Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | L1 | Accepted-AOC Being L1. | |
| 2 | L2₹22.1 L+₹81,845 (3.85%)Rejected-Finance | L2 | Rejected-Finance Being L1. | |
| 3 | L3₹24.5 L+₹3.3 L (15.3%)Rejected-Finance 90 91 LAKE CITY PLAZA KARAN NAGAR SRINAGAR 190010 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190010 | L3 | Rejected-Finance Being L1. | |
| 4 | L4₹30.2 L+₹8.9 L (41.8%)Rejected-Finance KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | L4 | Rejected-Finance Being not L1. |
Tender Value
₹21.1 L
EMD Value
₹42,500
Closing Date
21 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE HQ 133 Works Engrs
HQ 133 WORKS ENGRS PIN-914133 C/O 56 APO
UPGRADATION OF CERTAIN INFRASTRUCTURE AND UPGRADATION OF CERTAIN INFRASTRUCTURE AND PROVN OF ADDL FACILITIES FOR COVID PATIENT AT BB CANTT, SRINAGAR UNDER GE 864 EWS.
2020_MES_364871_2
CWEK-39/2020-21
Open Tender
Support/Maintenance Service
Item Rate
180 days
GE 864 EWS
Class E Category b (i) and c (i)
7 documents required · 7 mandatory
₹500
GE 864 EWS
₹42,500
Yes
HQ 133 WORKS ENGRS
9 Oct 2020
27 Aug 2020
23 Sept 2020
27 Aug 2020
21 Sept 2020
7 Sept 2020
27 Aug 2020 - 4 Sept 2020
4 Sept 2020
60 days
Amount
Supply, installation, testing and commissioning of Horizontal Bed head Panel with provision of safe efficient means delivering services to patients staff in both general and special care applications, It is modular design made of horizontal aluminium extructions and ability to house medical gas terminal unit (as per specifications of tender) and electrical socket , smooth curve surfaces , no visible screws and choice of color decor stripe, ease of installation via separate rail bracket or wall mounting plates easy removal of covers for maintenance and pipeline connection, integral twin medical rail as part of the modular extrusion design. It has segregation of services ie extra low voltage, normal voltage and medical gases, should be maintained throughout. Its aluminium extruction have a polyester coating finish on all external surfaces. It have provision of nurse call, data or monitoring sockets should be made at the point of manufacturing. It should be supplied duly pre-piped, prewired and fully tested or in carcass form. “Each horizontal bedhead panel shaft be having a provision of (as per outlet distribution lest) light with on off switch & electrical connection and 2 Nos of 5/15 Amps & 02 Nos S Amps electrical modular type switch and socket , provision of nurse call , head panel should be minimum 1200mm with rail, and provision for 3 Nos Of Gas outlet all as per directed by Engineer-in-Charge. (a )It shall confirm to ISO standard with the following features: (i) The head wall system should be constructed of aluminium extrusions joined together to form a carcass to suit the particulars application. Unit should be factory assembled for electrical extrusions and mechanical components (ii) Segregation of services i.e low voltage supplies, High voltage supply and medical gases should be throughout. Front fascia plate should be removable individually to access for respective service. Bed space management system with optional equipment rail with all equipment rail mount accessories. All down drops should be installed at one end should be covered with aluminium boxing with matching color. Entire Pipeline should run in continuous horizontal panels with no breaks for each unit & length as per area where it has to be installed (iii) Each Bed head unit shall be supplied with electrical and electrical outlets prefitted , wired and certified. Make: Oxicareengineerings/ Global medlife solution/Aktiv/Life line Mediso/Tedisel / Unissi or equivalent make approved by HQ CENC
Supply, installation, commissioning and testing, Oxygen gas outlet point complete with matching probe / adopter with one end suitable for hose & other end suitable for terminal units complete set for Oxygen & vacuum system as per technical specification confirming to CE certified and as mentioned below :- (a) The Outlets shaft be modular singles, and shaft be design that provides for the ganging of rough-in-plates in the field to form multiples. (b) The gas services shall be sequentially arranged and located as shown on the plans with a minimum centreline spacing of 5 inches (12.5) between outlets. (c) The outlets shall be capable of supporting dispensing equipment without the use of side bracket. The medical gas outlets shall be designed so that once installed routine service of both the primary and secondary check valve can be accomplished without removing the nameplate or gas specific portions. (d) The primary check valve shall be unitized and of the cartridge type. So that the primary check valve can be removed for services without shutting off the gas supply to the outlet, secondary check valve shall operate automatically to stop the free flow of pressure gas. (e) There shall be no secondary check for Vacuum or gas evacuation services. Medical gas outlets that requires the removal of the name plate or gas specific components for routine services shaft not be acceptable.
(f) The outlets shall conform to CE certified and should meet with the provisions of council directive of Medical Devices directive. (g) All outlets are 100 % shall be permanently color coded with durable scratch resistant and protective label. (h) Medical gas outlets shaft be cleaned for oxygen services as per medical standard, capped and placed in a protective combiner for shipment. (j) The outlets shaft be installed in strict accordance with manufacture's instructions, and tested before use in conformance with local and federal codes. (k) Outlets shall be double lock outlet type manufactured with an approx 165 mm length, copper inlet pipe stub which brazed to the outlet body. Body shaft be one pieces brass construction. For Positive pressure gas services, the outlets shall be equipped with the primary and secondary check valve and secondary check valve shall have break safe mechanism and also comply to pressure test standard and rated at minimum 200 psi in the event the primary check valve is removed for maintenance. The outlet assembly should have separate colour coding for each service primary check valve is removed for maintenance. The outlet assembly should have separate colour coding for each service and will accept only corresponding gas specific gas adaptors. All outlets shall be cleaned and de-greased for medical gas services, factory assembled and tested. The medical gas outlets should be of quick connecting and wall modular type. Make: greggersen/ Trumph/Tedisel / Unissi /WTK or equivalent make approved by HQ CENC
All as per Item No. 2.00 & 2.01 here in before but for Vaccum gas outlet gas outlet point with probe / Adapter .
Supply, installation ,commissioning and testing Medical Vacuum Pump Reciprocating Vacuum: Duplex System (1 working + 1 standby) with Receiver tank Vacuum tank-500 ltrs , bacteria filters , vacuum filters, Vacuum switch complete set all technical specifications and as per following details: a. Vacuum Pump single stage, minimum capacity 5 HP each motor each pump should be suited for maximum working pressure of 29 inch mercury (730 mm mercury) Each pump should be fitted with MS channel frame complete having vibration isolators with 3 Nos. Silencer at vacuum pump discharge end. The pump should be air cooled 3 sets of isolation valve on return valve, on return valve and filter should be provided with pumps the system should be expandable to received one additional pump in future. b. Drive assembly: The electrical drive for vacuum pump should be consist of TEFC induction motor operating at 1440 RPM and connected through a Vbelt. The motor should be suited for 415V±10%50Hz 3 phase AC supply capacity 5 HP -02 Nos (1 working + 1 standby) c. Vacuum Receiver: 01 Nos of vacuum receiver of 500 ltrs capacity
: The reservoir should be supplied fabricated from MS sheet plates as per IS:226 and manufactured as per IS:2825. The reservoir should be supplied with safety valve, pressure gauge and drain valves etc. manufacturers test certificates to be provided d. Vacuum Switch: Vacuum Switch of 0-760 mm range should be provided, should have bot NO/NC contracts and suitable for AC supply. The casing with 3/8* BSP gas services connection at the bottom of assembly e. Vacuum Filter: 2 Nos Vacuum filter with drain valve. The filter should be non-ferrous and online. The discharge to autosphere should be through micron filter cartridge, and suitable capacity bacteria filter & secretion trap f. The medical vacuum plant shall be CE marked / ISO comprising of air cooled, oil lubricated rotary vane / reciprocating vacuum pumps to provide a flow rate. Make:Ingersoulrand/Boge/Coaire / Anest Iwara/ IR or equivalent make approved by HQ CENC
Supply, installation ,commissioning and testing and electric control panel wall supported,indoor type having sheet metal 2 mm thickness painted with dry powder 3 tank process, hinged type for vacuum pump of suitable size comprising of change over 4 pole 415 volt 63 Amp-01 Nos, MCCB 415 volt 4 Pole rupturing capacity 16 kA ,100 Amp-01 Nos as incomming ,MCCB 415 volt 4 Pole rupturing capacity 16 kA ,63 Amp-02 Nos as outgoing, DOL type starter for 5 HP motor with single phase preventer -02 Nos incl wiring with suitable size of copper conductor for connection all as per directed by Engineer-in charge
Supply, installation ,commissioning and testing of Oxygen Manifold: Main conforming to ISO standards with middle frames 4+4 size(2 banks X4 cylinders on each bank oxygen manifold), suitable to withstand a pressure of 145kG/cm2 along with high pressure copper annealed tail pipes with end brass adapter suitable for oxygen cylinders and manifold. Top frame comprising of high pressure copper pipes of size 1/2” ID X 15 swg with high pressure brass fitting made of high tensile brass and connections through non return valve; high pressure copper tail pipes, made of high pressure copper pipes of size ¼” ID X 15 swg. The design of middle and bottom frames should be provided to fit both round and flat bottom cylinders safely. The manifold shall be tested hydraulically at 3500 psig and necessary test certificates accompany along with the supply only Non halogenated Polymer materials are to be used in the Non return valves supplied along with the manifold. Make: Oxicareengineerings/ Global medlife solution/Aktiv/Life line Mediso/Tedisel / Unissi or equivalent make approved by HQ CENC
Supply, Installation, commissioning and testing oxygen emergency manifold with mox regulator conforming to ISO standards with middle frames 2+2 size (2 banks X 2 cylinders on each bank oxygen manifold), suitable to withstand a pressure of 145 kG/cm2, along with high pressure copper annealed tail pipes with end brass adapter suitable for oxygen cylinders and manifold. Top frame comprising of high pressure copper pipes of size 1/2” ID X 15 swg with high pressure brass fitting made of high tensile brass and connections through non return valves ;high pressure copper tail pipes, made of high pressure copper pipes of size 1/4” ID X 15 Swg. The design of Middle and bottom frames should be provided to fit both round and flat bottom cylinders safely. The manifold shall be tested hydraulically at 3500 psig and necessary test certificates accompany along with the supply. only Non Halogenated Polymer materials are to be used in the Non return valves supplied along with the manifold. Make: Oxicareengineerings/ Global medlife solution/Aktiv/Life line Mediso/Tedisel / Unissi or equivalent make approved by HQ CENC
Note for item No. 6 & 7: (a) The cylinders required to be measured and paid separately. (b) The rate inclusive for proven of cylinder brackets and fixing chains which will be zinc plated for cylinder placing arrangements (c) The manifold should be tested hydraulically) at 250 kG /Sqcm and rate inclusive for the same. Each header bar shall be with pigtail connections to suit cylinder valves of the cylinder valves as per IS:322 (d) The copper tail pipes are fitted to the individual non return valves of the cylinder manifold for easy removal of cylinders without disturbances to the system operation and the rate inclusive for the same.
Supply, installation, commissioning and testing of Fully Automatic Control Panel for Oxygen The panel shall consist of 2 Nos. pressure regulators, one line regulator, 2 high pressure gauges (4" diameter) and one pressure gauge 4" diameter and interconnecting piping, connecting all these items. Control panel shall give required output 1000 LPM. The electrical circuits shall consist of a step down transformer, 3 Nos. enunciator windows showing ' Power On’, ‘Line Pressure Normal’ and ‘Reserve in Use'. All these items shall be housed in a metal cabinet made out of MS plate and side wall & top made of MS sheet duly painted with best quality of Epoxy paint. Principles of working: The downstream pressure of both the pressure regulators shall be set at a differential pressure. After opening the cylinder on both the banks, gas shall start flowing through the regulator whose pointer is on duty. Once this bank becomes empty the other bank shall takeover automatically. At this point, turn regulator handle anti clock-wise and bring the pointer on reserve and turn regulator handle (whose pointer is on reserve) clockwise and bring it to duty. Cycle shall be repeated as and when duty bank shall become empty. 1. No interruption of gas supply in case of power failure. 2. Status of each bank is indicated on big pressure gauges. 3. Line pressure is indicated in the small pressure gauge. Make: greggersen/ Trumph/Tedisel / Unissi /WTK or equivalent make approved by HQ CEWC
Supply, installation , testing and commissioning of integrated / combined Alarm - Zonal Valve box for -2 gas services. The alarm panel shall be enclosed in a steel decorative frame powder or duly powder coated and shall be designed to accept an electrical input range of 120-140 volt Ac- 50-60 Hzs. The source voltage shall be stepped down with self-contained transformer. The Panel shall contain audible and Visual alarm indicators with the following “features:- (a) It should be combined with alarm for low space consumption. It should provide a zone isolation facility for use either in an emergency or for maintenance purpose. the area valve service unit should incorporated a ball valve with NIST connectors either side mounted on lockable box with emergency access. it should be reliable and easy to operate and must have NIST connectors facilitate easy purge, sample & pressure testing and emergency supply system (b) The unit shall be pre- piped, wired and tested ready for installation into finished building. Medical gas / Vacuum services should be fixed copper, piped to and from their respective area valve service units. A color coded service identity label should be fitted behind the valve handles. The unit should be provide a zone isolation facility, for use either in an emergency or for maintenance purposes. The box shall be made steel decorative frame powder coated to prevent corrosion. All wetted parts (except seals and gaskets) should be brass or copper. Each unit assembly should be factory tested for gas tightness. Rubber pipes grommets should be provide to ensure any leaking gas does not escape from the unit into wall cavity. All visible aluminium should be powder coated. (c) The Valve unit of the compressed or vacuum consists of following components (i) Medical ball valve DN20 pressure gauge per gas type (ii) Valve group consist of valve block , shut off valve and visible physical isolation for services (iii) Quick access by special lock and push in window (iv) diameter connection pipe 22 mm available. (v) Emergency supply inlet NIST coupling , pressure transmitter convent the current pressure to alarm panel The alarm panel system is programmed to ensure a warning signal in cases of any increase or decrease of the pressure
(d) The valves shall be bronze ball type with Teflon (TFE) seats and seals. All valves shall be dual gauge ported , rated at a working pressure of 600 psi (29 in / Hg Vacuum) and shall be operated by a lever type handle, requiring only a quarter turn from a fully open position to fully closed position. Valves shall incorporated an adjustable packing and blow out proof stem. Only full port valves having flow rates comparable to equivalent size of pipe shall be piped from left to right. Valves shall be 3 piece in line repairable type. Each valve assembly shall be supplied cleaned for oxygen service in accordance with current medical standards. The valves tube end shall be capped and sealed in a protective container to prevent contamination prior to installation. Gauges shall be 50mm OD for monitoring pressure and vacuum. (e ) A fully color coded label package shall be supplied with each valve box assembly for application by the installer. The valve box shall be minimum IP-41 with sheet steel construction powder coated to prevent rust. A single box shall be house from one to three valves. Box shall be supplied with a ¾” plaster flange. Valve box assembly shall be supplied with a formed steel decorative frame powder coated which encloses an easily removal flexible window. Make: greggersen/ Trumph/Tedisel / Unissi /WTK or equivalent make approved by HQ CENC
Supply , installation testing & commissioning of Medical line valve or isolation valve 12 mm OD should be CE certified or ball valves as per BS 1057, rated at 400 psig , as well full vacuum (29.9" Hg) valves go from full off by turning the vinyl- gripped valves handle 90 degree locking type handles may be ordered separately when required. Copper tubing is factory installed to help prevent valve seat damage during soldering main and riser valves seat damage during soldering, main and riser valves are not required to be installed in a box unless specially noted or required Make: Conex/RB/RN/SIM/AUDCO/AKTIV/ or equivalent Make approved by HQ CENC
All as per item No. 11 but isolation valve of size 15mm OD.
All as per item No. 11 but isolation valve of size 22 mm OD .
All as per item No. 11 but isolation valve of size 42 mm OD
Supply, installation, testing and commissioning of copper piping of following size with complete fitting / fixtures as per technical specifications and BS -13348 and mentioned below: (a) Installation of Piping should be carried out as per medical standard with outmost cleanliness. (b) Only pipes fittings and valves which have been degreased as per approved medical standards should be used. (c) Pipe fixing clamps for up to as per outer dia of pipes (d) Pipes should suitable nonferrous suitable for the diameter of the pipe and wherever required rigid metallic hanging or cemented supports to be used. (e) The main lines to the building to be taken overhead through heavy grade metallic poles or GI tubes with inspection points in metallic boxes where ever required. Adequate supports shall be provided while laying pipelines to ensure that pipes do not sag. Suitable sleeves shall be provided wherever pipes cross through walls / slabs. All pipe clamps shall be non-reactive to copper. (f) All Pipes joints shall be of copper to copper and should he brazed by silver brazing filler a material without flux while being brazed joints shall be continuously purged with oil free dry nitrogen to prevent the formation of copper oxide on inside surface of the joint (g) All pipes should be installed without springing or forcing (h) All pipes should be protected against mechanical injury in a manner satisfactory to authorities having jurisdiction. (j) Test: After erection, all the new pipes cleaned or purged with the help of dry nitrogen at 2 times of working pressure for 24 hours
(k) Painting : All existing and proposed exposed pipes / should be painted with two coats of synthetics enamel paint & color codification as per IS:2379 of 1963 and approved medical standard. (l) All concealed pipes to have gas identification bands/labels at approaches distances. (m) Similarly all pipe in the wall should be tested /painted/labelled and properly insulated. (n) Certification: To be certified that pipes are suitable for the particular service and complete cross connection (anti confusion) test should be carried out. (o) Distribution piping system: Material (pipe): Solid Drawn seamless, deoxidized non –arsenical half hard, tempered and degreased materials conforming to BS EN 13348. Copper pipe must have reputed third party inspection certified (Eg Llyod’s or kite marked or TUV or SGS). Fitting should be made of copper conforming to BS 864 and suitable for working Pressure to up to 17 bar and especially made for brazed socket type. All copper pipes should be inspected and certified for medical use before dispatch and the pipes should be delivered plugged or capped at both ends Note: a) The tenderer shall design & submit complete layout drawing with proper colour code, fittings, fixtures complete for approval of GE or rep of accepting officer before placing the order and quoted included the same. b) The quoted inclusive of all mechanical protections with metallic pipes to pipes wherever required. MAke: Mexflow/Janya/Metal Gem/Cubex or equivalent make approved by HQ CENC Note (a) The tenderer shall design & submit complete layout drawing with proper colour code , fittings , fixtures complete for approval of GE or rep of accepting officer before placing the order and quoted included the same (b) The quoted inclusive of all mechanical protections with metallic pipes to pipe wherever required.
Copper pipe 42 X 0.9 mm thick
Copper pipe 22 X 0.9 mm thick
Copper pipe 15 X 0.9 mm thick
Copper pipe 12 X 0.7mm thick
Supply, installation, testing and commissioning oxygen back pressure compensated flow meter with control range of 0-15 LPM (calibration within ±10%) with humidifier bottle 250 ML made of unbreakable polycarbonate material and auto clavable at 121 degree centigrade temperature. The flow meter shall be strict precision, durability standard and body shall made of brass chrome plated materials. The flow tube and shrouded components shall be made of clear impact resistant polycarbonate. Flow tube shall have large and expanded 0-5 lpm range for improved readability at low flows with inlet filter of stainless steel wire mesh to prevent entry of foreign particles. Make: Oxicareengineer / Global med life solution/ Lifeline Medisol/ Aktiv/ Unissi/ or equivalent make approved by HQ CENC
Supply, installation, testing and commissioning of ward vacuum unit or ward vacuum unit with 1000ml suction collection jar-01 No as per specifications mention below: (a) The vacuum regulator should have a vacuum gauge with analog display. The scale should be in mbar or mmhg as required by the end user. (b) 1 No of suction regulator and 1 No of 1000 ml polysulfone / polycarbonate collection jar. (c) Suction regulator should be supplied with a safety bar, including and antibacterial filter and filter and anti-overflow safety device and should have wide membranes continuous suction controller. (d) Should have vacuum level 0-760 mm of Hg and should have vacuum gauge fitted with a protective bumper device. (e) Should have a on/off knob allowing for the quick restoration of a readjusted vacuum level (f) Must have central adjustment knob with a color coded for 0-760mm of Hg. Should have Polysulfone /polycarbonate 1700 cc safety jar, autoclavable at 121 degree centigrade at 5 mins, unbreakable , fitted with an anti-overflow safety device and equipped with a plastic anti-bacterial filter and should be totally transparent, to ensure perfect sucked liquid visibility Make: Oxicareengineer / Global med life solution/ Lifeline Medisol/ Aktiv/ Unissi/ or equivalent make approved by HQ CENC
Supply and fixing high pressure tube for vacuum all as per ditrected by Engineer-in charge.
Supply and fixing low pressure tube all as per ditrected by Engineer-in charge.
Note for Item No 1 to 19:The quoted rate inclusive for following (a) If the performance of any individual equipment or system is not satisfactory, the same shall be replacedby the supplier free of cost. (b) If it is found that to meet the performance criteria any extra equipment is required the same will be provided free cost by the supplier. (c) All faults appearing the their rectfication shall be periodically advised to the hospital the period being not more than a month. (d) Any lacuna or lacucae noticed in the fuctioning of installation as a result of any design feature shall be rectified by the supplier free of cost. (e) The contractor shall fully associate the engineers and technicians of the Institute during installation, testing , commissioning , opeartion and maintenance. (f) The contractor shall train the staff of hospital the operation of complete medical gas and oxygen plant system.
M&L for earthing complete with copper plate 60×60cm ×3.15mm thick electrode , burried directly in ground, earth pit not less than 2.25m deep below normal ground level with top edge of the plate not less than 1.5m below normal ground level, connected to equipment by using 20×3mm copper strip as earthing lead as earthing lead by means of bolts,nuts,checknut & washers of galvanised iron all as shown in elect plate No.5 of MES schedule and connected to earthing test point all as specified and directed including earth pit of size 30cmx30cmx45cm made of PCC 1:3:6 and PCC 1:2:4 cover, funnel, GI tubing etc. & testing on completion, all as specified. Note : The units rate includes the cost of excavation & earth work in any type of soil charcoal & salt in altemate layers, 20mm GI Pipe (medium grade) for watering & 25 mm GI protection pipe (light grade) funnel wire mesh PCC 1:2:4 type B1 chamber in cement concrete ,50 mm thick precast RCC cover duly reinforced with XPM (weight not less than 3 kg /sqm ) and CI frame etc , and including provision of test point , connecting to test point and testing on completion etc, complete all as specified.
Earthing complete with and including galvanised steel earth plate electrode 60 cmx 60cm x 6 mm thick surrounded by mixture of charcoal and salt in alternate layers , buried directly in ground vertically in a pit of depth not less than 2.25 meter deep below ground level with top as of the plate at a depth of not less than 1.5 mtrs below normal ground level connected to galvanized iron or steel earth lead wire 4.0 mm dia,(No 8 SWG) by means of bolts ,nuts, check nuts and washers of galvanised iron or steel earth wire protected by galvanised steel pipe 15 mm bore (light grade) and connected to main switch or main control board all as shown in electrical plate No. 3 of SSR - 2009(Pt I) & including necessary excavation and earth work. Note : The units rate includes the cost of excavation & earth work in any type of soil charcoal & salt in altemate layers, 20mm GI Pipe (medium grade) for watering & 25 mm GI protection pipe (light grade) funnel wire mesh PCC 1:2:4 type B1 chamber in cement concrete ,50 mm thick precast RCC cover duly reinforced with XPM (weight not less than 3 kg /sqm ) and CI frame etc , and including provision of test point , connecting to test point and testing on completion etc, complete all as specified.
Supply, laying, testing and commissioning of cable LT XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 35 sq. Mm 3.5 core confirming to IS specification complete all as specified and as directed.
Excavation in trenches in hard / dense soil n.exc 1.5 mtr wide & n.exc 1.5mtr in depth for foundation of poles / layings of under ground cables in trenches and getting out including dressing / trimming sides and levelling , grading, grading and ramming of bottom of excavation complete all as specified
Returning, filling in trenches including spreading, levelling, watering and well ramming excavated soil in layers n.exc 25cm thick each excavated soil in trenches complete all as specified.
Removing of surplus soil to a distance n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above starting point all as specified.
Clean dry sand laid in trenches/ ducts for bedding and cushioning to cable, including spreading and levelling complete all as specified and directed.Note:- (i) / punned thickness of sand shall be considered for purpose of payment(ii) Sand shall be same as specified for plastering work.
Supply and Laying Bricks old size sub class 'B', of class designation 75, for the protection of cable laid flat dry across the cable complete all as specified and as directed.
Supply and fixing GI pipe, light grade 50 mm bore, ISI Marked for protection to cable along the pole/across road crossing/passing through culvert complete all as specified.
M&L point wiring using approved colour coding as per IS with stranded FRLS copper conductor single core 2.5 Sqmm (Nominal area), PVC insulated cable in and incl casing-n-caping medium grade with all connecting accessories incl mild steel sunken boxes suitable for mounting switch/sockets with earth dolly duly painted with two coats of anti corrosive paint over a coat of red oxide primer incl mounting frame over cover plate, covered with 3mm thick plastic laminated sheet, incl PVC insulated FRLS copper conductor 2.5 Sqmm (Nominal area) single core PVC cable as earth continuity conductor to common earth and connecting to earth dolly complete all as specified. Note : (i) Rate of Switch & Sockets can be included with Item No. 1 above
One switch socket outlet 3 pin,15 Amp on the independent board with item No. 30.00
All as per item No. 30.00 but copper conductor of size 1.5 Sqmm but on same board with item No. 31.00
Sheet metal enclosure with double door for DBs conforms to IS:8623.III , IP:43 protection, shrouded neutral bar and cement spill protector, 12 way, 240 Volt
Sheet metal enclosure with double door for DBs conforms to IS:8623.III , IP:43 protection, shrouded neutral bar and cement spill protector, 8 way, 240 Volt
MCB, 'C' curve SPN, 240 V, 25-32 Amp 240 volt breaking capacity 10 kA
MCB 'C' curve single pole 6 to 32 Amp, 240 volt breaking capacity 10 kA
Submain wiring with 2 single core PVC insulated FRLS cable 6 Sqmm copper conductor PVC sheathed in and including rigid PVC casing & caping, drawn with 4 Sqmm PVC insulated copper conductor cable for earth wire fixed with shaddle and connecting to common earth teriminals complete all as specified.
S &F of powder coated aluminium anodised frame (as in partition wall) section weighting of frame not less than 0.55 Kilogram /metre with ACP sheet incl all necessary clips, rubber neoprene packing with aluminium partition wall as in complete all as specified and directed by Engr -in-charge.
M/S M.A.S ELECTRICALS
M/S THERMOTECH ENGINEERS
M/S RATHER CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .