| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.1 LAccepted-AOC NO 50 104 JAYALAKASHMAI COMPLEX 1ST FLOOR PERIYAPALAYAM ROAD JANAPANCHATRAM CHENNAI 600 067 | CHENNAI | THIRUVALLUR | TAMIL NADU | 600067 | L1 | Accepted-AOC L1 | |
| 2 | L2₹49.3 L+₹2.2 L (4.61%)Rejected-AOC NO 8 NARAYANA SAMY AVENUE KAVARAPALAYAM THIRUNINDRAVUR | KANCHIPURAM | TAMIL NADU | 600069 | L2 | Rejected-AOC L2 |
Tender Value
₹47.7 L
EMD Value
₹48,000
Closing Date
28 Jun 2024, 3:00 pmClosed
Additional Collector(Dev)/Project officer
DRDA Tiruvallur
Strengthening of BT road from TS road to Sriramakuppam road at Katchur Panchayat in poondi Block pac.163
2024_RDTN_453535_1
Rc. No. 722/2024/A7 Dt. 10.06.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Poondi Block
Class III and above
5 documents required · 5 mandatory
₹0
₹48,000
Yes
DRDA Tiruvallur
6 Aug 2024
12 Jun 2024
28 Jun 2024
12 Jun 2024
28 Jun 2024
14 Jun 2024
14 Jun 2024
Amount
1.STRENGTHENING OF BT ROAD FROM TS ROAD TO SRIRAMAKUPPAM ROAD AT KATCHUR PANCHAYAT KM 0/0 - 1/08 R 26 ( PUR )
Clearing and removing the Scrub Jungle removing away from the site including incidental and all labour charges with burning to ashes including cost of all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing BT Surface to an average thickness of 25mm using 13.20mm IRC HBG Metal with 44 kg of Bitumen for 1.00 Cum of metal mixed in hot mix plant laying at site etc KM 0/0 - 1/0
Advance patch work for making up the undulation in the existing BT Surface to an average thickness of 25mm using 13.20mm IRC HBG Metal with 44 kg of Bitumen for 1.00 Cum of metal mixed in hot mix plant laying at site etc KM 1/0 - 1/08
Applying TACKCOAT over BT surface (not treated with primer) at 3.00 Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACKCOAT over BT surface (not treated with primer) at 2.50 Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Bituminous conctrete 25,30/40mm Thick using cmp (Grade-II) providing and laying Bituminous concrete to 40mm thick using grades of metal etc. using 0.13 cum of 19.00 -9.50 mm, 0.17 cum of 9.5 - 2.36 and below with 50.3 kgsof VG 30 / VG40 heating the bitumen and aggregrates to required timperature and mixing them in required in central hot mix plan 20 - 30 ton capacity carrying the mix by tipper trucks to paver site ,spreading the mim to unifor thickness with mechanical paver to the specified grades and cross sections and consolidated by 8 - 10 ton power roller to the required density etc all other tools and plans required, including fuel an all other incidental charges etc., complete as per specification ausijng CMP clauses 507 Morth Part 5.
Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site and labour charges as per standard sepcifications KM 0/0 - 1/0
Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site and labour charges as per standard sepcifications 1/0 - 1/08
Provision for HM Stone Charges etc,..
Provision for KM Stone Charges etc,..
Provision for sign board
Provision for White border line
Provision for Name Board
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. SBR CONSTRUCTION (BID ID -1068161)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .