| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC 223 N DHARMAPALLY TENTULTALA ASANSOL BURDWAN WEST BENGAL 713304 | ASANSOL | BURDWAN | WEST BENGAL | 713304 | ₹5.4 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹6.0 Cr+₹63.6 L (11.8%)Rejected-Finance MEMARI DVC PARA MEMARI BURDWAN | MEMARI | BURDWAN | WEST BENGAL | ₹6.0 Cr+₹63.6 L (11.8%) | L2 | Rejected-Finance GREATER THAN 1ST LOWEST |
| 3 | L3₹6.1 Cr+₹64.8 L (12.0%)Rejected-Finance BC 32 SALT LAKE CITY SECTOR I KOLKATA 700064 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700064 | ₹6.1 Cr+₹64.8 L (12.0%) | L3 | Rejected-Finance GREATER THAN 1ST LOWEST |
| 4 | L4₹6.6 Cr+₹1.2 Cr (21.9%)Rejected-Finance ARABINDAPALLY SURI BIRBHUM PIN 731101 | SURI | BIRBHUM | WEST BENGAL | 731101 | ₹6.6 Cr+₹1.2 Cr (21.9%) | L4 | Rejected-Finance GREATER THAN 1ST LOWEST |
| 5 | L5₹6.7 Cr+₹1.3 Cr (24.5%)Rejected-Finance 23K CHRISTOPHER ROAD GOBINDA KHATICK ROAD KOLKATA KOLKATA WEST BENGAL 700046 | KOLKATA | WEST BENGAL | 700046 | ₹6.7 Cr+₹1.3 Cr (24.5%) | L5 | Rejected-Finance GREATER THAN 1ST LOWEST |
Tender Value
₹7.1 Cr
EMD Value
₹10 L
Closing Date
21 Nov 2025, 10:00 amClosed
SE,CTU
OFFICE OF THE CTU,JALASAMPAD BHAWAN, 8TH FLOOR,KOL-91
Protection work by concrete block pitching of Left bank of Short Cut Diversion Channel from Subgachtola bridge to Rampur Syphon for a length of 2.95 Km and Right Bank from Joypur Sluice to Jhamtia Health Centre for 2.95 Km, Total 5.90 Km in Block-A
2025_IWD_934626_1
WBIW/CTU/CE(W) /e-NIT- 15 (e)/ 2025-26
Open Tender
CIVIL WORKS
Percentage
270 days
Rampur Syphon
Please refer Tender documents.
6 documents required · 6 mandatory
₹10 L
Yes
27 Aug 2026
31 Oct 2025
21 Nov 2025
31 Oct 2025
21 Nov 2025
31 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Precast cement concrete blocks or lining units as per designed size and specification, with well graded stone metal aggregate, including dressing, ramming, shuttering, finishing the top surface with 1:3 cement and sand mortar, curing, transporting and laying the blocks or lining units at worksite in position, over filter, layer, keeping a gap of 6mm between the adjacent units, by sue of removable plyboards or non removable thermocol boards, with all leads and lifts, including supply and carriage of all materials complete.
(The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete).
With Stone Aggregate (Pakur, North Bengal or Rajmahal varieties)
b) Nominal Mix. 1:1.5:3 with 20 mm down coarse aggregate | 3,957.6 | Cum | 7,794.78 | ₹3,08,48,621.33 |
| 2 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of
necessary form work and staging complete as per drawing and technical specifications.
D. RCC Grade M20
(i) Hight upto 5m
(I)Using concrete Mixer | 2,713.81 | Cum | 7,529.66 | ₹2,04,34,066.6 |
| 3 | Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).
(b) 1st class brick ballast | 5,936.4 | Cum | 2,226.28 | ₹1,32,16,088.59 |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | - | % Cum | 14,214.6 | - |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).
(a) With earth obtained by from excavation of foundation. | 1,902.39 | % Cum | 9,241.22 | ₹1,75,80,404.52 |
| 6 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 6,846.42 | Cum | 96.54 | ₹6,60,953.39 |
| 7 | Extra rate over Item No.6 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50metre.
1 extra Lift | 2,259.32 | Cum | 14.3 | ₹32,308.28 |
| 8 | Extra rate over Item No.6 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.
1 (one)extra Lead | 2,396.25 | Cum | 14.3 | ₹34,266.38 |
| 9 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
A) Beyond 500 metre and upto 1.00 km
Earth work note for Royality:-
(This rate is includes compensation for earth for land owned / arranged by Contractor @ Rs25.00 per m³ and royalty charge on earth @ Rs 29.00 per m³ & Cesses charges @ Rs. 5.30 per m³(i.e., Rs. 15.00 per 100 cft ) as per Govt. notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses)
(The payment to be made on the basis of the finished compacted voloume )
Specified in 6th corrigenda PWD ( Road & Bridge) | 10,269.63 | Cum | 330.48 | ₹33,93,907.32 |
| 10 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 37,170 | Sqm | 5.9 | ₹2,19,303 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_2196534.xls
BOQ • 0.39 MB
185591162.pdf
Tender Documents • 2.10 MB
185591164.html
Tender Documents • 0.08 MB
BARCHART_1.pdf
Tender Documents • 0.40 MB
DRAWING_1.pdf
Tender Documents • 0.56 MB
WB2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .