Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAccepted-AOC BUILDING NO 8 RAJEBAHADUR MANSION A D MARG FORT MUMBAI | MUMBAI | MUMBAI CITY | MAHARASHTRA | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹12.7 Cr+₹86.0 L (7.27%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | Not Admitted-Fee/PreQual/Technical ABC HOUSE PLOT NO 432 5TH FLOOR PHULNAKHARA BHUBANESWAR 754001 ODISHA | CUTTACK | ODISHA | 754001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical SHOP NO 1 SURVEY NO 34 PUNE | PUNE | PUNE | MAHARASHTRA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 102 SAIPREM COMPLEX JUNA AUSA ROAD LATUR 413 512 | LATUR | LATUR | MAHARASHTRA | 413512 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.8 Cr
EMD Value
₹5.4 L
Closing Date
4 Sept 2023, 6:15 pmClosed
Ex.Engr.P.W.North Division Pune-1
Ex.Engr.P.W.North Division Pune-1
Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam A)( Pond 2 to 4) (Working Portion -Zone-III) B) ( Pond 4 to 5) (Working Portion - Compound wall Zone-II) C) ( Pond 5 to River End ) (Working Portion -Zone-I Zone -II) Tal- Ambegaon
2023_PWDRP_934893_1
Northpune/2023-24 /32
Open Tender
Civil Works - Roads
Percentage
ghodegaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹5.4 L
Chief Engineer P.W.REGION PUNE On 22/08/2023 at 12
26 Jul 2024
11 Aug 2023
8 Sept 2023
11 Aug 2023
4 Sept 2023
11 Aug 2023
22 Aug 2023
eProcurement System Government of Maharashtra Created By: Raobahadur Patil Created Date/Time: 08-Nov-2023 01:12 PM Tender Title: Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam A)( Pond 2 to 4) (Working Portion -Zone-III) B) ( Pond 4 to 5) (Working Portion - Compound wall Zone-II) C) ( Pond 5 to River End ) (Working Portion -Zone-I Zone -II) Tal- Ambegaon Tender ID: 2023_PWDRP_934893_1
Tender Inviting Authority: Executive Engineer Public Works (North) Division, Pune
Name of Work: Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam A) ( Pond 2 to 4) (Working Portion -Zone-III) B) ( Pond 4 to 5) (Working Portion - Compound wall & Zone-II) C) ( Pond 5 to River End ) (Working Portion -Zone-I Zone -II) Tal- Ambegaon, Dist PuneDist Pune
Contract No: 020-26123305
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Savani Heritage Conservation Pvt Ltd(GSTN-27AAJCS4567L1ZO) 107546243.00 10.00 118300867.30 Eleven Crore Eighty Three Lakh Eight Hundred and Sixty Seven
2.00 USHTA INFINITY CONSTRUCTION CO. PVT LTD(GSTN-27AAACI9029G1ZJ) 107546243.00 18.00 126904566.74 Tweleve Crore Sixty Nine Lakh Four Thousand Five Hundred and Sixty Six
Lowest Amount Quoted BY: Savani Heritage Conservation Pvt Ltd(118300867.30)
BOQ Summary Details Tender Title: Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam A)( Pond 2 to 4) (Working Portion -Zone-III) B) ( Pond 4 to 5) (Working Portion - Compound wall Zone-II) C) ( Pond 5 to River End ) (Working Portion -Zone-I Zone -II) Tal- Ambegaon Tender ID: 2023_PWDRP_934893_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Savani Heritage Conservation Pvt Ltd 118300867.30 L1
2 USHTA INFINITY CONSTRUCTION CO. PVT LTD 126904566.74 L2
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1629102.xls
BOQ Document • 0.28 MB
127053098.pdf
Tender Document • 1.49 MB
32-1.pdf
Tender Document • 6.62 MB
127053100.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .