Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
143 conditions · 1 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: (1) Construction of RUB in lieu of LC No 429 Km 840/1-3 between SZB-KMI of Raipur Division, (2) Provision of Dual MSDAC on Rusty Rail of DC Track Circuits at RVH, KMI, D-Cabin & BQR stations of Raipur Division.
SNT-R-2025-23~SECR
SNT-R-2025-23
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹6.1 L
5 Jan 2026
11 Dec 2025
22 Dec 2025
105 items across 5 schedules · ₹9,23,64,576.56 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench Depth 1.0 Mtr. & width 0.3 Mtr and clearing of roots of trees, bushes, ballast and reconditioning etc., including bailing out water and disposal of extra soil in all soils including soft rocky area. | Kilometre | 8.50 | 76,590 | 6,51,015 |
| 2 | Excavation of trench in all kinds of soils including softrockyarea and clearing of roots of trees, bushes, rocks,ballastetc., to a depth of 1 Mtr. & width 0.3M for track/puccaroad/Platform crossing/ level crossing and any other placeasadvised by the Engineer-incharge includingsupply,transportation and laying of RCC pipe with collars(forjointing pipe) 150mm nominal dia to Spec.No:IS-458intrench and drawing of Signalling/ Power/ Quadcablesthrough pipe including back filling and ramming aftercablelaying as specified in Technical Circular No.2 of1988issued by CSTE/S.E.Rly. This includes repairingandplastering of platform/pucca road after cable laying.RCCpipe shall be inspected by the Rep.of Sr. DSTE /Rbeforelaying. NOTE:- Power cable,signalling cable, Quadcable asmentioned above,where required shall be laid in thesame trench as signalling cable but in a separate pipe. | Metre | 450.00 | 1,008.8 | 4,53,960 |
| 3 | Laying and Fixing of galvanised iron pipe (GI Pipe) withthreadedcollars (for jointing pipe) of 80 mm nominal diaSpec.No.IS-1239medium grade, on bridges, culverts, drainsincluding supply andtransportation of GI pipes and all othermaterials required forfixing the pipe to Drg.No.Con/SK/T/2and drawing ofSignal/Power/Quad cables inside the pipewith masonary worksover the entire length of the bridge andat entry and exit of theculvert and curing for 72 hrs, drillingof holes on the pipe at 10 cmapart to be clamped 2 Mtrsapart on culvert, for the Signalling,quad, power cable. | Metre | 265.00 | 761 | 2,01,665 |
| 4 | Excavation of trench and clearing of roots of trees, bushes,ballastand reconditioning etc., including bailing out waterand disposal ofextra soil in Hard rocky area includingconcreting. Chase cuttingand smoothening of inside surfaceof sizes 0.08 m deep and 0.17m width at platform andcemented floor area. | Metre | 275.00 | 115 | 31,625 |
| 5 | Excavation of trenches including clearing of roots oftreesetc. in hard rocky soil by chiseling up to a depth of0.5m to0.8 Mtr. At the bottom, supply and placing half roundRCCpipe on sieved soil of 30 mm over cable andconcretingthroughout the lenght upto a layerof 75 mmapproximately(1:2:4) , as advised by the site engineer &Guide lines onSignalling cable Laying issued by SignalDirectorateResearch,Design & Standards organisationMinistry ofRailways Manak Nagar Lucknow- 226011,Version- 1.0,Effective from dt 31.10.2011 . Thendigging and backfillingthe trench by digging and carryingearth from a lead ofmaximum 30Mtrs and then ramming thesoil after cablelaying. This includes supply of half round RCCpipe. | Metre | 1100.00 | 372 | 4,09,200 |
| 6 | Excavation of trench and clearing of roots of trees, bushes,ballastand reconditioning etc., including bailing out waterand disposal ofextra soil. Track crossing, Road Crossing bypushing method(HDD method) at culverts/ track / puccaroad crossing at a depthnot less than 1 meter with referenceto bottom of rail/road surfaceincluding supply of GI pipe with76 mm dia, Spec. No. - 1239medium grade (for the length ofpushing more than 05 meters). | Metre | 990.00 | 2,246 | 22,23,540 |
| 7 | Fixing of concrete cable route marker at 30- 40 meter andatdiversion point including supply & transportation ofcableroute marker at site. Detail size & fixing of cableroute marker should be followed as per drawing no.SDO/Cablelaying/020. | Numbers | 80.00 | 415 | 33,200 |
| 8 | Laying of Signalling Cable/Power/Quad cable / PIJF cableinthe excavated trench toDrg.No:CON/SK/T/5.Transportation,supply of 'U' clampsand anchoring of cable at every 10 Mtrswith 'U' clamp toDrg.No:CSTE/C/Cable/81 including backfilling withexcavated earth and ramming of trenches aftercablelaying. Note: The contractor has to conduct detailedsitesurvey of the cable route, prepare a plan to get approvalofthe Railway, putting white lime powder markingbeforeexcavation of earth under supervision ofrailways authorised representative. | Kilometre | 42.00 | 16,740 | 7,03,080 |
| 9 | The excavation of pit, casting of concrete foundationincludingsurrounding earthwork along the foundation,erection, installationand wiring of steel appartus case, fixingof terninals, fuse blocks,signal transformer, currenttransformer, filament switching unit,track battery chargers,adjustable/fixed resistances, choke coils,Fuses, Relays, Etype locks , termination of cables, cableinsertion, wiring todraw 110V AC therefore in the new apparatuscase asrequired, testing, commissioning includingsubsequentalterations (if required), bunching of cables,earthing of cable,armours etc. Painting of the apparatuscase inside and outsideafter clearing the surface thoroughlyand first coating of anti -corrosive paint and subsequent twocoatings of Alluminium paintoutside and Red Oxide insideand lettering. 18 mm Hylum sheetfor location box shelf and12 mm for cable termination in locationbox.Steel appartus case (Large) to Drg.No. CON/SK/T/8 with 4Nos. of foundation bolts 20mm x 460mm to Drg.No. SA- 112 A/M or latest. | Numbers | 49.00 | 17,067 | 8,36,283 |
| 10 | Alteration/ Modifications in the existing location boxes, fixingofequipments, cable insertion, termination, wiring, testing&commissioning, two coat painting, lettering to suit thecircuits asper approved wiring diagrams. This includes fillingwith sand and plastering the same. | Numbers | 37.00 | 2,548 | 94,276 |
| 11 | Transportation & Execution of following kinds of joints on Quad Cable using thermoshrink jointing kit. This also includes excavation of cable joint pit of size 1.2m x 1.2m x 1.0m in all types of soil for jointing of copper cables, back filling and ramming after jointing. (b) straight through joint on Quad cable/10-20-50 pairs PIJF Cable. | Numbers | 67.00 | 1,385 | 92,795 |
| 12 | Installation, testing and commissioning of Permanent andMaintenance Free Earth pits.Installation charges : Earthpit(1 Set) It includes: (1) Civil works related to earth pitdigging, PMF earth pit installation,,backfilling and chamber making, (2) Materials for chamber including Chamber Cover. | Numbers | 29.00 | 5,882 | 1,70,578 |
| 13 | Excavation of earth pit, transportation, placing and fixing ofearth electrode with construction of cement encloser toDrg.No.CON/SK/T/9 and CON/SK/T/9A and drawal of GIwire wrapped on MS strip (35 x 6 mm) from earth electrodeto all signalling equipments, including fixing and soldering oflugs at both end of the wire. | Each | 57.00 | 1,941 | 1,10,637 |
| 14 | Modification of existing Hitachi Make EI of Automatic Signaling for closure of LC gate no. 429 at Kumhari Station. This includes: (i) Redesign of EI Systems with related application logic & interface circuit. (ii) Factory Acceptance Test (FAT) - (This includes one round of IFAT & one round of CFAT). Testing & Commissioning support. (iii) Installation of Modified Program & proposed changes as per approved Signaling Plan. (iv) Supply of Document (It shall be supplied in CD with one set of Application Logic Circuit & Interface Circuit in A3 size only) | Job | 1.00 | 33,63,000 | 33,63,000 |
| 15 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers | 31.00 | 19,785 | 6,13,335 |
| 16 | Execution to be made by the contractor in Autocad as perfollowing :-1. SECRailwayPractice in conformity with GR,SR& SEM. 2 . As per latest typicalcircuit diagram andguidelinesof SEC railway. Design &Preparation ofCircuits and drawingsDesign,Preparation & checking of documents and Circuit diagram and drawings(a) Design and development of Circuit Diagram in size B(A3) as per SEM sheet including contact analysis. | Sheet | 220.00 | 1,004 | 2,20,880 |
| 17 | Q-series/Composite Relay Racks and cable termination racks (New).NOTE: Payment can be released in a part for the above said work after completion of- (i) Erection- 15%,(ii) Wiring, testing, painting, earthing & writings etc - 75% , (iii)Commissioning of Relay rack/Composite rack/CTR- 10% of Schedule rate. | Numbers | 10.00 | 48,363 | 4,83,630 |
| 18 | Installation of retro reflective signal/shunt signal enameled number legend board. | Each | 7.00 | 77 | 539 |
| 19 | Design & Preparation of SWR & GWR in English & Hindi for execution to be made by the contractor as per SECRly practice in conformity with GR, SR & SEM provisions and in accordance with CSTE/OL/GRC's circular No.3 of 1984 with the latest alterations & amendments based on IP (tentative/approved) (to be supplied by the Rlys). | Numbers | 7.00 | 8,197.6 | 57,383.2 |
| 20 | Transportation of released materials from site to the stores ofSSE(Sig/Tele)/R or BIA or BYT or DRZ or to GSD. This includesloading, unloading and stacking of materials. | Per Trip | 3.00 | 3,661.1 | 10,983.3 |
| 21 | Excavation & casting of pedestal foundation for left/right hand boom of lifting barriers. | Each | 2.00 | 9,427 | 18,854 |
| 22 | Excavation & casting of foundation for stop post. | Each | 2.00 | 1,453 | 2,906 |
| 23 | Erection and commissioning of Lifting Barrier assembly complete including boom support, positive boom locking device, Emergency crankhandle attechment, Timer unit to adjust the time for operating the barrier, Fixing of Hooters/Flashers on either side of gate barriers, 1 (one) controlpanel, weather proof painting, lettering, Neccessary MS weight for balancing the booms, etc. | Set | 1.00 | 17,912 | 17,912 |
| 24 | Installation, testing and commissioning of sliding boom LC gates complete which includes casting of concrete foundation including surroundingearthwork along the foundation (Dia-30 cm & depth-100 cm total ten numbers per gate), fixing and welding of channel, fixing of clamps, cutting ofrail post, fixing of lock post with two numbers excavation of Pit casting of concrete foundation for type foundation per gate, laying of cable forroad crossing and fixing of MS plate/channel also as requirement of the site condition. | Set | 1.00 | 37,853 | 37,853 |
| 25 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below. | cum | 10.00 | 2,943 | 29,430 |
| 26 | Supply and fixing of PVC casing caping 25mm x 25mm size for indoor wiring. This includes drawal of wires in the casing caping and termination of wire at end point. The work should be carried out as per the instruction of Railway site Engineer. | Metre | 30.00 | 43 | 1,290 |
| 27 | Installation, cable termination, testing and commissioning of 10/20/50 Pair CT Boxes. | Numbers | 12.00 | 786 | 9,432 |
| 28 | Installation and Fixing of "E" type lock along with Welding Work . | Number- Month | 6.00 | 704 | 4,224 |
| 29 | Installation, cable termination, wiring,testing of magneto telephones. | Number- Month | 8.00 | 999 | 7,992 |
| 30 | Installation and wiring of Rotary key transmitters/KLCR on teak wood board enclosed inside asuitable box with front transparent check cover with locking arrangement. This includes 3/4" thick teak woodboards, transparent sheet for box, locking arrangement. 2 nos.of locks for box and 1 No. lock for front transparent sheet. | Numbers | 4.00 | 507 | 2,028 |
| 31 | Installation of signal posts for Multiple Aspect Colour LightSignals complete with signal units, bases, LED unit, fixingand wiring of current transformers of LED units, ladders &other fittings, excavation of pit, casting of cement concretefoundations with necessary water outlets, erection andfixing of complete fittings of the signal/signal post withnecessary earthed screen protection arrangement,including drawing of cable through signal posts,termination of cables, wiring, testing and commissioning,two coat painting and lettering, supply and fixing of speedboards if required for the following:- NOTE:- Thefoundation for Multiple Aspect Colour Light Signal Postdrg. No. Con/SK/T/12 and and the foundation bolts shallbe of sizes 24 mm x 915 mm to Drg. No. SA- 116A/M andbolts for each foundation for above shall be of size 20 mmx 305 mm to Drg. No. SA- 110A/M ( 4 nos. for each) withtwo nuts and two washers each per bolt. (a) 3 ASPECT/4ASPECT | Numbers | 7.00 | 19,551 | 1,36,857 |
| 32 | Transportation, fixing & commissioning of different type ofDominos complete with button assemblies and indication tosuit the modification of the existing operation cum indication panel. | Numbers | 20.00 | 565.4 | 11,308 |
| 33 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design and development of Route Control Chart (RCC) in size B(A3) as per SEM. | Numbers | 50.00 | 1,004 | 50,200 |
| 34 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design & development of Track bonding plan in size U(A3) as per SEM. | Station | 1.00 | 1,256 | 1,256 |
| 35 | Dismantling of Relay racks with all fittings, battery racks complete, Equipment rack complete, SM's slide and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 5.00 | 360 | 1,800 |
| 36 | Supply, Transportation, fabrication and fixing of Hylum sheet of 12 mm thickness as per site requirement. | Sqm | 1.00 | 2,525 | 2,525 |
| 37 | Transportation, installation of optical fibre joint closure and splicing of Optical fibre cable (2 x 24 fibres) and testing, Optical fibre cable splicing shall be done in the presence of Railway's representative. Only joint closure shall issued by the Railway. All other tools/test equipments required shall be arranged by the Contractor. This also includes excavation of earth for construction of masonary pit of bricks (inside complete plastered), the inner size of pit 1.2m x 1.2m (depth 0.75m) in all types of soils for keeping cable coils at the location of OFC joints, filling the pit with sand after jointing of cables, ramming and covering with RCC slab as per Drg. and instructions of site incharge of Railway. | Numbers | 2.00 | 19,019 | 38,038 |
| 38 | Transportation including loading/unloading of HDPE pipe from the stores of railway to the work site, laying of the same in excavated trench/already laid GI/RCC pipes/tubes, jointing, levelling and end sealing the pipes. | Kilometre | 1.00 | 7,762 | 7,762 |
| 39 | Transportation, loading/unloading of OFC from the stores of railway to the work site with care, pushing/pulling OFC through the HDPE pipes, sealing of the duct by sealling /caps plugs. The cable is to be laid by mechanised means. At inaccessible places where mechanised laying is not possible, the cable is to be laid manually. This also includes testing of cable drums in the store premises before transportation and submissions of results thereof. Empty cable drums to be returned by the contractor. The cable drums with unused cable at site to be returned by the contractor to the stores depot of Consignee. | Kilometre | 1.00 | 18,672 | 18,672 |
| 40 | Dismantling of Signal Foundation(upto ground level by hydraulic breaker). | Numbers | 12.00 | 2,174 | 26,088 |
| 41 | Dismantling of Lifting barrier complete and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 2.00 | 3,623 | 7,246 |
| 42 | Dismantling of operation cum indication panel and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 2.00 | 2,415 | 4,830 |
| 43 | Dismantling of Signal posts/BSLB/SLB/Stop Board and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 14.00 | 232 | 3,248 |
| 44 | Dismantling of Steel apparatus case with fittings and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 14.00 | 232 | 3,248 |
| 45 | Dismantling of Emergency sliding barrier and stacking asper instruction of Rep.of Sr.DSTE/R. Note- Unit Numbers stands for Sets. | Set | 2.00 | 3,556.8 | 7,113.6 |
| 46 | Dismantling of Location Foundation(By hydraulic breaker). | Numbers | 10.00 | 1,087 | 10,870 |
| Schedule total | ₹1,12,24,587.1 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .