Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC BILASPUR | ₹5.2 L | L1 | Accepted-AOC Lower Quoted rates |
| 2 | L2₹5.3 LRejected-Finance IND AREA ROAD TAHLIWALA TEH HAROLI DISTT UNA H P | TAHLIWALA | UNA | HIMACHAL PRADESH | ₹5.3 L | L2 | Rejected-Finance Higher Quoted Rates |
| 3 | L3₹5.5 LRejected-Finance BILASPUR | ₹5.5 L | L3 | Rejected-Finance Higher Quoted Rates |
Updated dates
Tender Value
₹5.0 L
EMD Value
₹4,980
Closing Date
21 Feb 2026, 9:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer electrical Division HPSEBL Gagret
Tender for prov. and erection/ permanent restoration of vulnerable points of temporarily restored DTRs and HT and LT line due to natural calamity at village Deoli at Chather, Gagret Section I and II under ESD Gagret.
2026_HPSEB_128546_1
GED-187/2025-26
Open Tender
Electrical Works
30 days
Gagret
Please refer Tender Document
2 documents required · 2 mandatory
₹590
Yes
₹4,980
Yes
2 Apr 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
Erection Part of R/M of 11 KV HT Line
Erection of new Steel Tubular Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Re-Erection of Tilted Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Re-Stringing and Re-sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81 (80 mm2) Conductor of 11 KV HT line complete in all respect.
Dismentalling of existing HT conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part R/M of 3-Phase LT Line
Erection of LT line:-Digging of pit of stay, Erection of PCC Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Re-Erection of Tilted LT line Pole:-Digging of pit of stay, Erection of STP/PCC Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of LT line:-Digging of pit of stay, Erection of Steel Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming, painting of Poles etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (3-Phase L.T Line).
Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (1-Phase L.T Line)
Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Supply Part Part of R/M of 11 KV HT Line
Prov. Steel Tubular Poles 11 Mtr Long along with base plate complete in all respect (1 Nos Supply by HPSEBL)
Prov. RCC Muff with concrete filling
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure (3 Nos Supply by HPSEBL)
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (10 kg. per Stay Set) (10 Kg Supply by HPSEBL)
Prov.11kv Earthing set complete in all respect.
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (0.350 Kg Supply by HPSEBL)
Prov. Aluminium Paint.
Prov. Red Oxide
Supply Part of R/M of 3-Phase LT Line
Prov. PCC Pole 8 mtr.long complete in all respect. (2 Nos Supply by HPSEBL)
Prov. Steel Tubular Poles 9 Mtr Long along with base plate complete in all respect (1 Nos Supply by HPSEBL)
Prov. RCC Muff with concrete filling
Prov. Shackle Insulator (16 Kn)
Prov. D-Iron (U-Clamps)
Prov. Earth Knob
Prov. LT Stay Set (i/c Stay clamp)
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set (18 Kg Nos Supply by HPSEBL)
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (1.05 Kg Supply by HPSEBL)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (6 Nos Supply by HPSEBL)
Prov. Aluminium Paint.
Prov. Red Oxide
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
B.rar
Tender Documents • 0.48 MB
Spc.pdf
Additional Documents • 6.24 MB
BOQ_189987.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid