Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹7.7 L
Closing Date
19 Oct 2026, 2:00 pm
Executive Engineer-I
Office of the Executive Engineer, Division - I, MTDC Ltd., TA and Hills Office Building, Imphal
Construction of School Bulding, Teachers Quarter and Rain Water Harvesting Structures at Pou Shankar Kane Vidyalaya Tamenglong, Tamenglong District, Manipur
2026_TAH_3489_1
108/MTDC-I/OS/NIT/2026/01
Open Tender
Composite Works
Percentage
720 days
Tamenglong
As per conditions in NIT and SBD
5 documents required · 5 mandatory
₹10,000
MD MTDC
₹7.7 L
Imphal
19 Oct 2026
25 Sept 2026
19 Oct 2026
25 Sept 2026
19 Oct 2026
5 Oct 2026
25 Sept 2026 - 5 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Construction of School Bulding, Teacher’s Quarter and Rain Water Harvesting Structures at Pou Shankar Kane Vidyalaya Tamenglong, Tamenglong District, Manipur | 1 | Nos | 3,82,40,617 | ₹3,82,40,617 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
3. Drawings.pdf
Tender Documents • 2.45 MB
1. SBD.pdf
Tender Documents • 0.77 MB
2. Estimates.pdf
Tender Documents • 1.01 MB
BOQ_3804.xls
BOQ • 0.27 MB
Corrigendum_1.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .