Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance | -0.25% | ₹24.9 L | L1 | Admitted-Finance |
| 2 | L2₹26.3 L+₹1.3 L (5.26%)Admitted-Finance | +5.00% | ₹26.3 L+₹1.3 L (5.26%) | L2 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
20 Jul 2026, 5:00 pmClosed
Executive Engineer MCD-III Jammu Municipal Corp.
Executive Engineer MCD-III Jammu Municipal Corp.
Construction of Drain alongwith Lane from the House of Farid Alam to Shamshan Ghat morh at Karan Vihar Tan Mohall Thather Jammu W No 63
2026_HAUDD_313618_15
E-NIT No.JMC/D-III/15 of 2026-27 ( CAPEX 2026-27 )
Open Tender
Civil Works
Percentage
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
M/S PERFORMANCE SECURITY DEPOSIT JMC
₹50,000
3 Aug 2026
25 Jun 2026
21 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 103.86 | cum | 479.3 | ₹49,780.1 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 306.69 | Sqm | 91.75 | ₹28,138.81 |
| 3 | Removal of Excavated mulba, dismantled unserviceable material from the site of work by MT/Animal transport or other wise including loading /unloading complete job. | 135.53 | Cum | 130 | ₹17,618.9 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 16.69 | Cum | 4,826.5 | ₹80,554.29 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 49.26 | Cum | 5,733.6 | ₹2,82,437.14 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)) | 3.37 | Cum | 6,591.25 | ₹22,212.51 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 25.28 | Cum | 7,788.4 | ₹1,96,890.75 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,034.15 | Kg | 123.2 | ₹3,73,807.28 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns. | 253.9 | Sqm | 286.35 | ₹72,704.27 |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 3,150 | Kg | 181.6 | ₹5,72,040 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1015351.xls
BOQ • 0.29 MB
EmdDlpDateNit15.pdf
PDF • 0.28 MB
EXTENSION18072026.pdf
PDF • 0.48 MB
CORRIGENDUMCAPEX.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .