Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC GROUND FLOOR GANGA APARTMENT KOTHABARI NEW BANSHBARI MALDA | 73 | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹44.4 L+₹22,882.56 (0.52%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹44.4 L+₹25,623.70 (0.58%)Rejected-Finance BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹89,200
Closing Date
12 Jul 2024, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Charges for Carrying of empty tonners from Different Gaseous Chlorination Plant under Malda Arsenic Area W/S Scheme (Northern and Southern Sector) and Balupur Water Supply Scheme to authorized chlorine filling station as per availability and returnin
2024_PHED_697152_1
WBPHED/EE/MLMD/NIeT_02 of 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹89,200
Yes
2 Sept 2024
25 Jun 2024
15 Jul 2024
25 Jun 2024
12 Jul 2024
25 Jun 2024
Amount
Charges for Carrying empty chlorine tonners (0.9 MT each) from Different Gaseous Chlrination Plant under Malda Arsenic Area W/S Scheme (Northern and Southern Sector) and Balupur Water Supply Scheme to authorised chlorine filling station including cost of loading, unloading and detention charges. (Single trip shall carry 2 to 3 nos. tonner and required filling of Toner is approx 80 nos)
Charges for filling of Liquid Chlorine in empty tonners (0.9 MT each) at authorised chlorine filling station.
Charges for Carrying back filled in liquid chlorine tonners 2 to 3 nos (0.9 MT each) from authorised chlorine filling station to Balupur Water Treatment Plant including cost of loading and unloading.
Testing of empty tonner before filling as per IS Standards if required. (Payment will be made on the basis of submission of testing report)
Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylinder cap and cylinder washer if requird including painting complete as per direction of EIC. (Payment will be made on the basis of submission of actual replacement report)
Add GST @ 18%
Add Cess @1%
EASTERN INDIA SALES AND SERVICE
NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .