Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹3.9 L+₹77,232.70 (24.6%)Rejected-AOC | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | SRI AYYAPPAN ENTERPRISES | Sangeetha Enterprises |
|---|---|---|---|---|---|
| 1.00 | charges for loading and unloading of new ERW 200 NB NB M.S. Pipe from stores to workspot. | 6.5 | Ton | 18,850 ₹22,243 Lowest | 22,815 ₹26,921.7 |
| 2.00 | charges for dismantling of existing 200 NB M.S. Pipes loading and unloading the same to stores as per the instruction of the Engineer-in-charge. | 138 | mtr | 41,400 ₹48,852 Lowest | 70,380 ₹83,048.4 |
| 3.00 | Charges for Erection, Laying and welding of 200 NB M.S Pipe line | 25 | Nos | 1,27,500 ₹1,50,450 Lowest | 1,50,125 ₹1,77,147.5 |
| 4.00 | charges for fabrication of 200 NB bend from 200 NB M.S. pipe by cutting the required length of pipe, grinding and welding as per the required dimension including the cost of required consumables and hire charges for T&P etc., | 8 | Nos | 24,000 ₹28,320 Lowest | 32,120 ₹37,901.6 |
| 5.00 | Charges for fabrication of 'Tee' piece 200 NB MS ERW pipe. | 1 | No | 6,500 ₹7,670 Lowest | 7,520 ₹8,873.6 |
| 6.00 | Charges for providing necessary scaffolding arrangement for dismantling and erection of 200 NB pipes (Service Water Pump 3 discharge to OHT I) at 3.5 mtr elevation from the ground and removing after completion of the works. | 3 | Sets | 33,150 ₹39,117 Lowest | 36,300 ₹42,834 |
| 7.00 | charges for cleaning and painting one coat of Red oxide primer 200 NB pipe service water pump 3 discharge to OHT1 including cost of consumable and paint. | 94.9 | m2 | 7,592 ₹8,958.56 Lowest | 9,395.1 ₹11,086.22 |
| 8.00 | charges for painting two coat of Enamel paint 200 NB pipe service water pump 3 discharge to OHT1 including cost of consumable and paint. | 94.9 | m2 | 16,607.5 ₹19,596.85 Lowest | 20,783.1 ₹24,524.06 |
| 9.00 | charges for erection of 300 NB Gate Valve near OHT I. | 1 | No | 3,600 ₹4,248 Lowest | 4,019 ₹4,742.42 |
| 10.00 | charges for fabrication and erection of supporting structure near OHT I at about 5 mtr elevation from the ground including T&P hire charges and cost for consumables. | 0.49 | Ton | 20,580 ₹24,284.4 Lowest | 22,295 ₹26,308.1 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
1 May 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD ACWPH Dismantling and replacement of wornout and punctured 200 NB MS ERW pipe in service water pump III discharge to OHT I line near clarified pump house
2025_EB_546653_1
CE/SE/O/TTPS/Spec.No.79/25-26
Open Tender
Miscellaneous Works
Item Rate
30 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,900
Yes
15 Nov 2025
16 Apr 2025
2 May 2025
16 Apr 2025
1 May 2025
16 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .