Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.4 CrAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹3.6 Cr+₹19.5 L (5.70%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹4.5 Cr+₹1.1 Cr (32.4%)Rejected-Finance C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹4.6 Cr+₹1.2 Cr (35.3%)Rejected-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L-4 | Rejected-Finance L-4 | |
| 5 | Rejected-Technical GRAM SIJWAHI MAUDAHA HAMIRPUR U P | HAMIRPUR | UTTAR PRADESH | 210301 | - | Rejected-Technical All Bid Rejected in Technical Evaluation |
| Sl No | Description | Qty | Unit | M/S KASON CONSTRUCTION L1 | VELJI RATNA SORATHIA INFRA PVT. LTD L4 | Shri Krishna Construction Projects Pvt Ltd L3 | M/S SURESH CHANDRA GUPTA L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in MKR mixed soil in excavation of foundation in canal i/c lead upto 30 m and lift upto 1.5m with manual compaction and dressing. | 7,148.39 | Cum | 45 ₹3,21,677.64 Lowest | 125 ₹8,93,549 | 115 ₹8,22,065.08 | 67.21 ₹4,80,443.43 |
| 2.00 | E/W in MKR mixed soil in correcting section of canal and repair of approach road. i/c lead upto 30 m and lift upto 1.5m with manual compaction and dressing. E/W making diversion | 18,481.05 | Cum | 35 ₹6,46,836.75 Lowest | 125 ₹23,10,131.25 | 115 ₹21,25,320.75 | 51.51 ₹9,51,958.89 |
| 3.00 | E/W in MKR mixed soil in Filling section of canal i/c lead upto 595 m and lift upto 1.5m with manual compaction and dressing. | 64,000.9 | Cum | 103 ₹65,92,092.7 | 80 ₹51,20,072 | 78 ₹49,92,070.2 Lowest | 179.5 ₹1,14,88,161.55 |
| 4.00 | P.C.C. 1:3:6 with 25-53mm gauge stone ballast i/c all cost of material labour T&P etc. | 1,128.75 | Cum | 3,700 ₹41,76,389.8 | 11,010 ₹1,24,27,581.54 | 10,850 ₹1,22,46,980.9 | 3,401.12 ₹38,39,027.8 Lowest |
| 5.00 | Laying C.C. 1:2:4 at top of parapet | 134.11 | Cum | 4,500 ₹6,03,495 | 11,200 ₹15,02,032 | 10,940 ₹14,67,163.4 | 4,140.14 ₹5,55,234.18 Lowest |
| 6.00 | R.C.R. Stone masonary with 1:4 cement sand mortar i/c all cost of material labour T&P etc. | 4,324.72 | Cum | 4,580 ₹1,98,07,226.76 | 4,800 ₹2,07,58,665.6 | 4,710 ₹2,03,69,440.62 | 3,964.41 ₹1,71,44,971.14 Lowest |
| 7.00 | Struck raised cement pointing with 1:2 cement sand mortor i/c all cost of material labour T&P | 7,036.63 | Sqm | 125 ₹8,79,578.75 | 190 ₹13,36,959.7 | 190 ₹13,36,959.7 | 95.08 ₹6,69,042.78 Lowest |
| 8.00 | Centering and Shuttering for R.C.C. Work | 81.55 | m2 | 450 ₹36,697.5 | 510 ₹41,590.5 | 510 ₹41,590.5 | 414.2 ₹33,778.01 Lowest |
| 9.00 | Reinforcement for R.C.C. work including cutting, placing & binding with G.I. wire including all cost of labour, material, T&P etc. | 2.42 | MT | 70,300 ₹1,70,126 | 90,100 ₹2,18,042 | 92,100 ₹2,22,882 | 50,886.94 ₹1,23,146.39 Lowest |
| 10.00 | R.C.C. with Concrete Mix (M20) 1:1.5:3 (19 mm stone grit) cement sand with 19mm gauge ballast including all cost of labour, material, T&P etc. | 14.59 | Cum | 5,500 ₹80,245 | 11,750 ₹1,71,432.5 | 11,100 ₹1,61,949 | 4,997.01 ₹72,906.38 Lowest |
Tender Value
₹5.0 Cr
EMD Value
₹10.0 L
Closing Date
14 Aug 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restoration of 08 No Canals under of Khanna Section of Mahoba District. (LOT-02)
2026_UPIDC_1168000_2
07/SE/2026-27 dt 01-07-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹10.0 L
22 Sept 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in MKR mixed soil in excavation of foundation in canal i/c lead upto 30 m and lift upto 1.5m with manual compaction and dressing. | 0.8 | Cum | 92.9 | ₹74.23 |
| 2 | E/W in MKR mixed soil in correcting section of canal and repair of approach road. i/c lead upto 30 m and lift upto 1.5m with manual compaction and dressing. E/W making diversion | 1 | Cum | 71.2 | ₹71.13 |
| 3 | E/W in MKR mixed soil in Filling section of canal i/c lead upto 595 m and lift upto 1.5m with manual compaction and dressing. | - | Cum | 248.1 | - |
| 4 | P.C.C. 1:3:6 with 25-53mm gauge stone ballast i/c all cost of material labour T&P etc. | 0.6 | Cum | 4,700.92 | ₹2,815.85 |
| 5 | Laying C.C. 1:2:4 at top of parapet | - | Cum | 5,722.38 | - |
| 6 | R.C.R. Stone masonary with 1:4 cement sand mortar i/c all cost of material labour T&P etc. | 0.8 | Cum | 5,479.49 | ₹4,378.11 |
| 7 | Struck raised cement pointing with 1:2 cement sand mortor i/c all cost of material labour T&P | - | Sqm | 131.41 | - |
| 8 | Centering and Shuttering for R.C.C. Work | 1 | m2 | 572.5 | ₹571.93 |
| 9 | Reinforcement for R.C.C. work including cutting, placing & binding with G.I. wire including all cost of labour, material, T&P etc. | 1 | MT | 70,334.4 | ₹70,264.07 |
| 10 | R.C.C. with Concrete Mix (M20) 1:1.5:3 (19 mm stone grit) cement sand with 19mm gauge ballast including all cost of labour, material, T&P etc. | 1 | Cum | 6,906.72 | ₹6,899.81 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
BOQ_2208746.xls
BOQ • 0.35 MB
TD.pdf
Tender Documents • 2.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .