| 1 | Rejected-Technical VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | Rejected-Technical AS PER TECHNICAL EVALUATION |
| 2 | Rejected-Technical KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | Rejected-Technical AS PER TECHNICAL EVALUATION |
| 3 | Rejected-Technical 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | Rejected-Technical AS PER TECHNICAL EVALUATION |
Tender Value
Refer Docs
EMD Value
₹38.9 L
Closing Date
21 May 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Restoration of damaged portion of lining of MWGC from km 71.000 to 71.800, km 72.400 to km 73.500 and km 74.450 to km 74.700 Irrigation division Kushinagar in district Kushinagar
2026_UPIDC_1146065_4
01/SE/2026-27
Open Tender
Civil Works
Item Wise
485 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹38.9 L
Yes
1 Jul 2026
7 May 2026
21 May 2026
7 May 2026
21 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 919.5 | Cum | - | - |
| 2 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 38,663.88 | Cum | - | - |
| 3 | Earth work for making Ramp for working in canal every 500 meters at Right side including cost of material ,labour,T&P and other accessories for proper completion of work as directed by Engineer-In-Charge as per ID specification. | 1,688.97 | Cum | - | - |
| 4 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 38,216.04 | Cum | - | - |
| 5 | Plain Cement Concrete in 1:4:8 in Toe wall base with Coarse sand having F.M. > 2.5,old Dismentaled brick ballast of nominal size of 20 mm to 40 mm, ,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 145.13 | cum | - | - |
| 6 | Plain Cement Concrete in M-15 Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. > 2.0, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 4,804.16 | Cum | - | - |
| 7 | Plain Cement Concrete in M-20 Lining (125 mm) with Coarse Sand having F.M. > 2.0, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 53,298.48 | Sqm | - | - |
| 8 | Laying CC block (600x600x300) in M20 Grade of Concrete with Coarse sand, Crushed Stone Aggregate, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), iucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 797.7 | Cum | - | - |
| 9 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 2,318.39 | Cum | - | - |
| 10 | Supplying and laying Stone Grit 12.5 to 20 mm below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 2,199.72 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.36 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BID04.pdf
Tender Documents • 3.71 MB
BOQ_2142946.xls
BOQ • 0.29 MB
corr_01.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .