Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 LAdmitted-Finance | ₹3.3 L | L2 | Admitted-Finance |
| 3 | L3₹3.3 LAdmitted-Finance | ₹3.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.K. ENTERPRISE L2 | RINA ENTERPRISE L3 | PRESESION SPARES L1 |
|---|---|---|---|---|---|---|
| 1.00Part A :Repairing of New allen berry make CKC-355 ,Ratio 31.5:1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly. | ||||||
| 1.01 | Welding of its housing by suitable electrodes (L&T 680) | 4 | WORK | 8,160 ₹32,640 | 8,240 ₹32,960 | 8,000 ₹32,000 |
| 1.02 | Grinding of welded area | 4 | WORK | 663 ₹2,652 | 669.5 ₹2,678 | 650 ₹2,600 |
| 1.03 | Line boring of housing to required dimenion adaptable for bearing | 4 | WORK | 4,386 ₹17,544 | 4,429 ₹17,716 | 4,300 ₹17,200 |
| 1.04 | Buffing & polishing of the machined surface | 4 | WORK | 1,020 ₹4,080 | 1,030 ₹4,120 | 1,000 ₹4,000 |
| 1.05 | Checking of bore for proper fitment | 4 | WORK | 285.6 ₹1,142.40 | 288.4 ₹1,153.60 | 280 ₹1,120 |
| 1.06 | Rethreading of Holes | 28 | WORK | 357 ₹9,996 | 360.5 ₹10,094 | 350 ₹9,800 |
| 1.07 | Replacement of end covers of gear box unit | 2 | WORK | 34,680 ₹69,360 | 35,020 ₹70,040 | 34,000 ₹68,000 |
| 1.08 | Replacement of bearing on 1st intermediate gear no 22320 | 1 | WORK | 45,900 ₹45,900 | 46,350 ₹46,350 | 45,000 ₹45,000 |
| 1.09 | Replacement of bearing on 2nd intermediate gear no 32316 | 1 | WORK | 23,460 ₹23,460 | 23,690 ₹23,690 | 23,000 ₹23,000 |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
6 Mar 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Mnager, Jhanjra Area, ECL
Repairing of New allen berry make CKC-355 ,Ratio 31.5 to 1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly.
2026_ECL_354146_1
ECL/GM/JNR/EnM/A2/25-26/126 dated 21.02.2026
Open Tender
Miscellaneous Works
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,800
12 Mar 2026
23 Feb 2026
7 Mar 2026
23 Feb 2026
6 Mar 2026
24 Feb 2026
23 Feb 2026 - 2 Mar 2026
Part A :Repairing of New allen berry make CKC-355 ,Ratio 31.5:1,3 Stage foot mounted gear box of Belt conveyor of MIC ,J.P. Colly.
Welding of its housing by suitable electrodes (L&T 680)
Grinding of welded area
Line boring of housing to required dimenion adaptable for bearing
Buffing & polishing of the machined surface
Checking of bore for proper fitment
Rethreading of Holes
Replacement of end covers of gear box unit
Replacement of bearing on 1st intermediate gear no 22320
Replacement of bearing on 2nd intermediate gear no 32316
Replacement of bearing on input pinoion no 31315
Replacement of bearing on 1st output gear no 22315
Replacement of end cover of gear box unit
Replacement of oil seals(Oil seal-70 X 90 X 10MM-1 no, Oil seal-180 X 215 X 16 MM-1 no)
Transportation cost & loading cost
Repairing, overhauling, body build up, retreading, painting & fitting etc. work
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_366969.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid