Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹28.8 L
EMD Value
₹57,600
Closing Date
18 Jan 2021, 4:00 pmClosed
ER. JOGINDER PAUL
The Executive Engineer, J and K, Sports Council, Const. Division Jammu.
Construction of playground Near Middle School (Eid Gha) at Gakhorte B by way of Earthwork in cutting/ filling and Construction of semi Pucca R/wall.
2021_SPORT_113292_2
E-26/26 OF 2020-21 Dt. 08-01-2021.
Open Tender
Civil Works
Item Rate
90 days
JAMMU
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Yes
Executive Engineer, JK State Sports Council
₹57,600
Yes
Executive Engineer, JK Sports Council Jammu
5 Feb 2021
8 Jan 2021
19 Jan 2021
8 Jan 2021
18 Jan 2021
9 Jan 2021
16 Jan 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, soil mixed with 70% ordinary soil & 30% soft rock.including disposal
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil including disposal
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all lead lift and carraige complete
Supply and Filling of good earth & stones for nearby including consolidation complete including cost of stone and all lead lift and carraige complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all lead lift and carraige complete
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Dry random rubble masonry with hard stone in superstructure Without bond stone including cost of stone and all lead lift and carraige complete
Dumping stone in Horizontal on level including cost & supply of stones including all lead lift and carraige complete
Note :- 1) Any Tropical error shall be consider as per sanction schedule of rates/ estimates.
ZAFFAR JAVAID
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .