Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.3 L+₹582.66 (0.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹4,680
Closing Date
18 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627109613 - CONSTT OF LANE WITH TILES FROM HO QAMAR ZAMAN VIA MURAWAT HUSSAIN YATOO TO MUKHTAR AHMAD SHEIKH AND OTHERS SHAR A
2026_RDPR_318138_32
e- NIT No. 70/2026-27 Dated 27-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹4,680
19 Aug 2026
27 Jul 2026
19 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 mts in width as well as 10 sqm on plan including disposal of excavated earth lead up to 50 mts, lift up tp 1.5 mts. | 42.92 | sqm | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 6.69 | cum | - | - |
| 3 | Providing and laying of dry stone soling/ L. muhk hand packed on horizantal surface incl.carriage by MT 10 KM avg. | 9.71 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.5 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | 5.2 | cum | 1 | ₹5.19 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.17 | cum | - | - |
| 6 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 58.53 | sqm | 1 | ₹58.47 |
| 7 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 712.99 | kgs | 1 | ₹712.28 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 14.63 | sqm | - | - |
| 9 | 12mm Cement plaster of mix: on walls
13.1.2 1 : 6 ( 1 cement : 6 fine sand) | 29.26 | sqm | 1 | ₹29.23 |
| 10 | Carriage of Sand / aggregate by MT of avg lead 10 kms. | 15.82 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_1046462.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .