| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Finance | ₹14.0 L | L1 | Admitted-Finance |
| 2 | L2₹14.4 LAdmitted-Finance | ₹14.4 L | L2 | Admitted-Finance |
| 3 | L3₹15.5 LAdmitted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | ₹15.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S NEW MAA KALYANI TRADERS L2 | Shukla Enterprises L1 | Katyani Construction Co. L3 |
|---|---|---|---|---|---|---|
| 1.00Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement. | ||||||
| 1.01 | PCC/STP Pole | 200 | Nos | 850 ₹1.7 L | 500 ₹1 L | 699 ₹1.4 L |
| 1.02 | ACSR Weasel Conductor | 13,860 | Mtr | 7 ₹97,020 | 8.9 ₹1.2 L | 3 ₹41,580 |
| 1.03 | Arial bunch Conductor 1X16 / 3X50 / 3X95 sq mm | 4,300 | Mtr | 7 ₹30,100 | 14 ₹60,200 | 6 ₹25,800 |
| 1.04 | Loose line material. | 1 | Job | 10,000 ₹10,000 | 40,000 ₹40,000 | 14,999 ₹14,999 |
| 2.00 | Fixing of Three Phase Distribution Box with clamp, N&B (Only D.B. Box Provided By Department) | 55 | Nos | 800 ₹44,000 | 240 ₹13,200 | 499 ₹27,445 |
| 3.00 | New Bore Type Earthing for Distribution transformers/Control Pannel one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 25x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding. | 9 | Nos | 15,000 ₹1.4 L | 16,500 ₹1.5 L | 21,500 ₹1.9 L |
| 4.00 | Erection of new Single PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings. | 182 | Nos | 1,500 ₹2.7 L | 1,000 ₹1.8 L | 1,400 ₹2.5 L |
| 5.00 | Erection of Double PCC/ST Pole structure including digging of pit and fitting of all accessories complete. | 9 | Nos | 3,500 ₹31,500 | 5,500 ₹49,500 | 5,500 ₹49,500 |
| 6.00 | Making of H.T./L.T. Section points for line tapping, by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories. | 12 | Nos | 3,000 ₹36,000 | 1,350 ₹16,200 | 999 ₹11,988 |
Tender Value
₹17.0 L
EMD Value
₹16,970
Closing Date
3 Dec 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORK SCHEDULE OF SHIFTING OF AJGAIN-MALHIABAD-ITTONJA KE MOHAN TIRAHA TO MATARIYA 11 KV/ LT LINES FOR LINE SHIFTING UNDER FULL DEPOSIT SCHEME IN THE AREA OF SUB DIVISION - HASANGANG UNDER THE EDD-V, HASANGANJ, UNNAO.
2025_MVVNL_1092923_1
112/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹3,540
A/CNo.3355002101008374,IFSCCodePUNB0335500
₹16,970
12 Dec 2025
21 Nov 2025
4 Dec 2025
21 Nov 2025
3 Dec 2025
21 Nov 2025
Amount
Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement.
PCC/STP Pole
ACSR Weasel Conductor
Arial bunch Conductor 1X16 / 3X50 / 3X95 sq mm
Loose line material.
Fixing of Three Phase Distribution Box with clamp, N&B (Only D.B. Box Provided By Department)
New Bore Type Earthing for Distribution transformers/Control Pannel one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 25x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
Erection of new Single PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings.
Erection of Double PCC/ST Pole structure including digging of pit and fitting of all accessories complete.
Making of H.T./L.T. Section points for line tapping, by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories.
Fabrication/Modification of MS items, for making sub station HT/LT line for 25/63/100 kva distribution transformer Nut and bolts as per requirement of site conditions
Dismantiling for line shifting of single pole/double pole, conductor, ab cable per spon and X-arms, brackets, insulators, channels and all hardware fittings
Grouting OF PCC Pole as per RESSPO norms with grouting materials.
Earthing of PCC/ STP Pole as per RESSPO norms.
Digging of pits, fixing, nuzzling and grouting of stay rods as per RESSPO norms with grouting materials.
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 x 1.5 x1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth/side condition.
Providing and Fixing of following materials
Providing and fixing holding clamps for PCC/STP with nuts & Bolts
Providing and fixing LT clamps for PCC/STP with nuts & Bolts
Providing and fixing Stay clamps for PCC/STP with nuts & Bolts
Providing and fixing F clamps for PCC/STP with nuts & Bolts
Providing and fixing Distribution Box clamp with nuts & Bolts
Laying Stringing & sagging of HT line by ACSR Weasel Conductor including all related work as joints /jumpers and binding on Insulators as required.
Laying, stringing Aerial Bunched Cable 1x16 / 3x50/ 3x95 sq mm including all fittings on erected ST Pole/ P.C.C. Pole.
Chopping of tree branches lying in the route of making new 11 KV / LT line.
MS iron scrap
M/S NEW MAA KALYANI TRADERS (BID ID -5717287)
Katyani Construction Co. (BID ID -5717616)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2008151.xls
BOQ • 0.29 MB
doc112.pdf
Tender Documents • 1.39 MB
Download all tender documents and submit your bid