Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.9 LAccepted-AOC 422 MAIN BRANCH MASTER TARA SINGH NAGAR JALANDHAR PUNJAB 144001 | JALANDHAR | PUNJAB | 144001 | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹66.6 L+₹3.7 L (5.84%)Rejected-Finance 91 DEFENCE ESTATE PHASE II NEAR AMBEDKAR PARK DEORI ROAD AGRA UP | AGRA | UTTAR PRADESH | 282001 | L2 | Rejected-Finance Being higher bidder |
Tender Value
₹74.6 L
EMD Value
₹1.5 L
Closing Date
10 Aug 2020, 6:00 pmClosed
CWE (AF) Agra
HQ CWE (AF) Agra
Provn Of Parking shed for CFFR Vehicles and certain Misc work At AF Stn Agra
2020_MES_355344_2
80020-08E8
Open Tender
Civil Works
Lump-sum
270 days
GE (AF) Tech Area Agra
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
GE (AF) Tech Area Agra
₹1.5 L
Yes
10 Oct 2020
24 Jun 2020
17 Aug 2020
24 Jun 2020
10 Aug 2020
27 Jul 2020
28 Jun 2020 - 1 Jul 2020
Amount
SCHEDULE A PART I (BUILDING WORKS)
Construction of garage with RCC framed structure using Fly ash brick masonry with ATT, seismic strengtheing and WPT (APP) and PQC Flooring including ramp on both side. Complete all as specified and shown on drawings .
Construction of Rest room with Toilet with RCC framed structure using Fly ash brick masonry with ATT,aluminium window with aluminium guard bars,doors with frames, seismic strengtheing and WPT (APP) including necessary demolition of existing concrete flooring for the affected portion of foundation/plinth beam etc Complete all as specified and shown on drawings .
Construction of Store room with RCC framed structure using Flyash brick masonry with ATT, seismic strengtheing and WPT (APP). Complete all as specified and shown on drawings
SCHEDULE A PART II (INTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for ''INTERNAL WATER SUPPLY'' as listed in Sch 'A' Part -II
SCHEDULE A PART III (INTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for 'INTERNAL ELECTRIFICATION' as listed in Sch 'A' Part -III
SCHEDULE A PART IV (EXTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for '''EXTERNAL WATER SUPPLY'' as listed in Sch 'A' Part -IV
SCHEDULE A PART V (EXTERNAL ELECTRIFICATION).
Lump sum price worked out by the contractor for '''EXTERNAL ELECTRIFICATION'' as listed in Sch 'A' Part -V
SCHEDULE A PART VI 'ROAD / PATH & HARD STANDING.
Lump sum price worked out by the contractor for '''ROAD / PATH & HARD STANDING'' as listed in Sch 'A' Part -VI
SCHEDULE A PART VII (SEWAGE DISPOSAL).
Lump sum price worked out by the contractor for '''SEWAGE DISPOSAL'' as listed in Sch 'A' Part -VII
SCHEDULE A PART VIII (AIR CONDITONING) .
Supply and install hi wall split units indoor/outdoor complete with cordless remote control unit and with in built air ioniser and plasma filter for better indoor air quality with minium 5 star rating and EER 3.2 of capacity 1.5TR complete all as specified and directed. Make- Blue Star/Carrier/
Supply and fix voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stablized at 230 V with accuracy of +- 2.5% complete all as specified and directed.
Gupta Automobiles
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .