| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-Finance | L1 | Accepted-Finance L1 is quoted as low | |
| 2 | L2₹17.8 L+₹2.7 L (17.6%)Accepted-Finance | L2 | Accepted-Finance L2 is quoted as higher than L1 | |
| 3 | L3₹18.2 L+₹3.0 L (20.0%)Accepted-Finance | L3 | Accepted-Finance L3 is quoted as higher than L2 |
Tender Value
₹17.8 L
EMD Value
₹18,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Executive Engineer ,PWD
Executive Engineer ,PWD Buildings ( Cand M) Division Collectorate Campus Kancheepuram
Special Repairs to flooring , Front approach and Sanitary arrangements in Government High School at Ullavur in Kancheepuram District
2026_PWD_689631_1
5KPM/02/2026-2027
Open Tender
Civil Works - Buildings
Percentage
60 days
Ullavur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹18,000
20 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 31.7 | M2 | 65.56 | ₹2,078.25 |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 8.3 | M3 | 366.82 | ₹3,044.61 |
| 3 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 43.3 | m3 | 715.56 | ₹30,983.75 |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 29.7 | m3 | 1,891.15 | ₹56,167.16 |
| 5 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 30.2 | m3 | 5,481.42 | ₹1,65,538.88 |
| 6Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 6.01 | In Cement Mortar 1:6 in ground floor | 14.99 | m3 | 7,548.2 | ₹1,13,147.52 |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 25.9 | m3 | 7,002.7 | ₹1,81,369.93 |
| 8 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 and above 20mm thick with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., complete complying with standard speicification and as directed by the departmental officers.(The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work) | 85.1 | m3 | 1,452.16 | ₹1,23,578.82 |
| 9 | Flooring with ceramic tiles of (Self Designed Colour Ceramic Tiles )size 305 x 305 x 6mm and variety conforming to IS 15622 laid over cement mortar bed of 20 mm thick in cement mortar 1:3 (One Cement and Three crushed stone Sand) with required Cement Slurry and Mortar Plasticizer including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with Water Resistant Tile Epoxy Grout at the rate of 0.27 Kg. / sq.m. etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 23.8 | m3 | 1,158.13 | ₹27,563.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
ETN502.pdf
Tender Documents • 0.23 MB
GeneralCondition.pdf
Tender Documents • 0.31 MB
BOQ_829003.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .