| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAdmitted-Finance | ₹8.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.5 CrAdmitted-Finance | ₹9.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹15.7 CrAdmitted-Finance | ₹15.7 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Acceptable |
| Sl No | Description | Qty | Unit | AKSH INFRASPACE PVT LTD L3 | G L GOLDEN L1 | RUDRA GAS ENTERPRISE PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.00SECTION-A : PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES) | ||||||
| 2.00Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes, bare pipes along with associated fittings and valves from Owner's designated stock-yard to Contractor's stock-yard / workshop / work-site including preliminary activities, preparation of drawings, wherever required for crossing, etc. including handling, stacking, stringing on the pipeline Right-of-Use(ROU) /Right -of- Way (ROW)/ pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,Barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner-supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works: | ||||||
| 3.00Including marking the route map, alignment sheet, etc. drawings showing survey details, and submit same to Owner for review. | ||||||
| 4.00Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination and liasioning with concerned authorities and obtaining NOCs from these authorities post completion of work. | ||||||
| 5.00Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc by excavation in all types of soils (including soft/hard rock), including controlled blasting, chiseling or otherwise cutting etc.; providing depth of padding (Soft soil or sand) /rock shield (as directed by EIC) in trench bed & above and around the pipeline HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; [The minimum depth of the top of pipeline shall be 1.2m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OISD - 141 OISD - 226]. Dewater of trenches if required as per site condition. | ||||||
| 6.00Carrying out repairs of pipe defects / replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation / handling. | ||||||
| 7.00Stringing of line pipes along ROU/ROW including providing straw / sand / soft soil bags, soft padding / sand padding/(Rocksheild for rocky area). | ||||||
| 8.00Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-Ray (in case of space constrant & small work by Gamma Ray on Owner's approval) as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other tests as required on repaired joints, etc. as mentioned in SCC and particular job specifications. | ||||||
| 9.00Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (except at HDD / Boring cased crossings which is covered separately elsewhere in this SOR). | ||||||
| 10.00Coating of all weld joints, long radius bends, etc. | ||||||
Tender Value
Refer Docs
EMD Value
₹11.3 L
Closing Date
23 Apr 2026, 2:00 pmClosed
Sandip Sahoo(Manager CnP)
Noida
LAYING OF STEEL PIPELINE AND ASSOCIATED FACILITIES FOR LAST MILE CONNECTIVITY TO M/S JAYASWAL NECO INDUSTRIES LIMITED (JNIL), SILTARA, CHHATTISGARH
2026_GAIL_274031_1
GAIL/NOIDA/CnP/PROJ/JNIL/25-92
Limited
Oil/Gas
210 days
NOIDA
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹11.3 L
Yes
Through VC
8 May 2026
9 Apr 2026
24 Apr 2026
9 Apr 2026
23 Apr 2026
14 Apr 2026
14 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION-A : PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES) | - | - | - | - |
| 2 | Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes, bare pipes along with associated fittings and valves from Owner's designated stock-yard to Contractor's stock-yard / workshop / work-site including preliminary activities, preparation of drawings, wherever required for crossing, etc. including handling, stacking, stringing on the pipeline Right-of-Use(ROU) /Right -of- Way (ROW)/ pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,Barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner-supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works: | - | - | - | - |
| 3 | Including marking the route map, alignment sheet, etc. drawings showing survey details, and submit same to Owner for review. | - | - | - | - |
| 4 | Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination and liasioning with concerned authorities and obtaining NOCs from these authorities post completion of work. | - | - | - | - |
| 5 | Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc by excavation in all types of soils (including soft/hard rock), including controlled blasting, chiseling or otherwise cutting etc.; providing depth of padding (Soft soil or sand) /rock shield (as directed by EIC) in trench bed & above and around the pipeline HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; [The minimum depth of the top of pipeline shall be 1.2m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OISD - 141 OISD - 226]. Dewater of trenches if required as per site condition. | - | - | - | - |
| 6 | Carrying out repairs of pipe defects / replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation / handling. | - | - | - | - |
| 7 | Stringing of line pipes along ROU/ROW including providing straw / sand / soft soil bags, soft padding / sand padding/(Rocksheild for rocky area). | - | - | - | - |
| 8 | Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-Ray (in case of space constrant & small work by Gamma Ray on Owner's approval) as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other tests as required on repaired joints, etc. as mentioned in SCC and particular job specifications. | - | - | - | - |
| 9 | Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (except at HDD / Boring cased crossings which is covered separately elsewhere in this SOR). | - | - | - | - |
| 10 | Coating of all weld joints, long radius bends, etc. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TV2.pdf
Tender Documents • 15.37 MB
TV1.pdf
Tender Documents • 17.44 MB
finaltender.pdf
Tender Documents • 9.00 MB
BOQ_320280.xls
BOQ • 0.70 MB
clarification.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid