Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L Quoted ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 L+₹6,435.20 (2.00%)Rejected-Finance | ₹3.3 L+₹6,435.20 (2.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 L+₹9,652.80 (3.00%)Rejected-Finance | ₹3.3 L+₹9,652.80 (3.00%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | N.K. ENTERPRISE L2 | RINA ENTERPRISE L3 | PRESESION SPARES L1 |
|---|---|---|---|---|---|---|
| 1.00Part A :Repairing of New allen berry make CKC-355 ,Ratio 31.5:1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly. | ||||||
| 1.01 | Welding of its housing by suitable electrodes (L&T 680) | 4 | WORK | 8,160 ₹32,640 | 8,240 ₹32,960 | 8,000 ₹32,000 Lowest |
| 1.02 | Grinding of welded area | 4 | WORK | 663 ₹2,652 | 669.5 ₹2,678 | 650 ₹2,600 Lowest |
| 1.03 | Line boring of housing to required dimenion adaptable for bearing | 4 | WORK | 4,386 ₹17,544 | 4,429 ₹17,716 | 4,300 ₹17,200 Lowest |
| 1.04 | Buffing & polishing of the machined surface | 4 | WORK | 1,020 ₹4,080 | 1,030 ₹4,120 | 1,000 ₹4,000 Lowest |
| 1.05 | Checking of bore for proper fitment | 4 | WORK | 285.6 ₹1,142.4 | 288.4 ₹1,153.6 | 280 ₹1,120 Lowest |
| 1.06 | Rethreading of Holes | 28 | WORK | 357 ₹9,996 | 360.5 ₹10,094 | 350 ₹9,800 Lowest |
| 1.07 | Replacement of end covers of gear box unit | 2 | WORK | 34,680 ₹69,360 | 35,020 ₹70,040 | 34,000 ₹68,000 Lowest |
| 1.08 | Replacement of bearing on 1st intermediate gear no 22320 | 1 | WORK | 45,900 ₹45,900 | 46,350 ₹46,350 | 45,000 ₹45,000 Lowest |
| 1.09 | Replacement of bearing on 2nd intermediate gear no 32316 | 1 | WORK | 23,460 ₹23,460 | 23,690 ₹23,690 | 23,000 ₹23,000 Lowest |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
6 Mar 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Mnager, Jhanjra Area, ECL
Repairing of New allen berry make CKC-355 ,Ratio 31.5 to 1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly.
2026_ECL_354146_1
ECL/GM/JNR/EnM/A2/25-26/126 dated 21.02.2026
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,800
15 Sept 2026
23 Feb 2026
7 Mar 2026
23 Feb 2026
6 Mar 2026
24 Feb 2026
23 Feb 2026 - 2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A :Repairing of New allen berry make CKC-355 ,Ratio 31.5:1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly. | |||||
| 1.01 | Welding of its housing by suitable electrodes (L&T 680) | 4 | WORK | 1 | ₹4 |
| 1.02 | Grinding of welded area | 4 | WORK | 1 | ₹4 |
| 1.03 | Line boring of housing to required dimenion adaptable for bearing | 4 | WORK | 1 | ₹4 |
| 1.04 | Buffing & polishing of the machined surface | 4 | WORK | 1 | ₹4 |
| 1.05 | Checking of bore for proper fitment | 4 | WORK | 1 | ₹4 |
| 1.06 | Rethreading of Holes | 28 | WORK | 1 | ₹28 |
| 1.07 | Replacement of end covers of gear box unit | 2 | WORK | 1 | ₹2 |
| 1.08 | Replacement of bearing on 1st intermediate gear no 22320 | 1 | WORK | 1 | ₹1 |
| 1.09 | Replacement of bearing on 2nd intermediate gear no 32316 | 1 | WORK | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_366969.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .