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.4% as per job mix including waste plastic material no extra payment will be made, Extra bitumen required will be considered as incidental to work. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Relaying old CC blocks over 25 mm thick fine sand including transportation from road side where stacked excluding cost of CC blocks and complete in all respect as per specifications (NS).
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS).
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads .the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved the same from Engineer-In-Charge before use.
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. Size 1200mm x 900mm
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Reinforced cement concrete 1:2:4 5th Kilometer stone of standard design, fixed in position, including finishing but including painting- (HSR 10.129(ii) + 16.75 b(iii)).
Reinforced cement concrete 1:2:4 Kilometer stone of standard design, fixed in position, including finishing but including painting- (HSR 10.129(iii) + 16.75 b(i)). Kilometer stone
Providing and fixing reinforced cement concrete 1:2:4 200 Mtr. stone i/c finishing painting two coats as per PWD specification complete in all respect. (NS).
Providing & fixing road side delineator of height 1200 mm made of M. S. tube size 100 x 80 mm having thickness 1.2mm of height 900 mm and balance 300 mm of M. S. angle 25 x 25 x 3 mm. Having micro prismatic retro-reflective panel conforming to IRC : 67-2012 type 4 HIP and of size 80mm x 150mm on both sides as per clause No. 800 of MORT&H. Complete delineator processed by heat treatment process to makes it resistant to all weather effects fixed in C.C. 1:2:4 block size of 300 x 300 x 450 mm as clause No. 806 of MORT&H specification 5th revision 2013.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M/etc.)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -5. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous mix material @ Rs.1050.00 P.Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
M/s Hisar Construction Company
RSR Construction Company
M/s K.K. Construction Company
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .