Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Fee/PreQual/Technical/Finance | -19.81% | ₹23.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹27.5 L+₹3.8 L (15.8%)Admitted-Fee/PreQual/Technical/Finance 233 VILLAGE SADOPUR VILL SADOPUR POST DHOOM MANIKPUR G NOIDA DADRI GAUTAM BUDDHA NAGAR UTTAR PRADESH 203207 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 203207 | -7.11% | ₹27.5 L+₹3.8 L (15.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.4 L+₹5.7 L (23.8%)Admitted-Fee/PreQual/Technical/Finance | -0.71% | ₹29.4 L+₹5.7 L (23.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹29.7 L+₹5.9 L (24.7%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.7 L+₹5.9 L (24.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.7 L
EMD Value
₹59,500
Closing Date
28 May 2026, 5:00 pmClosed
EO
NAGAR PALIKA LOSAL
WORK NO 01
2026_DLB_560731_1
462
Open Tender
Civil Works
Percentage
120 days
NP LOSAL
REGISTERED FIRM
2 documents required · 2 mandatory
₹500
AS PER TENDER DOCUMENT
₹59,500
Yes
24 Jul 2026
20 May 2026
1 Jun 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work | |||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including
dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 145.8 | cum | 229.5 | ₹33,461.1 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 24.3 | cum | 4,575 | ₹1,11,172.5 |
| 1.03 | Random rubble masonry with hard stone in foundation and plinthCement mortar 1:6 (1 cement : 6 coarse sand) | 85.05 | cum | 4,860 | ₹4,13,343 |
| 1.04 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 86.25 | cum | 6,300 | ₹5,43,375 |
| 1.05 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 2,160 | cum | 178.5 | ₹3,85,560 |
| 1.06 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . 50mm thick. | 99 | sqm | 445 | ₹44,055 |
| 1.07 | Steel work welded in built up sections/ framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 800 | kg | 144.5 | ₹1,15,600 |
| 1.08 | Structural steel work riveted, bolted or welded in built up sections trusses and framed work, including cutting, hoisting, fixing in positionand applying a priming coat of approved steel primer all complete: | 1,600 | kg | 114.5 | ₹1,83,200 |
| 1.09 | Stone tile work for wall lining upto 10 m height with special adhesive over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement with an admixture of pigment to match the stone shade. 8mm thick (mirror polished and machine cut edge)Raj Nagar plain white marble/ Udaipur green marble/ Zebra black marble | 75 | sqm | 2,131 | ₹1,59,825 |
stage.html
html • 0.02 MB
finance_998042.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BOQ_998042.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .