| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-AOC MOHAL WARD NO 10 ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹5.5 Cr | L1 | Accepted-AOC L One Accepted |
| 2 | L2₹6.0 Cr+₹45.5 L (8.26%)Rejected-Finance | ₹6.0 Cr+₹45.5 L (8.26%) | L2 | Rejected-Finance L Two |
| 3 | L3₹6.1 Cr+₹62.4 L (11.3%)Rejected-Finance D J COLONY TARKAPUR MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | ₹6.1 Cr+₹62.4 L (11.3%) | L3 | Rejected-Finance L Three |
| 4 | L4₹6.2 Cr+₹69.2 L (12.5%)Rejected-Finance 980 C SHANDAMA SHIVPURI ALLAHABAD | ₹6.2 Cr+₹69.2 L (12.5%) | L4 | Rejected-Finance L Four |
| 5 | L5₹6.2 Cr+₹70.9 L (12.8%)Rejected-Finance BHARSATHI VARANASI UTTAR PRADESH | MAU | UTTAR PRADESH | 221601 | ₹6.2 Cr+₹70.9 L (12.8%) | L5 | Rejected-Finance L Five |
Tender Value
Refer Docs
EMD Value
₹17.9 L
Closing Date
5 Mar 2024, 12:00 pmClosed
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
Renewal With General Repair of Chopan to Bharhari Madhya Pradesh Border Road
2024_CEUVZ_907641_1
646/53M-Mzp Circle/2024 Dated 13-02-2024
Open Tender
Civil Works
Item Rate
365 days
EE PD PWD SONBHADRA
As Per NIT
3 documents required · 3 mandatory
₹2,720
₹17.9 L
Yes
8 Apr 2024
29 Feb 2024
5 Mar 2024
29 Feb 2024
5 Mar 2024
29 Feb 2024
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Renewing pataries 3 metre (10') wide including dressing surface filling up to 8 cm (3") depth & making namunas at every 15 m.(50') apart on either side of the road true to patri template with side slopes 1:2 etc. for taking the earth to be so dug that form a continuous side drain at road boundary. Take a length of 1 furlong.
The routine maintenance of above road renewal work including patri, pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 1st Year Maintenance cost (0%)
The routine maintenance of above road renewal work including patri, pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 2nd Year Maintenance cost (1.5%)
The routine maintenance of above road renewal work including patri, pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 3rd Year Maintenance cost (3%)
The routine maintenance of above road renewal work including patri, pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 4th Year Maintenance cost (4.5%)
The routine maintenance of above road renewal work including patri, pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surpace and Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) For 5th Year Maintenance cost (6%)
M/S MAHENDRA KUMAR SINGH
M/s Jai Hanuman Construction
M/s Gayatri Constructions
RAJ INFRATECH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .