| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 LAdmitted-Finance | ₹3.4 L | L2 | Admitted-Finance |
| 3 | L3₹3.5 LAdmitted-Finance | ₹3.5 L | L3 | Admitted-Finance |
| 4 | L4₹3.6 LAdmitted-Finance | ₹3.6 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CITY WIDE ELECTRICALS AND SUPPLIERS L2 | M/s ZAHID CONTRACTORS L4 | QURESHI & CO L3 | universal electric and suppliers L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 63 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, Al. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | 1,95,000 ₹1.9 L | 1,85,000 ₹1.9 L | 1,82,000 ₹1.8 L | 1,90,000 ₹1.9 L |
| 2.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 2 | No. | 19,000 ₹38,000 | 24,000 ₹48,000 | 23,000 ₹46,000 | 21,000 ₹42,000 |
| 3.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 8 Mtr Long (410-SP-15) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 1 | No. | 17,500 ₹17,500 | 20,000 ₹20,000 | 19,500 ₹19,500 | 19,000 ₹19,000 |
| 4.00 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 0.04 | Km | 36,000 ₹1,440 | 70,000 ₹2,800 | 68,000 ₹2,720 | 30,000 ₹1,200 |
| 5.00 | Supply & fixing of GI nuts and bolts of sizes | 11 | Kgs | 150 ₹1,650 | 300 ₹3,300 | 300 ₹3,300 | 150 ₹1,650 |
| 6.00 | Cement bottoming of S T Ploes 8Mtrs long in 1:2:4 mix , 0.40 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | 2,800 ₹2,800 | 300 ₹300 | 300 ₹300 | 2,000 ₹2,000 |
| 7.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix, 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 2 | No | 3,000 ₹6,000 | 900 ₹1,800 | 900 ₹1,800 | 2,000 ₹4,000 |
| 8.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 3 | No | 1,000 ₹3,000 | 1,000 ₹3,000 | 1,000 ₹3,000 | 50 ₹150 |
| 9.00 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 3 | No | 800 ₹2,400 | 1,000 ₹3,000 | 1,000 ₹3,000 | 600 ₹1,800 |
| 10.00 | Supply , installation ,testing & commissioning of Sundry items like Aluminium lugs, Jumpers, binding Tape, | 1 | LS | 1,000 ₹1,000 | 1,000 ₹1,000 | 1,000 ₹1,000 | 500 ₹500 |
Tender Value
₹3.4 L
EMD Value
₹6,800
Closing Date
10 Dec 2025, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Installation of 63kva Transformer with poles and wire at Baghat colony under District Capex Budget (PRI) 2025-26 of ED Handwara
2025_PDD_295814_1
e-NIT 60 of 2025-26
Open Tender
Electrical Works
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹500
Office of Executive Engineer ED Handwara
₹6,800
19 Dec 2025
20 Nov 2025
11 Dec 2025
21 Nov 2025
10 Dec 2025
21 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.27 MB
Document
0.98 MB
BOQ
BOQ • 0.33 MB
Download all tender documents and submit your bid