Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.7 LAccepted-Finance | 1 | Accepted-Finance L1 Bidder | |
| 2 | Not Admitted-Finance 02 PADRI SHIV NAGAR SHIV NAGAR MAHARAJGANJ UTTAR PRADESH 273303 | MAHARAJGANJ | UTTAR PRADESH | 273303 | - | Not Admitted-Finance Price Bid not complied | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied | |
| 5 | Not Admitted-Finance 3 4 24 47 RAILWAY EMPLOYEES COLONY BOLARUM RANGAREDDI TELANGANA 500010 | HYDERABAD | TELANGANA | 500010 | - | Not Admitted-Finance Price Bid not complied |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
10 Nov 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pranav Awasthy
15 BIHAR, PIN-910515, c/o 56 APO at Sumdo, Kinnaur (Dist), HP
Construction of advance battle obstacle course
2020_ARMY_388903_1
1307/Trg/MOTIMS/A3
Open Tender
Construction Works
Works
180 days
Sumdo, Kinnaur (Dist), HP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1 L
Yes
25 Jan 2021
22 Oct 2020
11 Nov 2020
22 Oct 2020
10 Nov 2020
23 Oct 2020
22 Oct 2020 - 6 Nov 2020
120 days
Construction of Advance Battle Obstacle Course (Consisting of 15 x Obstacles)
Zig Zag Balance (a) 06x06 Inches wooden plank (quantity 04 in tandem) of 06 ft zigzag with base of proportionate height . (b) Three rows (Load bearing 100 Kg on each row). (c) Height-2.5 ft Sloping upwards till 05 ft. (d) Landing pit at end with sand. (e) Non Slippery surface. (f) Water resistance/painted/Termite treatment. (g) Foundation minimum 04 ft.
Horizontal Traversing Ladder (a) Supported by MS pipes(04 inches minimum) at four places of height 08 ft. (b) 20 ft distance covered with simultaneous MS pipes placed horizontally of minimum 02 Inches thickness and of width 03 ft at gap of every 01 ft. (c) Path below to be filled with sand. (d) Hanging bars to take weight of 200 kg at a time. (e) To be Painted. (f) Foundation minimum 04 ft.
Double Stride Jump. 02 ditches in tandem with each have 06 ft width, gap of 04 ft between them & depth of minimum 03 ft. Masonry work all around ditches to prevent soil caving. Foundation minimum 04 ft.
Vertical Wall 10 Ft-900 Wall. A vertical brickwall (90 degree) of 10 ft Height, 12 ft Width and thickness of 18 Inches. Painted with sand colour. Foundation minimum 04 ft.
Stepping Stone. It would have a total of 24 cemented platforms of 01x01x01 ft having 04 parallel rows of 06 platforms each at a distance of minimum 03 ft. Foundation minimum 04 ft.
Intertwined Rope Mesh. It would be a ‘V’ shape Iron frame with hooks, with rope net with height from ground above, minimum 16.5 ft & minimum width 12 ft. It would have following specifications :- (a) MS Pipe/ Girder of 06 Inches thickness for ‘V’ structure with foundation of approx 05 ft.(IS/ISO 9000) (b) Mesh of Rope Nylon (minimum thickness 2.5 Inches) to cover 12x16 ft, facility to remove it went not in use. Gap in wire mesh shouldn’t be more than 09 Inches. (c) Foundation minimum 04 ft.
Balance Walk. It would be three parallel walk balance 19 ft in length (over the ditch), separated by approx 05 ft over a ditch with minimum 3.5 ft height. Each walk balance will be made of 22 ft long Saalwood (06x06 Inches) duly supported below by cemented pillars against shaking. Ditch secured by masonry work all around. Foundation minimum 04 ft.
Horizontal Traversing Rope. (a) Supported by two MS pipes (minimum 06 inches thick) at two places. Height of 14 feet above ground level with adequate foundation. (b) 26 ft distance between the two pipes. (c) Area below to be filled with loose sand of minimum 18 inch thickness. (d) Manila/ Jute Rope (Minimum 32 ft length to be tied at both ends) with iron hooks to support weight of 200 kg and one rope of minimum 10 ft length to climb down. (e) Poles to be Painted. 02 Ft cemented platform. (f) Foundation minimum 04 ft.
Ramp. A ramp made up of cement with minimum height 4.5 ft & minimum width 08 ft. Ramp will have an elevation slope of 60-70 degree of 09 ft length and a flat surface of 05 ft. Loose sand at landing area.
Crawling Tunnel. The tunnel would be a cylindrical shaped pipe to be used for crawling (made up of cement and iron). Three tunnels (placed next to each other) of minimum length of 30 ft each and inner diameter of 03 ft through which one person with a back pack can pass Base.
Rope Ladder. It would be a vertical obstacle with minimum height 16.5 ft, minimum width 12 ft. Three ladders of rope Malina/ Jute will be hung on the horizontal beam having a length of minimum 12 ft from the beam. Width of the ladder will be of minimum 02 ft. Inter-say gap between each ladder will be of 02 ft and gap between ladder and vertical pole will be of 01 ft. It would have following specification:- (a) Girder-Minimum 06 Inches (ISI Mark) or more, to bear weight of minimum 300 Kg at a time. (b) Rope Ladder (Manila/ Jute) - 03 Nos (Each ladder to bear minimum load of 100Kg each). (c) Other items as per requirement. (d) Foundation minimum 04 ft.
High Commando Crawl. Four poles with minimum height 13 ft above ground level, traversing distance of minimum 20 ft and two ropes of minimum 28 ft length each. Extra two ropes of minimum length of 08 ft to climb down. Inter-say distance between adjoining poles will be 06 Ft. Specifications:- (a) Girder- Minimum 06 Inches (ISI Mark) or more, to bear weight of minimum 100 Kg at a time. (b) Rope Manila/ Jute- total approx 80-90 ft. (c) Iron stairs between girders to climb up/ down. (d) Other items as per requirement. (e) Foundation minimum 04 ft.
Undulating Terrain Simulator Vertical Wall. It would be a vertical wall (90 degree) with height of minimum 15 ft, width of 12 ft and thickness of 02 ft. The wall should have beam support on both sides with 06 ft foundation with columns. Painted with sand colour. Should have stepping stones (06x06 Inches) fixed into the wall for climbing by 03 persons at a time with manila/ jute rope of minimum 14 ft hooked on top, fully secured through fixed iron rings and 03 Iron stairs on other side to climb down.
Hand & Foot Bridge. It would consist of two parallel manila/ jute ropes with minimum length of 36 ft each for hand and foot balance at minimum height 7 ft from ground. Two GI Pipes of height 14 ft above ground. Two vertical ropes for both ends to limb up/ down and a cemented platform at one end. It would have following specifications:- (a) GI Pipe 6” Heavy – Min 2 Nos. (IS/ISO 9000) (b) Support Angle 1 ½” x 1 ½” - Min 8 Nos. (c) Rope Manila/ Jute- Minimum approx 150 ft. (d) Foundation min 04 ft with allied Mason work.
Rope Burma Bridge. Four poles with minimum height of 14 ft above ground level, gap for traversing 26 ft and inter-say gap of 4.5 ft. 03 Ropes to be fixed for traversing length and supporting ropes at gap of every 01 ft. It would have following specification:- (a) Girder- Four of minimum 06 Inches (ISI Mark) or more, to bear weight of minimum 200 Kg at a time. (b) Iron stairs between girders to climb up/ down. (c) Rope Manila/ Jute- Total approx 150 ft. (d) Other items as per requirement. (e) Foundation minimum 04 ft.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .