| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15,570Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹18,741+₹3,171 (20.4%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | KHAN ENTERPRISES L1 | SHARMA ELECTRIC WORKS L2 |
|---|---|---|---|---|---|
| 1.00Safe carriage of following materials from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms. | |||||
| 1.01 | S.T. Pole 13 Mtr. Long | 157 | No. | - | - |
| 1.02 | S.T. Pole 11 Mtr. Long | 539 | No. | - | - |
| 1.03 | PCC Pole 8.5 Mtr. Long | 254 | No. | - | - |
| 1.04 | Top Channal (125x65x2240mm) | 203 | No. | - | - |
| 1.05 | Dropper Channal (100x50x2028mm) | 68 | No. | - | - |
| 1.06 | Earthing Complate | 938 | No. | - | - |
| 1.07 | Stay Complate | 861 | No. | - | - |
| 1.08 | M.S. T/F Base Angle | 104 | No. | - | - |
| 1.09 | M.S.Angle 65x65x6x6 mm for Bracing Set With 2 No clamps | 125 | Set | - | - |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
16 Sept 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
EDCA-03/2025-26
2025_DVVNL_1064191_3
EDCA-03/2025-26
Open Tender
Electrical Works
Turn-key
60 days
EDD-ATRAULI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
DVVNL WEBSITE
₹1.6 L
27 Sept 2025
4 Sept 2025
16 Sept 2025
4 Sept 2025
16 Sept 2025
4 Sept 2025
Amount
Safe carriage of following materials from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms.
S.T. Pole 13 Mtr. Long
S.T. Pole 11 Mtr. Long
PCC Pole 8.5 Mtr. Long
Top Channal (125x65x2240mm)
Dropper Channal (100x50x2028mm)
Earthing Complate
Stay Complate
M.S. T/F Base Angle
M.S.Angle 65x65x6x6 mm for Bracing Set With 2 No clamps
V-Type Steel cross arm with clamp
11 KV Pin Insulator with Pin complate
11 KV Disc insulator with fitting
33 KV Pin Insulator with nut
33 KV Disc Insulator B&S Type 7000 Kg
Disc Fitting For Dog 7000 Kg
Phase wire ACSR DOG conductor
11 KV TPMO
T/F 25 KVA Transformer
T/F 63 KVA Transformer
T/F 100 KVA Transformer
11 KV XLPE Cable 3x70sqmm
L.T. XLPE Cable 1x240 Sqmm
O/D Cable jointing kit suitabling for 3x70 Sqmm XLPE CABLE
L.T. XLPE Cable 1x120 Sqmm
S.T./ Joist Girder Pole 09 Mtr.
Cable ABC 3X120+1X95+1X16 Sq.mm.
Cable ABC 3X95+1X70+1X16 Sq.mm.
Packing Piece and clamp for above with bolt and Nut
Supply & Erection work of following materials:-
Stone pad
Suspension Clamp with I-Hook
Piercing Connector
Distribution Box 3P with clamp
Holding Clamp with N&B for D/P
Dead & End Clamp
Concreting of Pole
Concreting of Stay
GI Pipe 6 dia
M.S. T.off channal with clamp (100x50x1300mm)
Holding clamp with Bolt nut
F-Braket for fitting top channal
E-Braket
Danger Plate with clamp N &B
Danger Board with Clamp for 33 KV
M.S.Nuts,Bolts&Washers all Size
Earth Wire Clamp with N&B
Barbed wire G.I.
Number Plate
Red Oxide paint
Aliminum Binding Wire
Alluninium Tape
Alluninium Paint
11 KV FUSE SET
P.G. Clamp
Clamp with nut Bolt
Gaurding Angle with Clmap
Armour road with ferules of dog
G.I. Wire 6 SWG
G.I. Wire 10 SWG
LUG 120 Sqmm
LUG 240 Sqmm
33 KV F-Bracket
33 KV E-Bracket
Body and neutral earthing above of 63 KVA distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of "B" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work.
Complete chemical earthing (upto 25 KVA T/F) of 11/0.4 KV, Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:- 1. Earth pipe material – mild steel, Galvanized. 2-Main Electrode diameter – 42.4mm. 3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm. 5-Wall thickness of auxiliary hole: - 3.2mm. 6- Length of earthing electrode (PIP):- 3 Meter.
Construction of 100 KVA Transformers of Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work.
FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUND 100 KVA CAPACITY TRANSFORMERS. The complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 50x50x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work.
Dismantling and removal of existing following materials from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
L.T. ABC Cable (Scrap)
ACSR Weasel Conductor (Scrap)
ACSR Dog Conductor (Scrap)
Iron (Scrap)
T/F 16 KVA O&U
T/F 25 KVA O&U
T/F 63 KVA O&U
Demounting & installation (Shifted) from site to other nearest place on plinth/Double Pole as per site requirement of following capacity transformers/CT-PT Unit including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
25 KVA T/F (Shifting)
63 KVA T/F (Shifting)
100 KVA T/F (Shifting)
250 KVA T/F (Shifting)
CT-PT Unit (Shifting)
SHARMA ELECTRIC WORKS (BID ID -5523899)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .