Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 0 PURE LADAI SADR PURE LADAI SULTANPUR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | Admitted-Finance |
| 2 | Admitted-Finance A 24 PATRAKAR COLONY ASHOK NAGAR ALLAHABAD UTTAR PRADESH 211001 | PRAYAGRAJ | UTTAR PRADESH | 211001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
9 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC GONDA
220 KV SUBSTATION CAMPUS GONDA
Work
2022_UPTCL_705748_1
3/ETC(GD)/2022-23
Open Tender
Electrical Works
Fixed-rate
180 days
Gonda
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,888
EE ETD
₹16,000
13 Jun 2022
3 Jun 2022
9 Jun 2022
4 Jun 2022
9 Jun 2022
4 Jun 2022
90 days
Work fo Diversion of 03 Nos. Tower Diversion / Shifting of 132 KV BALRAMPUR (132 KV) To Chini Mill Balrampur Single Circuit Line under ETD- GONDA
ERECTION WORKS
Check Survey and Final Marking
Cost of Excavation of 132 KV Tower Foundation pits including all Earth work, Backfilling & Levelling, etc. for foundation.
Stub-setting with the help of Template
Cost of concreting with Cement Ratio 1:2:4 including cost of Dewatering, Shoring & shuttering, forming curing.
Erection of Super Structure and their Extensions wherever required including all work above ground.
Track Welding of Tower Up to Ist Section.
Laying, stringing, tensioning, clamping & jointing, etc. of ACSR Panther Conductor including hoisting of Insulator, fitting of necessary Harware and accessories on all Three Phases of 132 KV SC Line.
Laying, Stringingof Earth Wire including trasnsportation, fittings of all kind og Hardwares, etc on 132 KV Line.
Grounding Work including Earth work, etc for Pipe Type Grounding including Cost of Coke & Salt.
Installation of Steel eREinforcement Bars in RCC Foundation including Cost of Steel, Cutting Bending placing, Binding, etc.
DISMANTLING & ASSOCIATED WORK :-
Dismantling of Existing Earthwire, necessary Hardware, Rerolling of Earthwire on Empty Drums Safely Transportation of all Removed Material to UPPTCL Stores.
Dismantling of all three phase of Existing ACSR Panther Conductor, all Hardware fittings & accessories. Example:- Armour Rod, Vibration Damper, Insulator Strings, etc. of existing Lines and re-Rolling Dismantled Conductor on Empty Drums Re -Use, Safely Transportation od all removed Material of UPPTCL Stores
Dismantling of Super Structure of 132 KV SC Tower including Cutting of Track Welding Bolts, etc, safely transportation of all removed material to store.
Cutting og Old Stub & Breaking of Foundation up-to 1.5 Meters. Below including Digging & Back Filling of Earth, etc.
MS RK ERACTORS
GANGOTRI CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .