Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-Finance | 1 | Accepted-Finance Accepted L1 Bidder | |
| 2 | 2₹3.5 L+₹400 (0.12%)Rejected-Finance | 2 | Rejected-Finance Rejected due to not lowest | |
| 3 | 3₹3.5 L+₹2,760 (0.80%)Rejected-Finance 23609 A INDERJEET SINGH BATH MANSA ROAD NEAR I T I CHOWK BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | 3 | Rejected-Finance Rejected due to not lowest | |
| 4 | 4₹4.0 L+₹54,330 (15.8%)Rejected-Finance 86 INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | 4 | Rejected-Finance Rejected due to not lowest | |
| 5 | 5₹4.4 L+₹94,000 (27.3%)Rejected-Finance 36 RANJEET NAGAR SHAHBAD MARKANDA NH 1 KURUKSHETRA HARYANA 136135 | KURUKSHETRA | HARYANA | 136135 | 5 | Rejected-Finance Rejected due to not lowest |
Tender Value
₹7.4 L
Closing Date
17 Aug 2022, 6:00 pmClosed
MAJ NEHAIL SHAHNAWAZ
MAJ NEHAIL SHAHNAWAZ GE PROJECT BATHINDA
SOIL INVESTIGATION AND TOPOGRAPHICAL SURVEY FOR PROVN OF KLP PH I OF TWO PHASES FOR 3 EW BN AT BATHINDA MIL STN
2022_MES_543794_1
3007/JOB//2022-23/02/E3
Open Tender
Job Works
Item Rate
30 days
GARRISON ENGINEER P BATHINDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Oct 2022
6 Aug 2022
19 Aug 2022
6 Aug 2022
17 Aug 2022
10 Aug 2022
Amount
Soil investigation is to be carried out as per IS :1892 Bore hole dia shall be 150mm, Depth of bore shall be decideded as per the soil condition and may be taken 15m or N value reaches 50, whichever is earlier. Note : Under this test following results also be provided : (i) Grain size analysis, indetification & classification of soil. (ii) Unit weight (bulk density), natural moisture content, Liquid limit, Plastic limit, Shrinkage limit, Plasticity index, Specific gravity. (iii) Dry density, degree of saturation of soil. (iv) Free swelling index & swelling pressure if expansive soil is encountered. (v) Shear parameters (C- analysis). (vi) Consolidatioin test & permeability test. (vii) Depth of water table below ground level . (viii) Presence of loose soil, if any and its depth. (ix) If weak soil with lesser N value as specification in table-1 of IS :1893 (Part-I) 2016 is encountered then evaluation of liquefaction potential shall be assessed and remedial action to be adopted shall be specified. (x) SPT test shall be done at 1.0 interval. (xi) Recommendation for filling under floor and filling under protection including plinth protection. (xii) For open foundation, calculation of net SBC at 1.5m, 2m, 2.5m, 3.0m from shear analysis as well as SPT value settlement criteria SBC values shall be calculated based on C analysis as well as SPT value. For calculation formula given in IS 6403 shall be used. (xiii) Recommendation regarding type of foundation to be adopted & net SBC/pile capacity to be adopted. Also, recommedation shall be given regarding stability of soil and soil stabilization required, if any. (xiv) Bore log details shall be as per Appx 'D' of IS 1892 N values depth wise shall also be shown in bore log details. Bore log details shall be signed by GE, AGE and soil consultant. (xv) Undisturbed soil samples shall be collected at 1.5m interval and at change of strata. (xvi) Shear Strength using Direct Shear or Tri-axial Test.
Bore hole dia shall be 150 mm. Depth of bore shall be decided as per the soil condition and may be taken 25 m or N value reaches 50, whichever is earlier for OHR.
Chemical analysis of soil and recommedation and type of cement to be used for RCC foundation.
Chemical analysis of ground water (Ground water to be obtained from bottom of bore hole).
Plate load test for ascertaining SBC at the proposed level of foundation specified for OHR only.
Topographical survey with total staion instrument for site showing all natural and man made features on the site, preparation plans (maps) showing all permanent features, incl buildings, large trees, pucca & kacha nullas, ditches, nearby road/approaches, railway track, culverts, over transmission lines, ridges, boundary wall, fencing, demarcation line & levels @ 5mx5m grid and estimating earthwork complete, including submission of topo maps and detailed earth work calculation according to Simpsons rule, 06 copies spirally binded alongwith hard and soft copy. Note:- (i) Borehole positioin duly marked on plan and their distance from adjacent prominent reference points. (ii) Plan size of bldgs shall also be marked in the plan. This plan shall be signed by GE, AGE and soil consultant. (iii) Color photograph on A4 size photo paper of the site with the locations of the boreholes duly flagged should be submitted. The photographs should also preferably include any reference structure and the indentification of the same be marked. (iv) A CD containing video evidence of the depth of each borehole and machinery deployed at site lacation will be provided which is inclusive in quoted rate
National Soil Testing and Research Laboratories
GEO MEDIA ENGINEERING and CONSULTANCY SERVICES PRIVATE LIMITED
Interstellar Testing Centre Private Limited
Rishi Markandeshwar Engineering Consultant
Shivom Engineers Associates Pvt. Ltd.
Soigne Engineering Consultants
MEENAKSHI GEOTECH
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .