Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -37.55% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance | -35.00% | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.7 CrAdmitted-Finance PEER TAKIYA KOKERNAG ANANTNAG | ANANTNAG | JAMMU AND KASHMIR | 192101 | -33.91% | ₹1.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.8 CrAdmitted-Finance | -29.00% | ₹1.8 Cr | L4 | Admitted-Finance |
| 5 | L5₹2.3 CrAdmitted-Finance | -9.99% | ₹2.3 Cr | L5 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹5.9 L
Closing Date
13 Apr 2026, 4:00 pmClosed
office of the ExEn Div Vailoo
office of the ExEn Div Vailoo
Brakpora Kanganhall Chittergul road KM 4 (by way of Construction/restoration of damaged spot)
2026_PWDJK_306414_1
ENIT125DivisionVailoo25-26
Open Tender
Civil Works
1095 days
vailoo
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,500
office of the ExEn Div Vailoo
₹5.9 L
Superintending Engineer PWD RnB Anantnag
11 May 2026
18 Mar 2026
15 Apr 2026
19 Mar 2026
13 Apr 2026
21 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cunnet Cutting of River bed upstream & Down Stream to make the flow of water smooth | - | cum | 0.8 | - |
| 2 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like by way of engagement of water pump of Capacity 4kl/hr | - | kl | 0.6 | - |
| 3Removing of existing crash barrier by way of engagement of labour | |||||
| 4 | Earth work in excavation in all kinds of soil by mechanical means in foundations,trenches, including dressing of sides and ramming of bottoms lift upto 1.5 m, including disposal of surplus soil as per the directions of engineer in charge complete. | - | cum | 0.6 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level in M-15 (1:2:4) grade with 20 mm nominal size of Crushed stone | 1 | cum | - | - |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 1 | cum | 0.2 | ₹0.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing, bases | - | sqm | 0.8 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing, bases (retaing walls any thickness) | - | sqm | 0.2 | - |
| 9 | Supply and filling of nallah stones in wire crates of GI 4mm dia 4"x4" including wrapping/tightening of wire crates and binding wire crates at top side incld, carriage of nallah stones (10km) and wire creates, complete | 0.4 | cum | 0.2 | ₹0.08 |
| 10 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete | 1 | sqm | 0.8 | ₹0.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
BOQ_994899.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid