Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC 24 EAST AVENUE BIDHAN NAGAR MIDNAPORE PASCHIM MEDINIPUR WEST BENGAL 721101 | MIDNAPORE | PASCHIM MEDINIPUR | WEST BENGAL | 721101 | ₹5.7 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹5.7 LRejected-Finance VILL RAMPUR P O ARUAR DIST PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | ₹5.7 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L2₹5.7 LRejected-Finance DAURADANGA BHATAR PURBA BARDHAMAN | BARDHAMAN | WEST BENGAL | 713364 | ₹5.7 L | L2 | Rejected-Finance L2 BIDDER |
| 4 | L3₹5.7 LRejected-Finance 61 KALI BAZAR AMTALA BURDWAN DIST PURBA BARDHAMAN | AMTALA | PURBA BARDHAMAN | WEST BENGAL | ₹5.7 L | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹5.7 L
EMD Value
₹11,463
Closing Date
16 Feb 2026, 3:00 pmClosed
EE DHWD
Office of the Executive Engineer Damodar Headworks Division DVC NEW COLONY DURGAPUR-2
Maintenance and repairing Inspection Path in between CH 0.00.00 to CH 28.00 DY-c / DBC Right BANK and strengthening Both Bank In Block Ausgram-II in Dist Purba Bardhaman under Guskara (I) Section of Guskara (I) Sub Division
2026_IWD_999228_19
WBIW/EE/DHWD/eNIT27/25-26/SL1
Open Tender
CIVIL WORKS
Aogram
Please refer Tender Document
6 documents required · 6 mandatory
₹11,463
Yes
14 Mar 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust torequisit thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm): Note: Add cost at site of 1.09 m3 of jhama metal and 0.26 m3 of moorum screening (loose volume) to arrive at the consolidated rate.
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_2447794.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid