| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC M NO 375 VIDYANAGAR HARTHALA SONAKPUR MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | ₹3.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹3.7 LRejected-AOC | ₹3.7 L | L2 | Rejected-AOC rejected |
| 3 | L3₹3.8 LRejected-AOC | ₹3.8 L | L3 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | M/S TEJPAL SINGH CONTRACTOR L3 | M/S MALIK CONSTRUCTION L1 | RAM GOPAL THEKEDAR L2 |
|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.01 | Dismantling brick or stone masonry in lime or cement i/c. stacking within 60 M distance i/c. labour, T&P etc. completion. | 28.02 | M³ | 390 ₹10,927.80 | 332 ₹9,302.64 | 390 ₹10,927.80 |
| 1.02 | Dismantling R.B .OR R.C.C. work i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete. | 2.31 | M³ | 492 ₹1,136.52 | 503 ₹1,161.93 | 592 ₹1,367.52 |
| 1.03 | Earth work in foundation in dry soil (loam clay or sand) including lift upto 1.50 M and lead upto 30 M including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer-in -in-charge up to a distance of 30 M from the foundation treanches. | 20.38 | M³ | 132 ₹2,690.16 | 132 ₹2,690.16 | 132 ₹2,690.16 |
| 1.04 | Laying C.C. 1:3:6 using size (22.4-53) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. | 9.57 | M³ | 4,615 ₹44,165.55 | 3,923 ₹37,543.11 | 4,616 ₹44,175.12 |
| 1.05 | Providing and laying M-105 & above brick work with 1:4 cement mortar using cement amd Coarse sand inclduing cost of all materials, labour, T&P etc. | 30.99 | M³ | 5,277 ₹1.6 L | 4,485 ₹1.4 L | 5,277 ₹1.6 L |
| 1.06 | B/W in 1:4 C.M. with coarse sand Excluding cost of Brick but including cost of all material, labour, T&P etc. complete. | 4.2 | M³ | 2,089 ₹8,773.80 | 1,775 ₹7,455 | 2,089 ₹8,773.80 |
| 1.07 | Providing and laying Ordinary Centering & Shuttering of Ply wood or steel for R.C.C. work including all cost of material, T&P and labour etc. | 18.09 | M² | 822 ₹14,869.98 | 700 ₹12,663 | 822 ₹14,869.98 |
| 1.08 | Supplying and fixing Steel reinforcement including Bending, Binding, Cutting and placing of reinforcement including cost of binding wire but excluding cost of steel etc. complete. | 0.35 | M.T | 72,356 ₹25,324.60 | 61,502 ₹21,525.70 | 72,356 ₹25,324.60 |
| 1.09 | Laying R.C.C. 1:1.5:3 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. | 4.84 | M³ | 6,000 ₹29,040 | 5,142 ₹24,887.28 | 6,050 ₹29,282 |
Tender Value
₹4.2 L
EMD Value
₹9,000
Closing Date
13 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT 22 Repair of VRB at Km 0.150 of Budhanpur Mr. In distt. Moradabad for the Year 2025-26
2025_UPIDC_1086669_51
04/EEAID/2025-26
Open Tender
Civil Works
60 days
MORADABAD
AS PER NIT
2 documents required · 2 mandatory
₹177
₹9,000
25 Dec 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling brick or stone masonry in lime or cement i/c. stacking within 60 M distance i/c. labour, T&P etc. completion.
Dismantling R.B .OR R.C.C. work i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete.
Earth work in foundation in dry soil (loam clay or sand) including lift upto 1.50 M and lead upto 30 M including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer-in -in-charge up to a distance of 30 M from the foundation treanches.
Laying C.C. 1:3:6 using size (22.4-53) mm graded crushed aggregate i/c all cost materials, labour, T&P etc.
Providing and laying M-105 & above brick work with 1:4 cement mortar using cement amd Coarse sand inclduing cost of all materials, labour, T&P etc.
B/W in 1:4 C.M. with coarse sand Excluding cost of Brick but including cost of all material, labour, T&P etc. complete.
Providing and laying Ordinary Centering & Shuttering of Ply wood or steel for R.C.C. work including all cost of material, T&P and labour etc.
Supplying and fixing Steel reinforcement including Bending, Binding, Cutting and placing of reinforcement including cost of binding wire but excluding cost of steel etc. complete.
Laying R.C.C. 1:1.5:3 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc.
Laying C.C. 1:2:4 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc.
Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P and labour Complete.
Providing and applying snowcem washing in two coat i/c cost of all material, T&P & labour etc. complete.
Letter writing up to 10 cm Height including prepaition of base with Plaster ,primer two coat enamel paint of 0.80 m x 0.60 m including all cost material, labour and T&P etc required for proper completion of work
Laying and fixing R.C.C. (1:1.5:3) Wheel guard stone including all cost of materials, T&P and labour etc.
Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of regular pits and earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including 1.50meter lift and 1 Km lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as per direction of Engineer-in-charge.
RAM GOPAL THEKEDAR (BID ID -5671070)
M/S TEJPAL SINGH CONTRACTOR (BID ID -5671057)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1999285.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid