| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC 270 D 3RD FLOOR RABINDRA SARANI BURRABAZAR KOLKATA WEST BENGAL 700007 | KOLKATA | WEST BENGAL | 700007 | L1 | Accepted-AOC AOC is issued | |
| 2 | L2₹6.1 L+₹16,272 (2.76%)Rejected-Finance | L2 | Rejected-Finance Higher bidder | |
| 3 | L3₹6.3 L+₹42,970 (7.28%)Rejected-Finance H 144 358 N L CHATTERJEE ROAD RAMNAGAR P O RAIPUR MAHESHTALA KOLKATA 700141 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700141 | L3 | Rejected-Finance Higher bidder | |
| 4 | L4₹6.8 L+₹90,850 (15.4%)Rejected-Finance PRANAB PALLY P O DOMOHANI MAYNAGURI DIST JALPAIGURI WEST BENGAL 735302 | MAYNAGURI | JALPAIGURI | WEST BENGAL | 735302 | L4 | Rejected-Finance Higher bidder | |
| 5 | L5₹7.2 L+₹1.3 L (22.6%)Rejected-Finance | L5 | Rejected-Finance Higher bidder |
| Sl No | Description | Qty | Unit | THE BUSINESS ENGINEERS INDIA L2 | M/S INSILICA L3 | RASH ELECTRICAL WORKS L6 | Sunbird Power Pvt. Ltd. L1 | LAKSHMI KANTA GUCHHAIT L5 | SHAKE INTAZ L8 | TAN CONSULTANCY L7 | JAYANTA GHOSH L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Solar Module: Supply of MNRE (Ministry of Renewable Energy,Govt. of India)/ IEC approved 500WP (each Minimum) indigenous Solar Module of Monocrystaline cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA)and high transmissivity 3.2 mm tempered glass, framed in anodized aluminium frame .The power output of individual Lpv modules used in the PV array, under STC, with adequate provision for measurement tolerances. Modules supplied with the Spy system should have certificate as per IEC61215 specification or equivalent National or International standards. Modules must qualify to IEC61730 part I and part II for safety qualification testing and Salt Mist Corrosion Testing asper IEC61701/IS 61701.and having warranty for output wattage, which should not be less than 90%at the end of 10 years and 80%at the end of 25 years. ( Make: TATA /Adani/Gautam/HR) | 10,000 | WP | 26.1 ₹2,61,000 | 19.5 ₹1,95,000 Lowest | 27 ₹2,70,000 | 28 ₹2,80,000 | 31.73 ₹3,17,300 | 38.6 ₹3,86,000 | 26.75 ₹2,67,500 | 35 ₹3,50,000 |
| 2.00 | Supply, delivery & Erection of pre-fabricated M.S. steel structure of pable of extreme weather conditions including wind trust up to 150 KM/Hour with fixing of necessary MS ladder/railing and painting with appropriate weather coats including construction of R.C.C. foundation and all allied works as per approved drawing and direction of the E.I.C. Each structure should have angle of inclination as per the site conditions to take maximum isolation. The mounting structure steel shall be as per latest IS 2062\1992 standard and the galvanization of the mounting structure shall be in compliance of the latest IS for the structural material should be corrossion resistance and electrolytically compatible with the materials used to construct the module frame, including fastener, nuts and bolts. The thickness of the galvanization should be more than 75 Micron. Necessary protecdon towards rusting need to be provided either by coating or anodization.The minimum clearance of the structure from the roof level should be 1000 MM. Design to be approved by EIC before fabrication. Special type structural work should be aproved by EIC as per side condition.
(Make: TATA / Jindal/Bansal) | 1 | Job | 87,840 ₹87,840 | 75,000 ₹75,000 | 88,480 ₹88,480 | 72,000 ₹72,000 | 83,093 ₹83,093 | 99,468 ₹99,468 | 1,53,900 ₹1,53,900 | 50,000 ₹50,000 Lowest |
| 3.00 | Supply testing commissiong of 1 no PV Array Junction Box with A)The junction are to be provided in the SPD WITH IP 66 ENCLOSER AND ACDB WITH SPD AND IP 65 ENCLOSER 32 A MCB ,40 KA AC SPD. and for DCDB 32 A DP MCB and DC spd. P.C Distribution Panel Board {DPB) shall control AC power PCU/ inverter and should have necessary surge arrestors. interconnection to ACDB to mains at LT Bus bar. Designed for 10 KWP solar power plants with all protections as per MNRE guidelines. DC DPBs shall have sheet form encloser of dust and vermin proof conform to IP 66 protection. The bus bars should be made of Copper of suitable size and of suitable capacity fuse and MCBs / MCCB shall be provided for controlling DC power output, to the PCU along with suitable surge rectors. AC power distribution panel board (DPB) shall control the AC power from PCU/Inverter and should have necessary surge arrestors. Interconnection from SEDB to Mains at LT Bus bar while in grid tied mode. All switches and the circuit breakers connectors should come from to IEC 60947 part 1, 2 and 3. Is 60947 Part 1, 2 and 3. All the panels shall be meta clad totally enclosed rigid floor mounted air insulated cubicle type suitable for operation on 3 phase / single phase 415 volts. 50 Hz all indor panels will have protection of IP 54 or better. All outdor panels will have protection of IP65 or better. (Make- Hansel/Havells/Mersen) | 1 | Set | 11,700 ₹11,700 | 45,000 ₹45,000 | 32,770 ₹32,770 | 5,700 ₹5,700 Lowest | 6,893 ₹6,893 | 11,029 ₹11,029 | 78,300 ₹78,300 | 20,000 ₹20,000 |
| 4.00 | ACDB 16 SWG poder coated, Double Door with IP 42/43 protection along with all necessary connection ( Make: L&T/Legrand/Schneider/Seimens) | 1 | No | 11,700 ₹11,700 | 18,500 ₹18,500 | 8,192 ₹8,192 | 7,500 ₹7,500 Lowest | 7,898 ₹7,898 | 13,035 ₹13,035 | 65,600 ₹65,600 | 20,000 ₹20,000 |
| 5.00 | Power Conditioning Unit [ Hybrid/ongrid ]: As SPV array produce direct current electricity, It is necessery to convert this direct current into alternating current and adjust the voltage levels to match the grid voltage. Conversion shall be achieved using an electronic inverter and the associated control and protection devices. All these components of the system are termed the " Power Conditioning Unit [ PCU]". In addition , the PCU shall also house MPPT [ Maximum Power Point Tracker] controller. inverter output should be compatible with the grid frequency.This PCU should support Net-metering function Utility facility. Typical technical features of the inverter should be as follows. including remote monitoring system(Web based on-line RMS system) 1.Rated AC power:- Three Phase, 50Hz
2.Max Supported Panel Power:- 11000Wp
3.Charge Controller:- MPPT 4. Rated output power 10 Kw (Make: TATA approved/Growatt/Sungrow/Thea/Power One) | 1 | No | 1,09,000 ₹1,09,000 | 97,000 ₹97,000 | 1,11,420 ₹1,11,420 | 1,32,000 ₹1,32,000 | 1,32,319 ₹1,32,319 | 1,62,000 ₹1,62,000 | 78,200 ₹78,200 Lowest | 1,50,000 ₹1,50,000 |
| 6.00 | Supply and laying of DC cable 1C*4 Sq mm Cu, 1.1KV grade for Solar (Finolex/RR/Polycab) | 210 | Mtr | 45 ₹9,450 | 125 ₹26,250 | 43 ₹9,030 | 40 ₹8,400 Lowest | 83 ₹17,430 | 102 ₹21,420 | 68.3 ₹14,343 | 70 ₹14,700 |
| 7.00 | Supply and laying of 1.1 Kv grade 4C* 6 Sq mm PVC copper cable (Finolex/RR/Polycab) | 160 | Mtr | 70 ₹11,200 Lowest | 142 ₹22,720 | 280 ₹44,800 | 140 ₹22,400 | 247 ₹39,520 | 298 ₹47,680 | 168.5 ₹26,960 | 160 ₹25,600 |
| 8.00 | Supply and laying of1.1 Kv grade 4C* 10 Sq mm PVC copper cable (Finolex/RR/Polycab) | 25 | Mtr | 122.48 ₹3,062 | 260 ₹6,500 | 487 ₹12,175 | 180 ₹4,500 | 795 ₹19,875 | 970 ₹24,250 | 385 ₹9,625 | 20 ₹500 Lowest |
| 9.00 | Supply and installation of Kiosk | 1 | Item | 9,000 ₹9,000 | 22,000 ₹22,000 | 8,192 ₹8,192 | 6,000 ₹6,000 | 2,988 ₹2,988 | 36,180 ₹36,180 | 65,300 ₹65,300 | 50 ₹50 Lowest |
| 10.00 | Supply,installation of System Earthings : Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-1987. In addition the lighting arrester/masts should also be earthed inside the array field, PCU, ACDB and DCDB should also be earthed properly. | 4 | Job | 8,200 ₹32,800 | 18,000 ₹72,000 | 8,192 ₹32,768 | 2,250 ₹9,000 Lowest | 4,855 ₹19,420 | 6,250 ₹25,000 | 3,800 ₹15,200 | 10,000 ₹40,000 |
Tender Value
Refer Docs
EMD Value
₹18,800
Closing Date
9 Aug 2024, 1:00 pmClosed
Office of the Executive Engineer Purba Medinipur
Office of the Executive Engineer Purba Medinipur Electrical Division P.W.D
SITC of one (01) No. 3-phase 10 KWP on grid rooftop Solar PV Power Plant system on Juvenile Justis Home (for child with special need girls) at Nimtouri Tamluk Unnayan Samity at Chalksrikrishnapur, Kulberia, Nimtouri, Purba Medinipur.
2024_WBPWD_722530_1
WBPWD/EE/PMED/NIQ-29/2024-25
Open Tender
ELECTRICAL WORKS ORG
Item Rate
15 days
tamluk
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,800
Tamluk
27 Nov 2025
26 Jul 2024
12 Aug 2024
26 Jul 2024
9 Aug 2024
1 Aug 2024
31 Jul 2024
Amount
Solar Module: Supply of MNRE (Ministry of Renewable Energy,Govt. of India)/ IEC approved 500WP (each Minimum) indigenous Solar Module of Monocrystaline cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA)and high transmissivity 3.2 mm tempered glass, framed in anodized aluminium frame .The power output of individual Lpv modules used in the PV array, under STC, with adequate provision for measurement tolerances. Modules supplied with the Spy system should have certificate as per IEC61215 specification or equivalent National or International standards. Modules must qualify to IEC61730 part I and part II for safety qualification testing and Salt Mist Corrosion Testing asper IEC61701/IS 61701.and having warranty for output wattage, which should not be less than 90%at the end of 10 years and 80%at the end of 25 years. ( Make: TATA /Adani/Gautam/HR)
Supply, delivery & Erection of pre-fabricated M.S. steel structure of pable of extreme weather conditions including wind trust up to 150 KM/Hour with fixing of necessary MS ladder/railing and painting with appropriate weather coats including construction of R.C.C. foundation and all allied works as per approved drawing and direction of the E.I.C. Each structure should have angle of inclination as per the site conditions to take maximum isolation. The mounting structure steel shall be as per latest IS 2062\1992 standard and the galvanization of the mounting structure shall be in compliance of the latest IS for the structural material should be corrossion resistance and electrolytically compatible with the materials used to construct the module frame, including fastener, nuts and bolts. The thickness of the galvanization should be more than 75 Micron. Necessary protecdon towards rusting need to be provided either by coating or anodization.The minimum clearance of the structure from the roof level should be 1000 MM. Design to be approved by EIC before fabrication. Special type structural work should be aproved by EIC as per side condition. (Make: TATA / Jindal/Bansal)
Supply testing commissiong of 1 no PV Array Junction Box with A)The junction are to be provided in the SPD WITH IP 66 ENCLOSER AND ACDB WITH SPD AND IP 65 ENCLOSER 32 A MCB ,40 KA AC SPD. and for DCDB 32 A DP MCB and DC spd. P.C Distribution Panel Board {DPB) shall control AC power PCU/ inverter and should have necessary surge arrestors. interconnection to ACDB to mains at LT Bus bar. Designed for 10 KWP solar power plants with all protections as per MNRE guidelines. DC DPBs shall have sheet form encloser of dust and vermin proof conform to IP 66 protection. The bus bars should be made of Copper of suitable size and of suitable capacity fuse and MCBs / MCCB shall be provided for controlling DC power output, to the PCU along with suitable surge rectors. AC power distribution panel board (DPB) shall control the AC power from PCU/Inverter and should have necessary surge arrestors. Interconnection from SEDB to Mains at LT Bus bar while in grid tied mode. All switches and the circuit breakers connectors should come from to IEC 60947 part 1, 2 and 3. Is 60947 Part 1, 2 and 3. All the panels shall be meta clad totally enclosed rigid floor mounted air insulated cubicle type suitable for operation on 3 phase / single phase 415 volts. 50 Hz all indor panels will have protection of IP 54 or better. All outdor panels will have protection of IP65 or better. (Make- Hansel/Havells/Mersen)
ACDB 16 SWG poder coated, Double Door with IP 42/43 protection along with all necessary connection ( Make: L&T/Legrand/Schneider/Seimens)
Power Conditioning Unit [ Hybrid/ongrid ]: As SPV array produce direct current electricity, It is necessery to convert this direct current into alternating current and adjust the voltage levels to match the grid voltage. Conversion shall be achieved using an electronic inverter and the associated control and protection devices. All these components of the system are termed the " Power Conditioning Unit [ PCU]". In addition , the PCU shall also house MPPT [ Maximum Power Point Tracker] controller. inverter output should be compatible with the grid frequency.This PCU should support Net-metering function Utility facility. Typical technical features of the inverter should be as follows. including remote monitoring system(Web based on-line RMS system) 1.Rated AC power:- Three Phase, 50Hz 2.Max Supported Panel Power:- 11000Wp 3.Charge Controller:- MPPT 4. Rated output power 10 Kw (Make: TATA approved/Growatt/Sungrow/Thea/Power One)
Supply and laying of DC cable 1C*4 Sq mm Cu, 1.1KV grade for Solar (Finolex/RR/Polycab)
Supply and laying of 1.1 Kv grade 4C* 6 Sq mm PVC copper cable (Finolex/RR/Polycab)
Supply and laying of1.1 Kv grade 4C* 10 Sq mm PVC copper cable (Finolex/RR/Polycab)
Supply and installation of Kiosk
Supply,installation of System Earthings : Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-1987. In addition the lighting arrester/masts should also be earthed inside the array field, PCU, ACDB and DCDB should also be earthed properly.
Supply,installation of Lightning Protection system: The SPV power plants shall be provided with lightning & overvoltage protection.
Installation, Testing, commissioning of all above stated solar system and Transportation Charge including internal electrical wiring as per direction of EIC.
THE BUSINESS ENGINEERS INDIA
M/S INSILICA
JAYANTA GHOSH
LAKSHMI KANTA GUCHHAIT
RASH ELECTRICAL WORKS
TAN CONSULTANCY
SHAKE INTAZ
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .