Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹9.6 L | 1 | Accepted-Finance L-1 |
| 2 | 2₹9.7 L+₹9,356.59 (0.97%)Rejected-Finance | ₹9.7 L+₹9,356.59 (0.97%) | 2 | Rejected-Finance L-3 |
| 3 | 3₹9.8 L+₹16,250.91 (1.69%)Rejected-Finance | ₹9.8 L+₹16,250.91 (1.69%) | 3 | Rejected-Finance L-2 |
Tender Value
₹9.8 L
EMD Value
₹98,490
Closing Date
25 Jun 2026, 3:30 pmClosed
CHIEF ENGINEER, KMC
motijheel
Fixing of M.S. Grill work in Green Belt from Hameerpur Road to Kendranchal Coloney in Zone03
2026_NNKAN_1163863_1
255/UDYAN/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,490
1 Jul 2026
25 Jun 2026
25 Jun 2026
25 Jun 2026
25 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | - | cum | 170 | - |
| 2 | P/Laying 1:2:4 Cement, Co.Sand and 20mm stone grit etc all complete. | 6.5 | cum | 6,750 | ₹43,875 |
| 3 | Structural steel worik in single section, fixed with or without connecting plate, including cutting, hosting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | 90 | - |
| 4 | 12mm Cement Plaster of mix 1:4 Cement and Co.Sand etc all complete. | - | sqm | 182 | - |
| 5 | Providing and applying white cement based puttey of average thickness 1mm of approved brand and manufacture, over the plastered wall to prepare the surface even smooth complete. | - | sqm | 135 | - |
| 6 | painting on iron work with two coat with superior synthetic enamal including supply of all material etc all complete. | - | sqm | 71 | - |
| 7 | Add 18% G.S.T | 1 | tax | 1,50,239.52 | ₹1,50,239.52 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_2182017.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .