| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.4 LAccepted-AOC 1 16 70 SAI NAGAR COLONY ALWAL SECUNDERABAD 500 015 | SECUNDERABAD | HYDERABAD | TELANGANA | 500015 | L1 | Accepted-AOC Being 1st lowest | |
| 2 | L2₹74.1 L+₹5.3 L (7.72%)Rejected-Finance | L2 | Rejected-Finance Being 2nd lowest | |
| 3 | L3₹75.0 L+₹6.2 L (9.04%)Rejected-Finance 702 A1 SHREE PRASAD TAWADEWADI SHREE DATTAGURU PARK KUMBHARWADA URAN DIST RAIGAD MAHARASHTRA 400 702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L3 | Rejected-Finance Being 3rd lowest | |
| 4 | L4₹83.1 L+₹14.3 L (20.8%)Rejected-Finance | L4 | Rejected-Finance Being 4th lowest | |
| 5 | Rejected-Technical HIMACHAL BUILDING SHOP NO 10 CD BARFYWALA ROAD JUHU LANE ANDHERI W MUMBAI 400058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | - | Rejected-Technical Due to not enlisted in appropriate category i.e. b(ii) |
Tender Value
₹75 L
EMD Value
₹1.4 L
Closing Date
3 Sept 2024, 6:00 pmClosed
CWE KARANJA
CWE KARANJA, NAVAL STN KARANJA,URAN, RAIGAD
ESSENTIAL REPAIR/ RENEWAL OF HT CTs 22 KV, INDOOR/ OUTDOOR BREAKERS, HT VCB AND REPAIR/ MAINTENANCE OF TRANSFORMER, DEHYDRATION/ FILTRATION OF TRANSFORMER OIL AND OTHER MISC WORKS AT NAVAL STATION KARANJA
2024_MES_663099_1
84334-K/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Station Karanja
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE NW KARANJA
₹1.4 L
16 Nov 2024
29 Jun 2024
6 Sept 2024
29 Jun 2024
3 Sept 2024
19 Jul 2024
Amount
Periodical Check / preventive maint of HT VCB 22 KV 800 Amps, 50 Hz 700 MVA during contract period 3 times as under :- (a) Checking the closing & opening operation of VCB and functional checks and Repair/ Replacement of the defective components. (b) Overhauling and Calibration of relays (secondary injection/Primary injection on each multiple setting of relays). (c) Setting and coordination of relays. (d) Checking and recording of IR value of VCB trolley and panel. (e) Checking/repairing/rectification of the control wiring. (f) Replacement of panel heater 80 watt. (g) Replacement of worn out bushing PT/Busbar support insulators (h) Replacement of worn out bushing PT/Busbar support insulators (j) Replacement of unserviceable and Open circuit CT's.
(k) Checking fiber plates, gaskets, transformer oil and applying multi grease to the mechanical parts & dry graphite conductive sealant to contacts of PT etc. & re-assembling the same and commissioning complete to entire satisfaction of Engineer-in-Charge. (l) Testing of polarities of CT's. (m) High voltage testing with high voltage tester of CT & Breaker pole to withstand working pressure of HT 22 KV to ascertain serviceability and spare parts found defective to be replaced for smooth functioning as directed by Engineer-in-Charge. (n) Labour only for Opening the busbar chamber of HT 22KV VCB panel board cleaning the bus bar chamber, inspect the CT's wiring, spout insulator & bus-bar joints & tightening if required & heating up with hot air blower to remove moisture, meggering, HV testing applying TRTPPEX(B) supplied against Sl Item No 4(b) here-in-after to bus bar & commissioning complete all as specified & directed by Engineer-in-charge. Note:- (i) All spares required for replacement shall be measured and paid separately under respective item of schedule here-in-after as supply only. (ii) Machine grease, oil, liquid sealant and any minor item costing upto Rs 250 will be included in the unit rate of above item and for satisfactory function of the breakers and no extra cost will be allowed. Decision of accepting officer in this regard will remain final & binding. (iii) The overhauling of HT breakers to be carried out either through OEM's service Engineer/authorised dealer/San & Engg consultant /Triotech consultant/ those who posses HT handling license.
Supply only following spare parts required for item No.1 here-in-before (Note:- the element of fixing of spare is already included in respective Sl Item No. 1 here-in-before) suitable for VCB of 800 Amps, 700 MVA all as per sample :- (a) Spout insulator (Epoxy)
(b) TRTPPX (B) for HT 22 KV for breaker
(c) Current Transformer 22 KV single phase indoor Resin cast CT Ratio 30-15/5-5 Amps Class 1.0 insulation level 28 KV/75 KV as per IS 2075
(d) Strip type heater 80 watt
(e) Closing coil
(f) Tripping coil
(g) PT Primary fuse 22 KV 23 Amps
(h) Control fuse 2 Amps with HRC fuse and fuse holder in existing panel and as specified and directed. Make:EE/Standard/Havells/L&T
(j) Insulation Tape suitable for HT 22 KV 1.5" wide. Make : 3M or equivalent.
(k) PT single phase indoor Resin cast PT Ratio 22kV/R3/110V/R3 Class 1.0, 200VA.
(l) Thermostat - 0-100 Deg. Celsius
(m) Upper fix contact
(n) Lower fix contact
(o) Top and bottom male contact
(p) Female contact
(q) Support insulator
(r) Partition fiber plate
(s) Copper strip of 800 Amps (per Kg)
Supply and fixing following spare parts required HT VCB/RMUs panel 630 Amp/800 Amp 22 KV,: (a) Current transformer resin cast single phase 22 kv- 200/100, 5-A, Class-1.0, SP-10 complete all as specified and as directed.
(b) Potential transformer ressin cast single phase 22 kv /R3/110v/R3, 200 VA, class-I complete all as specified and directed
(c) O/C & Earth fault relay with IDMT and inst characteristics MC 61 A Make : L&T 30 Volt DC complete all as specified and as directed.
(d) Master Trip relay 30v DC 3 NO + 1 NC Make:- Ashida, complete all as specified and as directed.
(f) Digital Amps meter class - 1.0, CTR ratio - 0 to 200/100-5-5A complete all as specified and as directed.
(g) Numerical O/C & E/F Relay 1/5A (miccom P 111) Make : Areva, complete all as specified and as directed.
(h) Supervision relay 924 volt DC, VAX31248071BM Model complete all as specified and as directed.
(j) ANNC 12 W facia Annunciator relay complete all as specified and as directed.
(k) Digital Trivector meter - PTR/CTR program (EM 6400) complete all as specified and directed.
(l) Breaker control switch 25 A non lockable Make: Kaycee complete all as specified and directed
(m) Local remote switch lockable Make: Kaycee complete all as specified and directed.
(n) TNC switch Make: Kaycee complete all as specified and directed
(o) Space Heater 100 watt Make: Eltec complete all as specified and directed
(p) Thermostat 30 to 100 Degree, Make: Girish complete all as specified and directed
(q) MCB 2 pole 10 A - 16 A, Make: Legrand complete all as specified and directed
(r) Limit Switch 1 NO+ 1 NC , 15 A 240 Volt , Make; Brisk complete all as specified and directed
(s) 22 KV HT insulator ressin cast for busbar support complete all as specified and directed
(t) 22 KV HT , PT Fuse Primary complete all as specified and directed
(u) HT insulation tape 3m Make complete all as specified and directed
(v) 22 KV Angle Boots complete all as specified and directed
(w) 22 KV HT slive, Make: 3m, Reycem complete all as specified and directed
(x) Indicator Lamp LED type Red, Yellow, Green, Blue, White, Amber, Clear complete all as specified and directed
(y) Current transformer terminal (CATD) Make: connectwell/Elmex complete all as specified and directed
(z) AC & DC Terminal (CST/CST10) 65 A, 415 Volt ,Make: Connectwell/Elmex complete all as specified and directed
(aa) Control Terminal (CST/CST 2.5) 36 A, 415 Volt, Make: Connectwell/Elmex complete all as specified and directed
(ab)Spring charging motor 230 V AC complete all as specified and directed
(ac) Load manager Digital 3 ph 4 wire , CL-I , CTR 200-100/5-5A, PTR- 22 KV/110V, Male: Conzerv EM 6400 complete all as specified and directed
Dismantling top cover alongwith conservator tank for filteration of Transformer oil and after draining out transformer oil up to terminal level in situ by dismantling copper bus bars HT/LV Bushing and earthing strips, replacement of LT/HT bushing and terminal rod of brass gasket, nuts, bolts & washers etc. Refitting top cover & conservator tank after cleaning and filtration, removing the sludge , reconnecting HT/LT cable/conductor and earthing strips,& filtration of transformer oil including toping up of transformer oil by adding new transformer oil having 60 KV dielectric strength and charging/testing the transformer on load complete all as directed by Engineer-in-charge, for transformer of rating upto 160 KVA capacity. Note : (i) Contractor should make his own arrangement of filtration plant at each transformer sites for filtration of transformer oil including provision of electric supply to the filtration plant. (ii) New transformer oil shall be measured and paid separately. (iii) Cost of HT/LT bushing and terminal rod wiil be measured and paid separately . (iv) Filtration of oil will be measured separately.
-Ditto - all as per srl item No.5 above but for transformer of rating 200 KVA.
-Ditto - all as per srl item No.5 above but for transformer of rating 250 KVA.
-Ditto - all as per srl item No.5 above but for transformer of rating 315 KVA.
-Ditto - all as per srl item No.5 above but for transformer of rating 400 KVA.
-Ditto - all as per srl item No.5 above but for transformer of rating 500 KVA.
-Ditto - all as per srl item No.5 above but for transformer of rating 630 KVA.
-Ditto - all as per srl item No. 5 above but for transformer of rating 1000 KVA.
Supply only the following spare parts of transformer 22 /0.433 KV operated in item no 5 To 12: a) HV Bushings i) 22 KV from up to 160 KVA
ii) 22 KV from 200 KVA to 630 KVA
iii) 22 KV 1000 KVA
b )HV terminal rod with nut bolts, caps etc i) 22 KV from up to 160 KVA
ii) 22 KV from 200 KVA to 630 KVA
iii) 22 KV 1000 KVA
c) LV Bushings i) 22 KV from up to 160 KVA
ii) 22 KV from 200 KVA to 630 KVA
iii) 22 KV 1000 KVA
d ) LV terminal rod with nut bolts, caps etc i) 22 KV from up to 160 KVA
ii) 22 KV from 200 KVA to 630 KVA
iii) 22 KV 1000 KVA
e ) LT Brass connectors i) 12 mm
iii) 30 mm
Supply and fix in repairs Dial type temperature gauge 100mm dia with dual calibration in degree Celsius and degree Fahrenheit, range 0 to 100 c and equivalent degree Fahrenheit complete with capability tube and sensor suitable for transformer of any rating as directed by Engineer-in-Charge
Supply and filling new transformer oil having 60 KV di-electric strength and conforming to IS for replacement or topping up to oil level mark at the conservator.
Material for rewinding of transformer core with same numbers/grade of copper enameled conductor with same size of turns as per manufactures' specification and testing and commissioning transformers after repair.
Material for reinsulation of copper windings (LT and HT), Class B, with Electrical Grade Insulating Kraft paper all confirming to IEC-60554-3-5 (1984).
Filtration of transformer oil, in situ, to achieve dielectric strength of the oil not less than 50 KV all as directed by Engineer-in-charge. Contractor will submit before & after testing report of transformer oil. Note :(i)Contractor will submit before & after testing report of transformer oil.
Disconnecting HT/LT and earth termination connections from transformer, taking down the transformers from plinth/platform and loading into the vehicle; transporting the same to workshop for carrying out necessary repairs and back ,reconnecting HT/LT connections at site and charging the transformer on load, commissioning and testing including meggar test at site all as directed by Engineer - in - Charge
Draining out transformer oil, dismantling top cover alongwith conservator tank, taking out core assembly after disconnecting connections, rewinding with same size and type of copper conductor and number of turns and insulating material such as paper insulator sleeves, heating etc. Putting back the core assembly into the tank after removing sludge and replacement of HT & LT bushing complete with brass terminal, refixing top cover and conservator including replacement of gasket, nut, bolts & washers (filling new transformer oil having 60 KV dielectric strength and carrying out type tests as per IS 2026 in presence of Engineer - in - charge for the following capacity :- a) 75 to 160 KVA Note : (i) New transformer oil and its filling shall be measured and paid separately under relevant items of schedule. (ii) Cost of rewinding material, insulation material and spares of transformer shall be measured and paid separately under relevant item of Sch . (iii) Replacement of spares will be on required basis all as directed by Engr-inCharge.
b) 200 to 315 KVA
c) 400 to 1000 KVA
Disconnecting HT/ LT and earth termination connections from Trolley Mounted Transformer (500 KVA Cap.) and towing the same to a location, within 5 KMs, as directed by Engr-in-Charge including Material and labour for making of HT/ LT and earth termination connections of the Trolley Mounted Transformer to the existing electric distribution system in Indoor/Outdoor Substation complete all as specified and directed by Engr-in-Charge. NOTE - (a). Trolley Mounted transformer will be issued to contractor by MES however Contractor has to make his own arrangements of towing vehicle. (b). The job also includes disconnecting of HT/ LT and earth termination connections of Trolley Mounted Transformer and towing the same to a location as directed by Engr-in-Charge.
Testing of transformers of various capacities installed at various locations at Naval Station Karanja by performing following tests - 1.IR Value on L.V & H.V side using 500 V & 5KV Megger respectively. Note : (i) Contractor should make his own arrangement of testing equipments and electric supply so required. (ii) A detailed Test Report should be submitted to Engr-in-Charge. 2.Ratio on all the taps. 3.Magnetic Balance tests on L.V & H.V. 4.Vector group. 5.Magnetizing current. 6.Winding Resistance Test on H.V & LV terminals.
Supply and fix in repairs heat shrink right angled boots for XLPE 22 KV 120 Sqmm cable including dismantling of HT cable from HT side of Transformer / HT Breakers.
Material and labour for Heat shrinkable cable end termination joint including jointing Kit outdoor type suitable for earthed 3 core 95/120 sqmm HT 22KV XLPE aluminium conductor cable and HV test after jointing and connecting up complete all as specified and directed. Make:- Raychem/ XICON/ M-Seal/Denson
Material and labour for Heat Shrinkable straight through jointing kit with all necessary jointing material suitable for HT 22 KV XLPE 3 core 95/120 sqmm aluminium conductor cable complete all as specified and directed. Make- Raychem/ XICON/ M-Seal/Denson
Supply and fix in repairs breather assembly with silica gel suitable in situ for transformer of any rating as directed by Engineer-in-Charge.
Supply and fixing CRC bottle spray of 500 ml for opening of rusty surfaces and rusty nut bolts all as specified and as directed by Engineer-in-Charge.
Taking out dry type transformer of capacity 63 KVA to 315 KVA to the workshop with necessary arrangements by giving the supply with trolley mounted transformer and refixing the same after the repairs.
Material and labour for preparation of old painted surfaces of 100 KVA transformer with scrapers, any number of coats, any width or girth and applying two coats of synthetic enamel paint by spray painted including writing 5mm/MES numbers complete all as specified and directed
-Ditto- all as per item No 39 above but 160 KVA transformer.
-Ditto- all as per item No 39 above but 200/250 KVA transformer
-Ditto- all as per item No 39 above but 315 KVA transformer
-Ditto- all as per item No 39 above but 400/500 KVA transformer
-Ditto- all as per item No 39 above but 630 KVA transformer
-Ditto- all as per item No 39 above but 1000 KVA transformer
Material and labour for cleaning and checking the LT/HT connections of dry type transformers and taking out the moisture from the cores of the transformer of capacity 62.5 kVA to 250 KVA all as specified and as directed by Engineer-in-charge
Material and labour for cleaning and checking the LT/HT connections of dry type transformers and taking out the moisture from the cores of the transformer of capacity 315 KVA to 750 KVA all as specified and as directed by Engineer-in-charge
Material and labour for arresting the leakage and checking out of the LT/HT connections from the transformers of capacity 75 KVA to 250 KVA all as specified and as directed by Engineer-in-charge
Material and labour for arresting the leakage and checking out of the LT/HT connections from the transformers of capacity 315 KVA to 500 KVA all as specified and as directed by Engineer-in-charge
Material and labour for arresting the leakage and checking out of the LT/HT connections from the transformers of capacity 625 KVA to 1000 KVA all as specified and as directed by Engineer-in-charge
Material and labour for earthing complete with GI earth plate electrode of size 60cm x 60cm x 6 mm thick buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below the normal ground level connected with GI strip 32 x 6mm by means of bolts, nuts, check nuts & washers of galvanished iron steel including necessary excavation and earth work in any type of soil, removing surplus soil to a distance not exc 50m, with and including PCC chamber in PCC (1:2:4), type B1,using (20mm graded stone aggregate),"mild steel angle iron frame" made out of MS angle iron of size 40x40x6mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with and including 6mm thick CI cover with handle, watering arrangement with funnel internally secured with wire mesh with 40mm dia medium grade pipe for watering 40mm dia light grade, GI pipe for lead protection in and including alternate layers of charcoal dust and common salt complete all as shown in electrical "plate No '3' and connected to earthing test point all as specified and indicated including testing on completion including retrieving old GI earth plate, CI cover, GI pipes, angle iron frame from existing earthing complete all as specified and directed.
Supply and fix earth continuity conductor or main earthing lead fixed to wall on batten or fixed to pole GI strip 32 x 6 mm all as specified and directed.
D.N.PATIL (BID ID -3073403)
Sagar Electricals (BID ID -3074889)
ELECTRO ASSOCIATES (BID ID -3074877)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .