Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 CrAccepted-AOC 1313 SADASHIV ETH OPP BHARAT NATY MANDIR PUNE 411030 | PUNE | PUNE | MAHARASHTRA | 411030 | ₹29.9 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2Rejected-Finance | - | L2 | Rejected-Finance High Rate |
| 3 | L3Rejected-Finance | - | L3 | Rejected-Finance High Rate |
Tender Value
₹29.9 Cr
EMD Value
₹3.3 L
Closing Date
20 Mar 2023, 2:00 pmClosed
MD.HBPCL
Managing Director,(Purchase Cell), Haffkine Biopharmaceutical Corporation Ltd,Acharya Donde Marg, Parel Mumbai
E-5002/HBPCL/PC/EQU/ Modular Operation Theatres and Recovery room with Turn Key Project /2022-23
2023_HBPCL_871497_1
E-5002HBPCL/PC/EQU/ Modular Operation Theatres and
Open Tender
Medical Equipments/Waste
120 days
Haffkine Biopharmaceutical Corporation Ltd, Acharya
Please refer Tender documents.
2 documents required · 2 mandatory
₹32,500
Yes
₹3.3 L
Yes
Haffkine Biopharmaceutical Corporation Ltd,Acharya
8 Nov 2023
10 Feb 2023
22 Mar 2023
10 Feb 2023
20 Mar 2023
10 Feb 2023
17 Feb 2023
Name of the Item :
Part 1: Modular Construction Wall & Ceiling system in Operation Theatre & Trauma unit complex
Part 1: Modular Construction Flooring
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Laminar Air Flow (LAF) Ceiling
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Air Exhaust shaft / box as per technical specifications as per technical specifications and BOQ
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Over Flow Port as per technical specifications and BOQ.
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of illumination lights in each area of the OTs
Part 1: Modular Construction Hospital Doors
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of 15” Touch Screen OT Control panel
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of built-in Storage cabinet system integrated in the wall,
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of X- Ray viewer LED or equivalent
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Providing Magnetic Writing Board in each operating theatre. ecifications and BOQ.
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Scrub Sink Two bay wash basin
Part 1: Modular Construction Supply, Installation, Testing & Commissioning of Orthopaedic Electrohydraulic OT Table
Part 2: Surgical Booms, LED OT Lights & Digital Integration Surgical Booms a)Supply, Installation, Testing & Commissioning of Double Arm Anaesthesia pendant-
Part 2: Surgical Booms, LED OT Lights & Digital Integration Surgical Booms b)Supply, Installation, Testing & Commissioning of Double Arm Surgeon Pendent
Part 2: Surgical Booms, LED OT Lights & Digital Integration Supply, Installation, Testing & Commissioning Digital integration solution in Operation Theatre
Part 2: Surgical Booms, LED OT Lights & Digital Integration Supply, Installation, Testing & Commissioning of Double Dome OT Light with Full HD Camera and third arm for monitor
Part 2: Surgical Booms, LED OT Lights & Digital Integration Supply, Installation, Testing & Commissioning of Digital PACS Viewing Station 32” for Operation Theatres
Part 2: Surgical Booms, LED OT Lights & Digital Integration Supply, Installation, Testing & Commissioning of Interactive Collaboration Display
Part 3: Electrical, HVAC, MGPS Supply, Installation, Testing & Commissioning of Electrical work inside Operation Theatre , Recovery unit , Corridor & auxiliary rooms- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Supply, Installation, Testing & Commissioning of UPS :10KVA ON Line 30 Min Back up- complete as per enclosed technical specifications and BOQ
Part 3: Electrical, HVAC, MGPS HVAC a)Supply, Installation, Testing & Commissioning of AHU with Air Cooled Package Chiller / Condensing Units for Operation Theatre- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS HVAC b)Supply, Installation, Testing & Commissioning of Ductwork and accessories- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS HVAC c)Supply, Installation, Testing & Commissioning of Split AC 2 Ton- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline a)Supply, Installation, Testing & Commissioning of Medical Gas piping inside all OT’s - complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline b)Supply, Installation, Testing & Commissioning of Isolation valve- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline c)Supply, Installation, Testing & Commissioning of Zonal Isolation Valve Boxes- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline d)Supply, Installation, Testing & Commissioning of Medical Gas LCD Digital Area Alarm- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline e)Supply, Installation, Testing & Commissioning Bed head panel- complete as per enclosed technical specifications and BOQ.
Part 3: Electrical, HVAC, MGPS Medical Gas pipeline f)Supply, Installation, Testing & Commissioning of AGSS- complete as per enclosed technical specifications and BOQ
Part 3: Electrical, HVAC, MGPS Demolishing, Reconstructing, Water Proofing, Plumbing, Repainting and Replacement
Part 3: Electrical, HVAC, MGPS Hospital Nurse Call, Intelligent Addressable Fully Redundant Fire alarm detection system for recovery room- complete as per enclosed technical specifications and BOQ
Anand Chemiceutics
Chitrasales And Services
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid