| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | ₹24.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.9 LRejected-AOC TAMIL NADU | VELLORE | TAMIL NADU | 632001 | ₹24.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S Vasanthakumar L1 | M/S VSP CONSTRUCTIONN L2 |
|---|---|---|---|---|---|
| 1.00Construction of 60000 Lit's Capacity OHT at Puliyathangal H/O Thenkadappanthangal Panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 72 | cum | 260 ₹18,720 | 270 ₹19,440 |
| 3.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 9 | cum | 260 ₹2,340 | 270 ₹2,430 |
| 4.00 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | 5.4 | cum | 1,700 ₹9,180 | 1,750 ₹9,450 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 5.4 | cum | 5,390 ₹29,106 | 5,450 ₹29,430 |
| 6.00Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | |||||
| 7.00 | Items 1.50 m to 4.50m below GL | 12.34 | cum | 9,410.5 ₹1.2 L | 9,410.86 ₹1.2 L |
| 8.00 | UP Below GL | 2.53 | cum | 9,290 ₹23,504 | 9,291.01 ₹23,506 |
| 9.00 | Items 0.0 to 4.50m Above GL | 4 | cum | 9,410 ₹37,640 | 9,410.86 ₹37,643 |
| 10.00 | Above 4.51m and Upto 7.32Ht m | 3.17 | cum | 9,527 ₹30,201 | 9,527.71 ₹30,203 |
Tender Value
Refer Docs
EMD Value
₹25,200
Closing Date
25 Feb 2026, 3:00 pmClosed
Block Development Officer
Block Development Officer,Walajah
Construction of 60000 Lits Capacity OHT at Puliyathangal H/O Thenkadappanthangal Panchayat
2026_RDTN_664264_1
B2/670/2026
Open Tender
Civil Works
120 days
Block Development Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹25,200
4 Mar 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
Construction of 60000 Lit's Capacity OHT at Puliyathangal H/O Thenkadappanthangal Panchayat
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Items 1.50 m to 4.50m below GL
UP Below GL
Items 0.0 to 4.50m Above GL
Above 4.51m and Upto 7.32Ht m
Above 7.32m and Upto 10.98 m
From 10.98m Upto 14.64m above GL
From 14.64m to Above GL
Supplying and erecting centering shuttering inculding necessary support for plane surfae foundation and basement and in all floors for RCC column footing column plinth beam roof slabs, strircase steps bed blocks critical
Square column
Below GL
8.31 to 9.30m ht
10.31 to 10.90m ht
11.31 to 11.40m ht
For Plan surface
From 0.00 - 3.30m
From 5.30m to 6.30 m
From 8.30m to 9.30m above G.L
From 11.30 m to 12.30m
Curved Surface
Up to 0- 3.30m Height
From 5.31m to 6.30m Height
Supply and fabrication of steel including cost and conveyance and labour charges etc complete.
Painting two coats with Emulsion Paint paint including cost and conveyance of all materials to site and all labour charges etc comoplete
Supplying and Fixing in Position of Cut Stone set in Cm 1:3 using well dressed cut stone supporting inlet pipe inside the tank and as directed by the officers
For Pipe Connection
For Inlet Arrangements
80 mm GI Pipes
80 mm GI Coupling
80 mm GI Bend
80 mm GI Flange
90 mm PVC Thereaded coupler
For Outlet Arrangements
80 mm GI Pipes
80 mm GI Coupling
80 mm GI Bend
80 mm GI Flange
80 mm GM Gate Valve
65 mm GM Gate Valve
90 mm PVC Thereaded coupler
90 mm x 63 mm PVC Reducer
For Source Arrangements
80 mm GI Pipes
80 mm GI Coupling
80 mm GI Bend
80 mm GI Flange
80 mm GM Gate Valve
90 mm PVC Thereaded coupler
For Overflow Arrangements
80 mm GI Pipes
80 mm GI Coupling
80 mm GI Bend
80 mm GI Flange
90 mm PVC Thereaded coupler
Rubber Sheet
Bolt and Nuts
Labour Charges
80 mm GI Pipe Cutting
80 mm GI Pipe Threading
Supplying , Fabricating,Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc. , Complete complying with stanard specification.
Providing Manhole cover of size 0.60x0.60 m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm Ms angle fixed along edges and as directed by Departmental Officers
Supplying and delivery and fixing in Position of 150 mm dia AC Ventilators on the Roof slab
Providing and fixing of RCC inner access ladder in RCC 1:1:5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm x 15cm and step slab of 25mm x25mm etc., complete and as directed by Board officers.
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Provision for Platform
Earth work excavation for all soils including all labour charges etc complete
Cement concrete 1:4:8 mix using 40 mm metal including all Lbour charges etc complete
Supply and erecting Centering including all labour chages etc complete
Cement concrete 1:3:6 mix using 20 mm metal including all Lbour charges etc complete
Cement concrete 1:2:4 mix using 20 mm metal including all Lbour charges etc complete
Filling 40mm Metal Including Cost and conveyance of all labour charges etc., complete.
Filling 20mm Metal Including Cost and conveyance of all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_797563.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid