| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.6 Cr+₹72,903.76 (0.45%)Rejected-Finance | ₹1.6 Cr+₹72,903.76 (0.45%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ANBU H1 | Subam Constructions H2 |
|---|---|---|---|---|---|
| 1.00Strengthening of road from Manalurpettai to Vadakkuthangal raod Km 0/0-2/580 in Rishivandhiyam Block of Kallakurichi district. | |||||
| 1.01 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 2,491.75 | Sqm | 6 ₹14,950.5 | 5 ₹12,458.75 Lowest |
| 1.02 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 2,279.52 | Cum | 132 ₹3,00,896.64 | 130 ₹2,96,337.6 Lowest |
| 1.03 | Picking the Exisiting BT Surface including all labour charges for all labour charges etc complete. | 2,399 | Sqm | 25 ₹59,975 | 20 ₹47,980 Lowest |
| 1.04Collection & Supply and Spreading of US gravel including cost & conveyance and labour charges for stacking etc complete. | |||||
| 1.05 | Km 0/0 - 1/00 | 418.78 | Cum | 1,100 ₹4,60,658 | 1,000 ₹4,18,780 Lowest |
| 1.06 | km 1/0-2/0 | 403.83 | Cum | 1,045 ₹4,22,002.35 | 1,042 ₹4,20,790.86 Lowest |
| 1.07 | km 2/0-2/580 | 241.16 | Cum | 1,045 ₹2,52,012.2 | 1,042 ₹2,51,288.72 Lowest |
| 1.08Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.09 | Km 0/0 - 2/580 | 1,191.16 | Cum | 2,257 ₹26,88,448.12 Lowest | 2,257 ₹26,88,448.12 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
20 Jan 2025, 3:00 pmClosed
Project Director
DRDA, Kallakurichi
Strengthening of Road From Manalurpettai to Vadakkuthangal Road in Rishivanthiyam Block
2024_RDTN_515243_1
B3/1255/2024/007
Open Tender
Civil Works - Roads
Item Rate
180 days
Kallakurichi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
DRDA, Kallakurichi
3 Oct 2025
30 Dec 2024
20 Jan 2025
30 Dec 2024
20 Jan 2025
30 Dec 2024
30 Dec 2024 - 31 Dec 2024
3 Jan 2025
Amount
Strengthening of road from Manalurpettai to Vadakkuthangal raod Km 0/0-2/580 in Rishivandhiyam Block of Kallakurichi district.
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking the Exisiting BT Surface including all labour charges for all labour charges etc complete.
Collection & Supply and Spreading of US gravel including cost & conveyance and labour charges for stacking etc complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface (treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the
Supply and Fixing of KM Stones. 1.65 x 0.45 x 0.15 m
Supply and Fixing of HM Stones of size 0.75 x 0.23 x 0.15m
Supply and Fixing of Name Board
Cost For Road Marking
Cost for photograpic documentation and album
Cost for Rumble stripps
Supply and Fixing of 90 cm Triangle board
Supply and Fixing of 60cm circular board
Supply and Fixing of 90 cm Octagon Board
Cost For Reflector
Providing wearing coat to causeway at 1/250
Coat and labour for centering works
PCC 1:2:4 mix (M30) using 20mm metal including all cost and cvonveyance and all labour charges
Routine Maintenance of above road for 5 years
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Subam Constructions (BID ID -1233354)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .