| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 CrAccepted-AOC BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹48.7 Cr+₹4.8 Cr (11.0%)Rejected-AOC HOUSE NO 59 ZOO NARENGI ROAD GEETANAGAR GUWAHATI 781021 ASSAM | KAMRUP METRO | ASSAM | 781021 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹50.2 Cr+₹6.3 Cr (14.4%)Rejected-AOC 11TH FL OFFICE NO 1103 SHELTON CUBIX PL NO87 SEC 15 CBD BELAPUR NAVI MUMBAI 400706 | NAVI MUMBAI | THANE | MAHARASHTRA | 400706 | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Shivam transcon Pvt.Ltd L2 | M/S Badri Rai & Company L1 | Bhartia Infra Projects Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(I) By Manual Means
(A) In area of non thorny jungle | 14.14 | Hectare | 52,995.08 ₹7,49,350.43 | 50,000 ₹7,07,000 Lowest | 54,584.93 ₹7,71,830.91 |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
I. By Manual Means
(C ) Reinforced Cement Concrete | 1,135.45 | Cum | 1,270.8 ₹14,42,929.86 | 1,150 ₹13,05,767.5 Lowest | 1,308.92 ₹14,86,213.21 |
| 3.00 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 62,152.5 | Sqm | 7.35 ₹4,56,820.88 | 6 ₹3,72,915 Lowest | 7.57 ₹4,70,494.43 |
| 4.00 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. Private Land | 1,40,718.57 | Cum | 183.42 ₹2,58,10,600.11 Lowest | 222 ₹3,12,39,522.54 | 265.96 ₹3,74,25,510.88 |
| 5.00 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 773.64 | Cum | 120 ₹92,836.8 Lowest | 150 ₹1,16,046 | 174.94 ₹1,35,340.58 |
| 6.00 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Private Land | 45,390.29 | Cum | 190 ₹86,24,155.1 Lowest | 270 ₹1,22,55,378.3 | 349.87 ₹1,58,80,700.76 |
| 7.00 | Excavation in Cutting in Soil by manual means with lead upto 50 m
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Manual method should be adopted where machines can not be deployed due to site condition) | 1,105.19 | Cum | 135 ₹1,49,200.65 | 130.44 ₹1,44,160.98 Lowest | 141.42 ₹1,56,295.97 |
| 8.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
For Grading I Material | 16,425.1 | Cum | 2,600 ₹4,27,05,260 | 2,300 ₹3,77,77,730 Lowest | 2,684.72 ₹4,40,96,794.47 |
| 9.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead | 28,975.19 | Cum | 3,300 ₹9,56,18,127 | 2,946 ₹8,53,60,909.74 Lowest | 3,409.84 ₹9,88,00,761.87 |
| 10.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ).
By Mechanical Means.
(ii)Grading- II .
(c)Using Screening Type-B (11.2mm Agg.) | 188.3 | Cum | 3,823.64 ₹7,19,991.41 | 3,300 ₹6,21,390 Lowest | 3,938.35 ₹7,41,591.31 |
Tender Value
₹48.8 Cr
EMD Value
₹97.5 L
Closing Date
29 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer (Roads), PWRD, Assam
O/o the Chief Engineer Roads, PWRD, Assam, Chandmari, Guwahati, 781003
ASOM_MALA_2.0_23_24_03 Improvement Upgradation of Road from Butikur to Ghilamara from (Chainage 0 .00 to 15.989) under Asom Mala 2.0 for the year 2023-24
2024_PWD_35279_3
CE/DEV/TB/737/2023-24/01
Open Tender
Civil Works
Item Rate
540 days
Dhemaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹97.5 L
Yes
O/o the Chief Engineer Roads, PWRD, Assam
4 Jul 2024
8 Jan 2024
29 Jan 2024
8 Jan 2024
29 Jan 2024
22 Jan 2024
8 Jan 2024 - 20 Jan 2024
20 Jan 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(I) By Manual Means
(A) In area of non thorny jungle | 14.14 | Hectare | 52,995.08 | ₹7,49,350.43 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
I. By Manual Means
(C ) Reinforced Cement Concrete | 1,135.45 | Cum | 1,270.8 | ₹14,42,929.86 |
| 3 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 62,152.5 | Sqm | 7.35 | ₹4,56,820.88 |
| 4 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. Private Land | 1,40,718.57 | Cum | 258.21 | ₹3,63,34,941.96 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 773.64 | Cum | 169.84 | ₹1,31,395.02 |
| 6 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Private Land | 45,390.29 | Cum | 339.68 | ₹1,54,18,173.71 |
| 7 | Excavation in Cutting in Soil by manual means with lead upto 50 m
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Manual method should be adopted where machines can not be deployed due to site condition) | 1,105.19 | Cum | 137.3 | ₹1,51,742.59 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
For Grading I Material | 16,425.1 | Cum | 2,606.52 | ₹4,28,12,351.65 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead | 28,975.19 | Cum | 3,310.52 | ₹9,59,22,946 |
| 10 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ).
By Mechanical Means.
(ii)Grading- II .
(c)Using Screening Type-B (11.2mm Agg.) | 188.3 | Cum | 3,823.64 | ₹7,19,991.41 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_57508.xls
BOQ • 0.45 MB
136869755.pdf
Tender Documents • 1.37 MB
136869756.pdf
Tender Documents • 5.31 MB
136869758.html
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .