| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹2.0 LRejected-AOC | ₹2.0 L | L2 | Rejected-AOC IInd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SMV POWER SOLUTION L1 | General Engineering Works L2 |
|---|---|---|---|---|---|
| 1.00Following work is to be carried out for oil replacement, centrifuging of oil, supply & fixing of 03 No. LV Bushing & 01 No. Neutral Bushing and other associated work of 20 MVA T/F (132/33 KV)(M/s GEC Make, Mfg year 1991) at 132 KV S/S Bharwari under ETD-IV, Prayagraj with all cost of man, material, T&Ps as per technical specification for proper completion of work with due safety and precautions as per direction of supervising engineer. | |||||
| 1.01 | Safe transportatiion of filled oil drum of total quantity 12 KL from 220 KV S/S Chinhat under ETD-II, Lucknow (Transmission Central Zone) to 132 KV S/S Bharwari, Kaushambi under ETD-IV, Prayagraj having distance approx (220 Km). The work includes safe shifting and loading of filled Oil drum with the help of hydra/crane, transportation and safe unloading it at working site near 20 MVA T/F at 132 KV S/S Bharwari with the help of Hydra. | 1 | Job | 31,900 ₹31,900 | 32,500 ₹32,500 |
| 1.02 | Shifting of 20 KL T/F Oil Barrel from 220 KV S/S Sirathu, Kaushambi to 132 KV S/S Bharwari by trailer/hydra/crane. This work include loading and unloading of 20 KL T/F oil barrel at concerning sub-station. | 1 | Job | 16,450 ₹16,450 | 17,500 ₹17,500 |
| 1.03 | Complete drain out of T/F oil from the existing 20 MVA into empty 20 KL Oil Barrel then after completely work of transformer the oil into empty drum through centrifuging Machine and stacking of filled oil drums & shifting and stacking of filled oil drum with discarded T/F oil to store room of 132 KV S/S Bharwari, Kaushambi. | 1 | Job | 4,450 ₹4,450 | 4,590 ₹4,590 |
| 1.04 | Cleaning of main tank, core, winding and insulation by fresh transformer oil and removal of sludge from bottom of main tank. This work also include cleaning of OLTC diverter switch and removal of sludge. | 2 | Job | 4,990 ₹9,980 | 6,590 ₹13,180 |
| 1.05 | Filling of dry Nitrogen Gas having DEW point (-) 70 deg. Celcius to (-) 75 deg celcius under vaccum from top cover of the Transformer upto pressure of 3 PSI and maintaining the same in the main tank for minimum 24:00 hrs (maximum 72:00 hrs.) indcluding cost of Nitrogen gas & Nitrogen gas filling device. | 12,000 | Ltr. | 3.95 ₹47,400 | 4.1 ₹49,200 |
| 1.06 | Centrifuging of complete T/F oil in T/F tank & tap changer tank by connecting centrfuging pipe circulating the T/F oil through centrifuging machine to be provided by the contractor and taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer and also measurement of PPM. All labour T&Ps, Centrifuging Machine shall be arrange by contractor at his own cost. | 12 | K.L. | 2,190 ₹26,280 | 2,250 ₹27,000 |
| 1.07 | Replacement of inspection window gasket Drain valve, gasket connected from main tank of T/F. Gasket of window gasket Drain valve, should be replaced as per existing size made of rubberized cork sheet kotika/ Turboze/ Nucork . (gasket should be certified and type tested) | 1 | Job | 42,900 ₹42,900 | 45,000 ₹45,000 |
| 1.08 | Sampling, collection and Transportation of T/F oil for conducting following test from NABL approved lab and submission of test reports and repeating the same job after 15 days of charging of transformer.
1. BDV
2. Tan Delta
3. DGA | 1 | Job | 11,900 ₹11,900 | 13,500 ₹13,500 |
Updated dates
Tender Value
₹1.9 L
EMD Value
₹2,300
Closing Date
19 Dec 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
Replacement of transformer oil and gasket of 20 MVA T/F at 132 KV S/S Bharwari under ETD-IV, Prayagraj
2025_UPTCL_1097676_1
43/ETC-II(P)/2025-2026
Open Tender
Electrical Works
60 days
132 KV S/S BHARWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹2,300
10 Feb 2026
10 Dec 2025
20 Dec 2025
10 Dec 2025
19 Dec 2025
10 Dec 2025
Amount
Following work is to be carried out for oil replacement, centrifuging of oil, supply & fixing of 03 No. LV Bushing & 01 No. Neutral Bushing and other associated work of 20 MVA T/F (132/33 KV)(M/s GEC Make, Mfg year 1991) at 132 KV S/S Bharwari under ETD-IV, Prayagraj with all cost of man, material, T&Ps as per technical specification for proper completion of work with due safety and precautions as per direction of supervising engineer.
Safe transportatiion of filled oil drum of total quantity 12 KL from 220 KV S/S Chinhat under ETD-II, Lucknow (Transmission Central Zone) to 132 KV S/S Bharwari, Kaushambi under ETD-IV, Prayagraj having distance approx (220 Km). The work includes safe shifting and loading of filled Oil drum with the help of hydra/crane, transportation and safe unloading it at working site near 20 MVA T/F at 132 KV S/S Bharwari with the help of Hydra.
Shifting of 20 KL T/F Oil Barrel from 220 KV S/S Sirathu, Kaushambi to 132 KV S/S Bharwari by trailer/hydra/crane. This work include loading and unloading of 20 KL T/F oil barrel at concerning sub-station.
Complete drain out of T/F oil from the existing 20 MVA into empty 20 KL Oil Barrel then after completely work of transformer the oil into empty drum through centrifuging Machine and stacking of filled oil drums & shifting and stacking of filled oil drum with discarded T/F oil to store room of 132 KV S/S Bharwari, Kaushambi.
Cleaning of main tank, core, winding and insulation by fresh transformer oil and removal of sludge from bottom of main tank. This work also include cleaning of OLTC diverter switch and removal of sludge.
Filling of dry Nitrogen Gas having DEW point (-) 70 deg. Celcius to (-) 75 deg celcius under vaccum from top cover of the Transformer upto pressure of 3 PSI and maintaining the same in the main tank for minimum 24:00 hrs (maximum 72:00 hrs.) indcluding cost of Nitrogen gas & Nitrogen gas filling device.
Centrifuging of complete T/F oil in T/F tank & tap changer tank by connecting centrfuging pipe circulating the T/F oil through centrifuging machine to be provided by the contractor and taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer and also measurement of PPM. All labour T&Ps, Centrifuging Machine shall be arrange by contractor at his own cost.
Replacement of inspection window gasket Drain valve, gasket connected from main tank of T/F. Gasket of window gasket Drain valve, should be replaced as per existing size made of rubberized cork sheet kotika/ Turboze/ Nucork . (gasket should be certified and type tested)
Sampling, collection and Transportation of T/F oil for conducting following test from NABL approved lab and submission of test reports and repeating the same job after 15 days of charging of transformer. 1. BDV 2. Tan Delta 3. DGA
General Engineering Works (BID ID -5748975)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
TD1.pdf
Tender Documents • 0.34 MB
BOQ_2021350.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid