| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹10.8 L+₹66,177.73 (6.54%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹12.8 L+₹2.6 L (26.1%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
23 Apr 2021, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
ANNUAL MAINTENANCE OF 132KV TRANSMISSION LINES UNDER ETD, SULTANPUR.
2021_UPTCL_578445_1
T. NO. 149/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
365 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE ETC Sultanpur
₹15,000
28 Apr 2021
31 Mar 2021
24 Apr 2021
31 Mar 2021
23 Apr 2021
31 Mar 2021
31 Mar 2021 - 23 Apr 2021
Amount
Following work are to be Carried out on 132KV Transmission Lines under ETD-Sultanpur with all Cost of Men Misc. Consumable T&P etc. Required for Satisfactory Completion of the work as per Technical Specifications & Direction of the Supervising Engineer.
Quarterly Routine Tower to Tower Patrolling from one end to other end of following Transmission lines and Submission of Patrolling report in Triplicate in Prescribed Proforma Mentioning the Stolen /Missing Tower part & Tower Accossries Tree falling in Range of Line Corridor Damage to Earth Wire Conductor Jumper Insulator & other Line Accessories damage to Foundation ,copping, Chimney ,Earthing etc.The Patrolling shall be done every Quarter with all due Care of Safty & Precautions.
132KV Sultanpur(220kv)- Kadipur 33.31Km on S.C Towers (Line Length 33.31Km , 33.31Km x4 time = 133.24Km)
Lilo of 132Kv Sultanpur to Kadipur @ 132Kv Lambhua D/C Line (Line Length 14.56Km , 14.65Km x4 time = 58.24Km)
132KV Kadipur - Sahganj 37.37Km on S.C Towers (Line Length 37.37Km , 37.37Km x4 time = 149.48Km)
132KV Kadipur - Gosashinghpur 18.74Km S.C on D/C Towers (Line Length 18.74Km , 18.74Km x4 time = 74.96Km)
132KV Gosashinghpur- New Tanda (220kv) 29.95Km S.C on D/C Towers (Line Length 29.99Km , 29.95Km x4 time =19.80 Km)
132KV Sultanpur(220kv)- Jagdishpur 65.205Km on S.C Towers (Line Length Km , 65.205Km x4 time = 260.82Km)
Lilo of 132Kv Sultanpur to Jagdishpur @ 132Kv Musafirkhanan on D/C Towers (Line Length 10.28Km , 10.28Km x4 time = 41.12Km)
132KV Sultanpur(220kv)- Korwa 26.285Km on S.C Towers (Line Length 26.285Km , 26.285Km x4 time = 105.14Km)
132KV Korwa-Gauriganj 10.375Km on S.C Towers (Line Length 10.375Km , 10.375Km x4 time = 41.5Km)
132KV Amethi (220kv)- Gauriganj, 20.57Km D/C Line (Line Length 20.57Km , 20.57Km x4 time = 82.28Km)
132KV Amethi (220kv)- Musafirkhana , 43.47Km D/C Line (Line Length , 43.47Km x4 time = 173.88Km)
132KV Jagdishpur-Amawa 36.63Km on S.C Towers (Line Length 36.63Km x4 time =146.52Km)
Lilo of 132Kv Jagdishpur to Musafirkhana @ 220Kv Amethi D/C Line 45.66 Km (Line Length 45.66Km x4 time = 182.64Km)
132KV Amawa -Gauriganj 46.5Km on S.C Towers (Line Length 46.5Km x4 time = 186Km)
132KV Jagdishpur-Haidergrah 28.20Km on S.C Towers (Line Length 28.20Km x4 time =112.8Km)
132KV Jagdishpur-Indogulf 2.18Km on S.C Towers (Line Length 2.18Km x4 time =8.72Km)
132KV Gauriganj-ACC Tikria 3.2Km on S.C Towers (Line Length 3.2Km x4 time =12.8Km)
Emergency Patrolling of the above Transmission Lines the event of Tripping/Break Down of the Line (to Commence with in 2 hrs of Intimation for the same if Tripping/Breakdown in Day Time and by 07:300 AM if Tripping /Breakdown in Night Hours) as per Instruction of Supervising Engineer as per Details given below
Emergency Patrolling of the above Transmission line up to 20Km Distance ( one job each Emergency Patrolling)
Emergency Patrolling of the above Transmission line 20Km to 50Km Distance ( one job each Emergency Patrolling)
Periodic Cutting of different type of Trees like Mango Sheeshem, Peepal, Semal, Eucalyptus, Popular etc. having Girth 0.5 Meter to 1.0 Meter and falling in the Range of Corridore of above transmission line to provide minimum clerance of about 8 Meter between tree and Conductor on boath side if Tower/Line with all due Care of Safty & Precaution to Avoid any Damage of Building Power & Telephone Line Passing Nearby ,Crops, other Nearby Tree etc.The work Includes Eliminating & Cleaning the Lines Site after Cutting of Tree ( 75No Tree x4 Times in ayear =300 No Trees)
Periodic Lopping/Chopping of diffrent type of trees mango Sheeshem Jakfroot Neem Peepal, Semal, Eucalyptus, Popular etc. having Girth 0.5 Meter to 1.0 Meter and falling in the Range of Corridore of above transmission line to provide minimum clearance of about 8 Meter between tree and Conductor on both side if Tower/Line with all due Care of Safety & Precaution to Avoid any Damage of Building Power & Telephone Line Passing Nearby ,Crops, other Nearby Tree etc.The work Includes Eliminating & Cleaning the Lines Site after Cutting of Tree ( 1050 No Tree x4 Times in a year =4200 No Trees)
Periodic Hot spot Scanning of Section towers mid span joint ,repair sleeves & Jumper of followling transmission lines
132KV Sultanpur(220kv)- Kadipur on S.C Towers
Lilo of 132Kv Sultanpur to Kadipur @ 132Kv Lambhua D/C Line
132KV Kadipur - Sahganj on S.C Towers
132KV Kadipur - Gusashinghpur S.C on D/C Towers
132KV Gusashinghpur- New Tanda (220kv) S.C on D/C Towers
132KV Sultanpur(220kv)- Jagdishpur on S.C Towers
Lilo of 132Kv Sultanpur to Jagdishpur @ 132Kv Musafirkhanan on D/C Towers
132KV Sultanpur(220kv)- Korwa on S.C Towers
132KV Korwa-Gauriganj 10.375Km on S.C Towers
132KV Amethi (220kv)- Gauriganj D/C Line
132KV Amethi (220kv)- Musafirkhana D/C Line
132KV Jagdishpur-Amawa on S.C Towers
Lilo of 132Kv Jagdishpur to Musafirkhana @ 220Kv S/S Amethi
132KV Amawa -Gauriganj on S.C Towers
132KV Jagdishpur-Haidergrah S.C Towers
132KV Jagdishpur-Indogulf on S.C Towers
132KV Gauriganj-ACC Tikria on S.C Towers
Replacement of missing tower part along with fabrication work and fixing after shifting of tower part ,nut & bolts from UPPTCL store to work site of above mention lines
Checking & Tightening of Jumpers of tension towers including replacement of damaged jumpers fasteners if needed and including carriage of material from store to site of work of 132KV Transmission lines under ETD-Sultanpur
Re-Fixing & Tightening of Dislocated /Shifted Conductor Vibration Dampers to its Place Including Replacement of Fasteners,if Required to be Provided br Department as Per Requirment of 132KV Transmission Lines
Attending of breakdown due to failure of disc insulator and replacement of tension & suspension string/polymer along with mobilization of skilled gang including carriage of material from store to site & site to store after completion of work.
Tension string (120KN disc insulator)
Suspension /polymer string (70KN disc insulator/polymer)
Jumper replacement
M/S W.M. ELECTRIC WORKS
NIRBHAY TRADERS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .